Specifications:

  • Table feet: 2 pcs
  • Centre bracket: 1 pc
  • Column (right): 1 pc
  • Center rails: 2 pcs
  • Allen Wrench (4mm): 1 pc
  • Allen Wrench (5mm): 1 pc

Product Usage Instructions:

Assembly Instructions:

  1. Step 1: Loosen the pre-installed bolts and
    adjust the length of the top frame to match the size of the table
    top.
  2. Step 2: Insert the Column into the top frame,
    fix the lifting column with 4pcs screws M6x12.
  3. Step 3: Place the table feet on the Column,
    rotate it to align, then tighten the pre-installed bolt.
  4. Step 4: Place the side bracket on the top
    frame and tighten the bolts.
  5. Step 5: Mount the tabletop and fix it with 14
    pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10.
    Tighten the pre-installed bolts on the top frame.

Cable Tray Installation:

  1. Step 1: Fix the cable tray (B2-SSCT) to the
    cable tray arms (B2-SSARM) with 8 pcs M6x10 screws.
  2. Step 2: Install the U brackets to the desk
    frame with 4 pcs M8x10 screws. Mount the cable tray to the desk
    frame and fix it with 6 pcs M6x10 screws.

Screen Panel Installation (Shush30 Privacy Screen):

  1. Step 1: Insert the tapped plates to the screen
    panel (plates can be found in B2-SBRAC carton).
  2. Step 2: Install the screen brackets (B2-SBRAC)
    to the Shush30 Extrusion with 8 pcs M5x6 screws.
  3. Step 3: Fix the screen brackets (B2-SBRAC) to
    the desk frame with 10 pcs M6x10 screws.

Eco Panel Screen Panel Installation:

  1. Step 1: Install the screen brackets (B2-SBRAC)
    on the cable tray arm (B2-SSARM) with 10 PCS M6x10 Screws. The
    brackets direction as photos display.
  2. Step 2: Place the EPS panel on the screen
    brackets using a 6mm drill bit (not included), drill out holes in
    Eco Panel Screen in line with back-to-back screen bracket holes.
    Place 8 x Double Ended Bolts M5*32mm -6mm through The screen
    bracket (B2-SBRAC) holes and the holes you have created in the Eco
    Panel Screen. Tighten double-ended bolt with an Allen key.

Frequently Asked Questions (FAQ):

Q: How many table feet are included in the package?
A: There are two table feet included.
Q: What size screws are used for fixing the lifting
column?
A: You need to use 4pcs screws M6x12 for fixing the lifting
column.
Q: How many pcs of Allen Wrench are provided?
A: There is one Allen Wrench of 4mm and one Allen Wrench of 5mm
provided in the package.

“`

Boost Static Single Frame Instruction Manual
1

Component parts

NO. Component Name

PCS

NO. Component Name

PCS

1

Table feet

2

9

Centre bracket

1

2

Column( right)

1

10 Center rails

2

3

Bolt: M6x12

5

11 Top frame-2

1

4

Screw:ST4x20

22

12 Column( left)

1

5

Side brackets

2

13 Allen Wrench(4mm)

1

6

Rubber pad

14

14 Allen Wrench(5mm)

1

7

Top frame-1

1

15 Cable Tie

5

8

Bolt: M6x10

3

2

Assembly Instructions
Step 1 Loosen the pre-installed bolts and Adjust the length of the top frame to match the size of the table top.
Step 2 Inset the Column to the top frame,fix lifting column with 4pcs screws M6x12 like.
3

Step 3 Place the table feet on the Column and rotate it and make it align, then tighten the pre-installed bolt.
Step 4 Place the side bracket on the top frame and tighten the bolts.
4

Step 5 Mount the tabletop and fix it with 14 pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10 Tighten the pre-installed bolts on the top fame
5

Cable tray installation Step 1 – Fix the cable tray(B2-SSCT ) to the cable tray arms(B2-SSARM) with 8 pcs M6x10 screws.
Step 2 – Install the U brackets to the desk frame with 4 pcs M8x10 screws. – Mount the cable tray to the desk frame and fix it with 6 pcs M6x10 screws
6

Screen panel installation ( Shush30 Privacy Screen ) Step 1 – Insert the tapped plates to the screen panel ( plates can be found in B2-SBRAC carton )
Step 2 – Install the screen brackets ( B2-SBRAC )to the Shush30 Extrusion with 8 pcs M5x6 screws.
7

Step 3 – Fix the screen brackets ( B2-SBRAC ) to the desk frame with 10 pcs M6x10 screws.
8

EPS ( 900mm H Eco Panel ) Screen panel installation Step 1 – Install the screen brackets(B2-SBRAC) on the cable tray arm (B2-SSARM)with 10 PCS M6x10 Screws
The brackets direction as photos display.
Step 2 – Place the EPS panel on the screen brackets Using a 6mm drill bit ( not included ), drill out holes in Eco Panel Screen in line with back to back screen bracket holes ( Note: Carbide Drill Bits Work Best For PET panel ) – Place 8 x Double Ended Bolts M5* 32mm – 6mm through The screen bracket ( B2-SBRAC ) holes and the holes you have created in the Eco Panel Screen. Tighten double ended bolt with Allen key.
9

Documents / Resources

Boost B2-SSCT Static Single Frame [pdf] Instruction Manual
B2-SSCT, B2-SSARM, B2-SBRAC, B2-SSCT Static Single Frame, B2-SSCT, Static Single Frame, Single Frame, Frame

References

Leave a comment

Your email address will not be published. Required fields are marked *