Llawlyfr Cyfarwyddiadau Ffrâm Sengl Statig Boost B2-SSCT

Ffrâm Sengl Statig B2-SSCT

Manylebau:

  • Table feet: 2 pcs
  • Centre bracket: 1 pc
  • Column (right): 1 pc
  • Center rails: 2 pcs
  • Allen Wrench (4mm): 1 pc
  • Allen Wrench (5mm): 1 pc

Cyfarwyddiadau Defnydd Cynnyrch:

Cyfarwyddiadau Cynulliad:

  1. Cam 1: Llaciwch y bolltau sydd wedi'u gosod ymlaen llaw a
    addaswch hyd y ffrâm uchaf i gyd-fynd â maint y bwrdd
    brig.
  2. Cam 2: Insert the Column into the top frame,
    fix the lifting column with 4pcs screws M6x12.
  3. Cam 3: Place the table feet on the Column,
    rotate it to align, then tighten the pre-installed bolt.
  4. Cam 4: Rhowch y braced ochr ar y brig
    ffrâm a thynhau'r bolltau.
  5. Cam 5: Mount the tabletop and fix it with 14
    pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10.
    Tighten the pre-installed bolts on the top frame.

Gosod Hambwrdd Cebl:

  1. Cam 1: Trwsiwch y hambwrdd cebl (B2-SSCT) i'r
    cable tray arms (B2-SSARM) with 8 pcs M6x10 screws.
  2. Cam 2: Gosodwch y cromfachau U ar y ddesg
    frame with 4 pcs M8x10 screws. Mount the cable tray to the desk
    frame and fix it with 6 pcs M6x10 screws.

Gosod Panel Sgrin (Sgrin Preifatrwydd Shush30):

  1. Cam 1: Mewnosodwch y platiau wedi'u tapio i'r sgrin
    panel (plates can be found in B2-SBRAC carton).
  2. Cam 2: Install the screen brackets (B2-SBRAC)
    to the Shush30 Extrusion with 8 pcs M5x6 screws.
  3. Cam 3: Fix the screen brackets (B2-SBRAC) to
    the desk frame with 10 pcs M6x10 screws.

Eco Panel Screen Panel Installation:

  1. Cam 1: Install the screen brackets (B2-SBRAC)
    on the cable tray arm (B2-SSARM) with 10 PCS M6x10 Screws. The
    brackets direction as photos display.
  2. Cam 2: Rhowch y panel EPS ar y sgrin
    brackets using a 6mm drill bit (not included), drill out holes in
    Eco Panel Screen in line with back-to-back screen bracket holes.
    Place 8 x Double Ended Bolts M5*32mm -6mm through The screen
    bracket (B2-SBRAC) holes and the holes you have created in the Eco
    Panel Screen. Tighten double-ended bolt with an Allen key.

Cwestiynau Cyffredin (FAQ):

Q: How many table feet are included in the package?
A: There are two table feet included.
Q: What size screws are used for fixing the lifting
colofn?
A: You need to use 4pcs screws M6x12 for fixing the lifting
colofn.
Q: How many pcs of Allen Wrench are provided?
A: There is one Allen Wrench of 4mm and one Allen Wrench of 5mm
a ddarperir yn y pecyn.

“`

Boost Static Single Frame Instruction Manual
1

Rhannau cydran

RHIF. Enw'r Gydran

PCS

RHIF. Enw'r Gydran

PCS

1

Traed bwrdd

2

9

Braced canol

1

2

Colofn (dde)

1

10 Rheiliau canolog

2

3

Bollt: M6x12

5

11 Ffrâm uchaf-2

1

4

Sgriw: ST4x20

22

12 Column( left)

1

5

Cromfachau ochr

2

13 Wrench Allen (4mm)

1

6

Pad rwber

14

14 Wrench Allen (5mm)

1

7

Ffrâm uchaf-1

1

15 Tei Cebl

5

8

Bollt: M6x10

3

2

Cyfarwyddiadau Cymanfa
Cam 1 Llaciwch y bolltau sydd wedi'u gosod ymlaen llaw ac addaswch hyd y ffrâm uchaf i gyd-fynd â maint top y bwrdd.
Step 2 Inset the Column to the top frame,fix lifting column with 4pcs screws M6x12 like.
3

Step 3 Place the table feet on the Column and rotate it and make it align, then tighten the pre-installed bolt.
Cam 4 Rhowch y braced ochr ar y ffrâm uchaf a thynhau'r bolltau.
4

Step 5 Mount the tabletop and fix it with 14 pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10 Tighten the pre-installed bolts on the top fame
5

Gosod hambwrdd cebl Cam 1 – Trwsiwch yr hambwrdd cebl (B2-SSCT) i freichiau'r hambwrdd cebl (B2-SSARM) gydag 8 darn o sgriwiau M6x10.
Cam 2 – Gosodwch y bracedi U i ffrâm y ddesg gyda 4 darn o sgriwiau M8x10. – Mowntiwch y hambwrdd cebl i ffrâm y ddesg a'i drwsio gyda 6 darn o sgriwiau M6x10
6

Gosod panel sgrin (Sgrin Preifatrwydd Shush30) Cam 1 – Mewnosodwch y platiau wedi'u tapio i'r panel sgrin (mae'r platiau i'w cael yng ngharton B2-SBRAC)
Cam 2 – Gosodwch y bracedi sgrin (B2-SBRAC) i'r Allwthiad Shush30 gydag 8 darn o sgriwiau M5x6.
7

Cam 3 – Trwsiwch y bracedi sgrin (B2-SBRAC) i ffrâm y ddesg gyda 10 darn o sgriwiau M6x10.
8

Gosod panel sgrin EPS (Panel Eco 900mm U) Cam 1 – Gosodwch y bracedi sgrin (B2-SBRAC) ar fraich y hambwrdd cebl (B2-SSARM) gyda 10 Sgriw M6x10
Cyfeiriad y cromfachau fel y dangosir yn y lluniau.
Cam 2 – Rhowch y panel EPS ar y bracedi sgrin Gan ddefnyddio darn dril 6mm (heb ei gynnwys), driliwch dyllau yn Sgrin y Panel Eco yn unol â thyllau bracedi sgrin cefn wrth gefn (Nodyn: Mae Darnau Dril Carbid yn Gweithio Orau ar gyfer panel PET) – Rhowch 8 x Bollt Dwbl M5* 32mm – 6mm trwy dyllau'r braced sgrin (B2-SBRAC) a'r tyllau rydych chi wedi'u creu yn Sgrin y Panel Eco. Tynhau'r bollt dwbl gydag allwedd Allen.
9

Dogfennau / Adnoddau

Boost B2-SSCT Static Single Frame [pdfLlawlyfr Cyfarwyddiadau
B2-SSCT, B2-SSARM, B2-SBRAC, B2-SSCT Static Single Frame, B2-SSCT, Static Single Frame, Single Frame, Frame

Cyfeiriadau

Gadael sylw

Ni fydd eich cyfeiriad e-bost yn cael ei gyhoeddi. Mae meysydd gofynnol wedi'u marcio *