Boost B2-SSCT Static Single Frame

Boost-B2-SSCT-Static-Single-Frame-PRODUCT-1

Specifications

  • Table feet: 2 pcs
  • Centre bracket: 1 pc
  • Column (right): 1 pc
  • Center rails: 2 pcs
  • Allen Wrench (4mm): 1 pc
  • Allen Wrench (5mm): 1 pc

Product Usage Instructions

Assembly Instructions

  1. Step 1: Loosen the pre-installed bolts and adjust the length of the top frame to match the size of the table top.
  2. Step 2: Insert the Column into the top frame, fix the lifting column with 4pcs screws M6x12.
  3. Step 3: Place the table feet on the Column, rotate it to align, then tighten the pre-installed bolt.
  4. Step 4: Place the side bracket on the top frame and tighten the bolts.
  5. Step 5: Mount the tabletop and fix it with 14 pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10. Tighten the pre-installed bolts on the top frame.

Cable Tray Installation

  1. Step 1: Fix the cable tray (B2-SSCT) to the cable tray arms (B2-SSARM) with 8 pcs M6x10 screws.
  2. Step 2: Install the U brackets to the desk frame with 4 pcs M8x10 screws. Mount the cable tray to the desk frame and fix it with 6 pcs M6x10 screws.

Screen Panel Installation (Shush30 Privacy Screen)

  1. Step 1: Insert the tapped plates into the screen panel (plates can be found in the B2-SBRAC carton).
  2. Step 2: Install the screen brackets (B2-SBRAC) to the Shush30 Extrusion with 8 pcs M5x6 screws.
  3. Step 3: Fix the screen brackets (B2-SBRAC) to the desk frame with 10 pcs M6x10 screws.

Eco Panel Screen Panel Installation

  1. Step 1: Install the screen brackets (B2-SBRAC) on the cable tray arm (B2-SSARM) with 10 PCS M6x10 Screws. The direction as the photos display.
  2. Step 2: Place the EPS panel on the screen brackets using a 6mm drill bit (not included), drill out holes in the Eco Panel Screen in line with the back-to-back screen bracket holes.
    • Place 8 x Double Ended Bolts M5*32mm -6mm through the screen bracket (B2-SBRAC) holes and the holes you have created in the Eco Panel Screen. Tighten the double-ended bolt with an Allen key.

Component parts

Boost-B2-SSCT-Static-Single-Frame-FIG-1

NO. Component Name PCS
1 Table feet 2
2 Column( right) 1
3 Bolt: M6x12 5
4 Screw: ST4x20 22
5 Side brackets 2
6 Rubber pad 14
7 Top frame-1 1
8 Bolt: M6x10 3
NO. Component Name PCS
9 Centre bracket 1
10 Center rails 2
11 Top frame-2 1
12 Column( left) 1
13 Allen Wrench(4mm) 1
14 Allen Wrench(5mm) 1
15 Cable Tie 5

Assembly Instructions

  1. Step 1
    • Loosen the pre-installed bolts and adjust the length of the top frame to match the size of the table top.Boost-B2-SSCT-Static-Single-Frame-FIG-2
  2. Step 2
    • Insert the Column into the top frame, fix the lifting column with 4pcs screws M6x12.Boost-B2-SSCT-Static-Single-Frame-FIG-3
  3. Step 3
    • Place the table feet on the Column and rotate it and make it align, then tighten the pre-installed bolt.Boost-B2-SSCT-Static-Single-Frame-FIG-4
  4. Step 4
    • Place the side bracket on the top frame and tighten the bolts.Boost-B2-SSCT-Static-Single-Frame-FIG-5
  5. Step 5
    • Mount the tabletop and fix it with 14 pcs screws ST4x20;
    • Fix the centre bracket with 2 pcs of screws M6x10.
    • Tighten the pre-installed bolts on the top frame.Boost-B2-SSCT-Static-Single-Frame-FIG-6

Cable tray installation

  1. Step 1
    • Fix the cable tray(B2-SSCT ) to the cable tray arms(B2-SSARM) with 8 pcs M6x10 screws.Boost-B2-SSCT-Static-Single-Frame-FIG-7
    • Step 2
    • Install the U brackets to the desk frame with 4 pcs M8x10 screws.
    • Mount the cable tray to the desk frame and fix it with 6 pcs M6x10 screwsBoost-B2-SSCT-Static-Single-Frame-FIG-8

Screen panel installation ( Shush30 Privacy Screen )

  1. Step 1
    • Insert the tapped plates into the screen panel ( plates can be found in the B2-SBRAC carton )Boost-B2-SSCT-Static-Single-Frame-FIG-9
  2. Step 2
    • Install the screen brackets ( B2-SBRAC )to the Shush30 Extrusion with 8 pcs M5x6 screws.Boost-B2-SSCT-Static-Single-Frame-FIG-10
  3. Step 3
    • Fix the screen brackets ( B2-SBRAC ) to the desk frame with 10 pcs M6x10 screws.Boost-B2-SSCT-Static-Single-Frame-FIG-11

EPS ( 900mm H Eco Panel ) Screen panel installation

  1. Step 1
    • Install the screen brackets(B2-SBRAC) on the cable tray arm (B2-SSARM)with 10 PCS M6x10 Screws
    • The direction as the photos display.Boost-B2-SSCT-Static-Single-Frame-FIG-12
  2. Step 2
    • Place the EPS panel on the screen brackets
    • Using a 6mm drill bit ( not included ), drill out holes in Eco Panel Screen in line with to back screen bracket holes ( Note: Carbide Drill Bits Work Best For PET panel )
    • Place 8 x Double Ended Bolts M5* 32mm – 6mm through the screen bracket ( B2-SBRAC ) holes and the holes you have created in the Eco Panel Screen. Tighten the double-ended bolt with the Allen key.Boost-B2-SSCT-Static-Single-Frame-FIG-13

Frequently Asked Questions

How many table feet are included in the package?

There are two table feet included.

What size screws are used for fixing the lifting column?

You need to use 4pcs of screws M6x12 for fixing the lifting column.

How many pcs of Allen Wrench are provided?

There is one Allen Wrench of 4mm and one Allen Wrench of 5mm provided in the package.

Documents / Resources

Boost B2-SSCT Static Single Frame [pdf] Instruction Manual
B2-SSCT, B2-SSARM, B2-SBRAC, B2-SSCT Static Single Frame, B2-SSCT, Static Single Frame, Single Frame, Frame

References

Leave a comment

Your email address will not be published. Required fields are marked *