Boost B2-SSCT Static Single Frame Instruction Manual

B2-SSCT Static Single Frame

Sonraíochtaí:

  • Table feet: 2 pcs
  • Centre bracket: 1 pc
  • Column (right): 1 pc
  • Center rails: 2 pcs
  • Allen Wrench (4mm): 1 pc
  • Allen Wrench (5mm): 1 pc

Treoracha Úsáide Táirge:

Treoracha Tionóil:

  1. Céim 1: Scaoil na boltaí réamhshuiteáilte agus
    coigeartaigh fad an fhráma uachtair chun go mbeidh sé oiriúnach do mhéid an bhoird
    barr.
  2. Céim 2: Insert the Column into the top frame,
    fix the lifting column with 4pcs screws M6x12.
  3. Céim 3: Place the table feet on the Column,
    rotate it to align, then tighten the pre-installed bolt.
  4. Céim 4: Cuir an lúibín taobh ar an mbarr
    fráma agus na boltaí a theannadh.
  5. Céim 5: Mount the tabletop and fix it with 14
    pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10.
    Tighten the pre-installed bolts on the top frame.

Suiteáil Tráidire Cábla:

  1. Céim 1: Socraigh an tráidire cábla (B2-SSCT) leis an
    cable tray arms (B2-SSARM) with 8 pcs M6x10 screws.
  2. Céim 2: Suiteáil na lúibíní U ar an deasc
    frame with 4 pcs M8x10 screws. Mount the cable tray to the desk
    frame and fix it with 6 pcs M6x10 screws.

Suiteáil Painéal Scáileáin (Scáileán Príobháideachta Shush30):

  1. Céim 1: Cuir na plátaí tapáilte isteach sa scáileán
    panel (plates can be found in B2-SBRAC carton).
  2. Céim 2: Install the screen brackets (B2-SBRAC)
    to the Shush30 Extrusion with 8 pcs M5x6 screws.
  3. Céim 3: Fix the screen brackets (B2-SBRAC) to
    the desk frame with 10 pcs M6x10 screws.

Suiteáil Painéal Scáileáin Éiceapainéil:

  1. Céim 1: Install the screen brackets (B2-SBRAC)
    on the cable tray arm (B2-SSARM) with 10 PCS M6x10 Screws. The
    brackets direction as photos display.
  2. Céim 2: Cuir an painéal EPS ar an scáileán
    brackets using a 6mm drill bit (not included), drill out holes in
    Eco Panel Screen in line with back-to-back screen bracket holes.
    Place 8 x Double Ended Bolts M5*32mm -6mm through The screen
    bracket (B2-SBRAC) holes and the holes you have created in the Eco
    Panel Screen. Tighten double-ended bolt with an Allen key.

Ceisteanna Coitianta (FAQ):

Q: How many table feet are included in the package?
A: There are two table feet included.
Q: What size screws are used for fixing the lifting
column?
A: You need to use 4pcs screws M6x12 for fixing the lifting
colún.
Q: How many pcs of Allen Wrench are provided?
A: There is one Allen Wrench of 4mm and one Allen Wrench of 5mm
ar fáil sa phacáiste.

“`

Boost Static Single Frame Instruction Manual
1

Páirteanna comhpháirte

NÍL. Ainm na Comhpháirte

PCS

NÍL. Ainm na Comhpháirte

PCS

1

Cosa boird

2

9

Lúibín lár

1

2

Colún ( ar dheis)

1

10 ráille lárnacha

2

3

Bolt: M6x12

5

11 Fráma barr-2

1

4

Scriú: ST4x20

22

12 Column( left)

1

5

lúibíní taobh

2

13 Eochair Allen (4mm)

1

6

Ceap rubair

14

14 Eochair Allen (5mm)

1

7

Barr fráma-1

1

15 Carbhait Cábla

5

8

Bolt: M6x10

3

2

Treoracha Tionóil
Céim 1 Scaoil na boltaí réamhshuiteáilte agus Coigeartaigh fad an fhráma uachtair chun go mbeidh sé in oiriúint do mhéid bharr an bhoird.
Step 2 Inset the Column to the top frame,fix lifting column with 4pcs screws M6x12 like.
3

Step 3 Place the table feet on the Column and rotate it and make it align, then tighten the pre-installed bolt.
Céim 4 Cuir an lúibín taobh ar an bhfráma barr agus teannaigh na boltaí.
4

Step 5 Mount the tabletop and fix it with 14 pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10 Tighten the pre-installed bolts on the top fame
5

Suiteáil tráidire cábla Céim 1 – Socraigh an tráidire cábla (B2-SSCT) le hairm an tráidire cábla (B2-SSARM) le 8 scriú M6x10.
Céim 2 – Suiteáil na lúibíní U ar fhráma an deisce le 4 scriúnna M8x10. – Cuir an tráidire cábla ar fhráma an deisce agus socraigh é le 6 scriúnna M6x10.
6

Suiteáil painéil scáileáin (Scáileán Príobháideachta Shush30) Céim 1 – Cuir na plátaí tapáilte isteach sa phainéal scáileáin (is féidir na plátaí a fháil i gcartán B2-SBRAC)
Céim 2 – Suiteáil na lúibíní scáileáin (B2-SBRAC) ar an Easbhrúite Shush30 le 8 scriú M5x6.
7

Céim 3 – Daingnigh lúibíní an scáileáin (B2-SBRAC) le fráma an deisce le 10 scriú M6x10.
8

Suiteáil painéil scáileáin EPS (Painéal Éicea 900mm A) Céim 1 – Suiteáil na lúibíní scáileáin (B2-SBRAC) ar ghéag an tráidire cábla (B2-SSARM) le 10 scriú M6x10
Treo na lúibíní mar a thaispeántar sna grianghraif.
Céim 2 – Cuir an painéal EPS ar lúibíní an scáileáin. Ag baint úsáide as giotán druileála 6mm (nach bhfuil san áireamh), druileáil poill i Scáileán an Phainéil Éicea-Choimeádáin i gcomhréir le poill lúibín an scáileáin cúl le cúl (Nóta: Oibríonn Giotaí Druileála Carbaíde is Fearr do phainéal PET). – Cuir 8 x Bolt Dúbailte M5* 32mm – 6mm trí phoill an lúibín scáileáin (B2-SBRAC) agus na poill atá cruthaithe agat i Scáileán an Phainéil Éicea-Choimeádáin. Teannaigh an bolt dúbailte le heochair Allen.
9

Doiciméid / Acmhainní

Boost B2-SSCT Static Single Frame [pdfLámhleabhar Treoracha
B2-SSCT, B2-SSARM, B2-SBRAC, B2-SSCT Static Single Frame, B2-SSCT, Static Single Frame, Single Frame, Frame

Tagairtí

Fág trácht

Ní fhoilseofar do sheoladh ríomhphoist. Tá réimsí riachtanacha marcáilte *