B2-SSCT Static Single Frame
“
Specifications:
- Table feet: 2 pcs
- Centre bracket: 1 pc
- Column (right): 1 pc
- Center rails: 2 pcs
- Allen Wrench (4mm): 1 pc
- Allen Wrench (5mm): 1 pc
Product Usage Instructions:
Assembly Instructions:
- Step 1: Loosen the pre-installed bolts and
adjust the length of the top frame to match the size of the table
top. - Step 2: Insert the Column into the top frame,
fix the lifting column with 4pcs screws M6x12. - Step 3: Place the table feet on the Column,
rotate it to align, then tighten the pre-installed bolt. - Step 4: Place the side bracket on the top
frame and tighten the bolts. - Step 5: Mount the tabletop and fix it with 14
pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10.
Tighten the pre-installed bolts on the top frame.
Cable Tray Installation:
- Step 1: Fix the cable tray (B2-SSCT) to the
cable tray arms (B2-SSARM) with 8 pcs M6x10 screws. - Step 2: Install the U brackets to the desk
frame with 4 pcs M8x10 screws. Mount the cable tray to the desk
frame and fix it with 6 pcs M6x10 screws.
Screen Panel Installation (Shush30 Privacy Screen):
- Step 1: Insert the tapped plates to the screen
panel (plates can be found in B2-SBRAC carton). - Step 2: Install the screen brackets (B2-SBRAC)
to the Shush30 Extrusion with 8 pcs M5x6 screws. - Step 3: Fix the screen brackets (B2-SBRAC) to
the desk frame with 10 pcs M6x10 screws.
Eco Panel Screen Panel Installation:
- Step 1: Install the screen brackets (B2-SBRAC)
on the cable tray arm (B2-SSARM) with 10 PCS M6x10 Screws. The
brackets direction as photos display. - Step 2: Place the EPS panel on the screen
brackets using a 6mm drill bit (not included), drill out holes in
Eco Panel Screen in line with back-to-back screen bracket holes.
Place 8 x Double Ended Bolts M5*32mm -6mm through The screen
bracket (B2-SBRAC) holes and the holes you have created in the Eco
Panel Screen. Tighten double-ended bolt with an Allen key.
Frequently Asked Questions (FAQ):
- Q: How many table feet are included in the package?
- A: There are two table feet included.
- Q: What size screws are used for fixing the lifting
column? - A: You need to use 4pcs screws M6x12 for fixing the lifting
column. - Q: How many pcs of Allen Wrench are provided?
- A: There is one Allen Wrench of 4mm and one Allen Wrench of 5mm
provided in the package.
“`
Boost Static Single Frame Instruction Manual
1
Component parts
NO. Component Name
PCS
NO. Component Name
PCS
1
Table feet
2
9
Centre bracket
1
2
Column( right)
1
10 Center rails
2
3
Bolt: M6x12
5
11 Top frame-2
1
4
Screw:ST4x20
22
12 Column( left)
1
5
Side brackets
2
13 Allen Wrench(4mm)
1
6
Rubber pad
14
14 Allen Wrench(5mm)
1
7
Top frame-1
1
15 Cable Tie
5
8
Bolt: M6x10
3
2
Assembly Instructions
Step 1 Loosen the pre-installed bolts and Adjust the length of the top frame to match the size of the table top.
Step 2 Inset the Column to the top frame,fix lifting column with 4pcs screws M6x12 like.
3
Step 3 Place the table feet on the Column and rotate it and make it align, then tighten the pre-installed bolt.
Step 4 Place the side bracket on the top frame and tighten the bolts.
4
Step 5 Mount the tabletop and fix it with 14 pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10 Tighten the pre-installed bolts on the top fame
5
Cable tray installation Step 1 – Fix the cable tray(B2-SSCT ) to the cable tray arms(B2-SSARM) with 8 pcs M6x10 screws.
Step 2 – Install the U brackets to the desk frame with 4 pcs M8x10 screws. – Mount the cable tray to the desk frame and fix it with 6 pcs M6x10 screws
6
Screen panel installation ( Shush30 Privacy Screen ) Step 1 – Insert the tapped plates to the screen panel ( plates can be found in B2-SBRAC carton )
Step 2 – Install the screen brackets ( B2-SBRAC )to the Shush30 Extrusion with 8 pcs M5x6 screws.
7
Step 3 – Fix the screen brackets ( B2-SBRAC ) to the desk frame with 10 pcs M6x10 screws.
8
EPS ( 900mm H Eco Panel ) Screen panel installation Step 1 – Install the screen brackets(B2-SBRAC) on the cable tray arm (B2-SSARM)with 10 PCS M6x10 Screws
The brackets direction as photos display.
Step 2 – Place the EPS panel on the screen brackets Using a 6mm drill bit ( not included ), drill out holes in Eco Panel Screen in line with back to back screen bracket holes ( Note: Carbide Drill Bits Work Best For PET panel ) – Place 8 x Double Ended Bolts M5* 32mm – 6mm through The screen bracket ( B2-SBRAC ) holes and the holes you have created in the Eco Panel Screen. Tighten double ended bolt with Allen key.
9
Documents / Resources
![]() |
Boost B2-SSCT Static Single Frame [pdf] Instruction Manual B2-SSCT, B2-SSARM, B2-SBRAC, B2-SSCT Static Single Frame, B2-SSCT, Static Single Frame, Single Frame, Frame |