Boost B2-SSCT Static Single Frame

Spesifikaasjes
- Table feet: 2 stk
- Centre bracket: 1 stk
- Column (right): 1 stk
- Center rails: 2 stk
- Inbussleutel (4mm): 1 stk
- Inbussleutel (5mm): 1 stk
Produkt Usage Ynstruksjes
Montage ynstruksjes
- Stap 1: Loosen the pre-installed bolts and adjust the length of the top frame to match the size of the table top.
- Stap 2: Insert the Column into the top frame, fix the lifting column with 4pcs screws M6x12.
- Stap 3: Place the table feet on the Column, rotate it to align, then tighten the pre-installed bolt.
- Stap 4: Plak de sydbeugel op it boppeste frame en draai de bouten oan.
- Stap 5: Mount the tabletop and fix it with 14 pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10. Tighten the pre-installed bolts on the top frame.
Kabel Tray Ynstallaasje
- Stap 1: Fix the cable tray (B2-SSCT) to the cable tray arms (B2-SSARM) with 8 pcs M6x10 screws.
- Stap 2: Install the U brackets to the desk frame with 4 pcs M8x10 screws. Mount the cable tray to the desk frame and fix it with 6 pcs M6x10 screws.
Ynstallearjen fan skermpaniel (Shush30 privacyskerm)
- Stap 1: Insert the tapped plates into the screen panel (plates can be found in the B2-SBRAC carton).
- Stap 2: Install the screen brackets (B2-SBRAC) to the Shush30 Extrusion with 8 pcs M5x6 screws.
- Stap 3: Fix the screen brackets (B2-SBRAC) to the desk frame with 10 pcs M6x10 screws.
Eco Panel Screen Panel Installation
- Stap 1: Install the screen brackets (B2-SBRAC) on the cable tray arm (B2-SSARM) with 10 PCS M6x10 Screws. The direction as the photos display.
- Stap 2: Place the EPS panel on the screen brackets using a 6mm drill bit (not included), drill out holes in the Eco Panel Screen in line with the back-to-back screen bracket holes.
- Place 8 x Double Ended Bolts M5*32mm -6mm through the screen bracket (B2-SBRAC) holes and the holes you have created in the Eco Panel Screen. Tighten the double-ended bolt with an Allen key.
 
Component parts

| NEE. | Component Namme | PCS | 
| 1 | Tafel fuotten | 2 | 
| 2 | Kolom (rjochts) | 1 | 
| 3 | Bolt: M6x12 | 5 | 
| 4 | Skroef: ST4x20 | 22 | 
| 5 | Side heakjes | 2 | 
| 6 | Rubber pad | 14 | 
| 7 | Top frame-1 | 1 | 
| 8 | Bolt: M6x10 | 3 | 
| NEE. | Component Namme | PCS | 
| 9 | Sintrale beugel | 1 | 
| 10 | Sintrum rails | 2 | 
| 11 | Top frame-2 | 1 | 
| 12 | Column( left) | 1 | 
| 13 | Allen Wrench (4mm) | 1 | 
| 14 | Allen Wrench (5mm) | 1 | 
| 15 | Cable Tie | 5 | 
Montage ynstruksjes
- Stap 1
- Loosen the pre-installed bolts and adjust the length of the top frame to match the size of the table top. 
 
- Loosen the pre-installed bolts and adjust the length of the top frame to match the size of the table top.
- Stap 2
- Insert the Column into the top frame, fix the lifting column with 4pcs screws M6x12. 
 
- Insert the Column into the top frame, fix the lifting column with 4pcs screws M6x12.
- Stap 3
- Place the table feet on the Column and rotate it and make it align, then tighten the pre-installed bolt. 
 
- Place the table feet on the Column and rotate it and make it align, then tighten the pre-installed bolt.
- Stap 4
- Plak de sydbeugel op it boppeste frame en draai de bouten oan. 
 
- Plak de sydbeugel op it boppeste frame en draai de bouten oan.
- Stap 5
- Montearje it tafelblad en befestigje it mei 14 stikken skroeven ST4x20;
- Fix the centre bracket with 2 pcs of screws M6x10.
- Draai de foarôf ynstalleare bouten op it boppeste frame oan. 
 
Kabel tray ynstallaasje
- Stap 1
- Fix the cable tray(B2-SSCT ) to the cable tray arms(B2-SSARM) with 8 pcs M6x10 screws. 
- Stap 2
- Ynstallearje de U-beugels oan it buro-frame mei 4 pcs M8x10-skroeven.
- Befestigje de kabelbak oan it buro-frame en befestigje it mei 6 stikken M6x10-skroeven 
 
- Fix the cable tray(B2-SSCT ) to the cable tray arms(B2-SSARM) with 8 pcs M6x10 screws.
Ynstallearjen fan skermpaniel (Shush30 privacyskerm)
- Stap 1
- Insert the tapped plates into the screen panel ( plates can be found in the B2-SBRAC carton ) 
 
- Insert the tapped plates into the screen panel ( plates can be found in the B2-SBRAC carton )
- Stap 2
- Ynstallearje de skermbeugels (B2-SBRAC) oan 'e Shush30-ekstrudering mei 8 stikken M5x6-skroeven. 
 
- Ynstallearje de skermbeugels (B2-SBRAC) oan 'e Shush30-ekstrudering mei 8 stikken M5x6-skroeven.
- Stap 3
- Befestigje de skermbeugels (B2-SBRAC) oan it buroframe mei 10 M6x10-skroeven. 
 
- Befestigje de skermbeugels (B2-SBRAC) oan it buroframe mei 10 M6x10-skroeven.
EPS (900mm H Eco Panel) Skermpanielynstallaasje
- Stap 1
- Install the screen brackets(B2-SBRAC) on the cable tray arm (B2-SSARM)with 10 PCS M6x10 Screws
- The direction as the photos display. 
 
- Stap 2
- Plak it EPS-paniel op 'e skermbeugels
- Using a 6mm drill bit ( not included ), drill out holes in Eco Panel Screen in line with to back screen bracket holes ( Note: Carbide Drill Bits Work Best For PET panel )
- Place 8 x Double Ended Bolts M5* 32mm – 6mm through the screen bracket ( B2-SBRAC ) holes and the holes you have created in the Eco Panel Screen. Tighten the double-ended bolt with the Allen key. 
 
Faak stelde fragen
How many table feet are included in the package?
There are two table feet included.
What size screws are used for fixing the lifting column?
You need to use 4pcs of screws M6x12 for fixing the lifting column.
How many pcs of Allen Wrench are provided?
There is one Allen Wrench of 4mm and one Allen Wrench of 5mm provided in the package.
Dokuminten / Resources
|  | Boost B2-SSCT Static Single Frame [pdf] Ynstruksjehânlieding B2-SSCT, B2-SSARM, B2-SBRAC, B2-SSCT Static Single Frame, B2-SSCT, Static Single Frame, Single Frame, Frame | 
 

