Boost B2-SSCT Static Single Frame Instruction Manual

B2-SSCT Static Single Frame

Sònrachaidhean:

  • Table feet: 2 pcs
  • Centre bracket: 1 pc
  • Column (right): 1 pc
  • Center rails: 2 pcs
  • Allen Wrench (4mm): 1 pc
  • Allen Wrench (5mm): 1 pc

Stiùireadh airson cleachdadh bathar:

Stiùireadh co-chruinneachaidh:

  1. Ceum 1: Loosen the pre-installed bolts and
    adjust the length of the top frame to match the size of the table
    mhullaich.
  2. Ceum 2: Insert the Column into the top frame,
    fix the lifting column with 4pcs screws M6x12.
  3. Ceum 3: Place the table feet on the Column,
    rotate it to align, then tighten the pre-installed bolt.
  4. Ceum 4: Place the side bracket on the top
    frame and tighten the bolts.
  5. Ceum 5: Mount the tabletop and fix it with 14
    pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10.
    Tighten the pre-installed bolts on the top frame.

Stàladh treidhe càbaill:

  1. Ceum 1: Fix the cable tray (B2-SSCT) to the
    cable tray arms (B2-SSARM) with 8 pcs M6x10 screws.
  2. Ceum 2: Install the U brackets to the desk
    frame with 4 pcs M8x10 screws. Mount the cable tray to the desk
    frame and fix it with 6 pcs M6x10 screws.

Stàladh Pannal Sgrion (Sgrion Prìobhaideachd Shush30):

  1. Ceum 1: Cuir na pleitean tapte a-steach don sgrion
    panel (plates can be found in B2-SBRAC carton).
  2. Ceum 2: Install the screen brackets (B2-SBRAC)
    to the Shush30 Extrusion with 8 pcs M5x6 screws.
  3. Ceum 3: Fix the screen brackets (B2-SBRAC) to
    the desk frame with 10 pcs M6x10 screws.

Stàladh Pannal Sgrion Eco Panel:

  1. Ceum 1: Install the screen brackets (B2-SBRAC)
    on the cable tray arm (B2-SSARM) with 10 PCS M6x10 Screws. The
    brackets direction as photos display.
  2. Ceum 2: Cuir am pannal EPS air an sgrion
    brackets using a 6mm drill bit (not included), drill out holes in
    Eco Panel Screen in line with back-to-back screen bracket holes.
    Place 8 x Double Ended Bolts M5*32mm -6mm through The screen
    bracket (B2-SBRAC) holes and the holes you have created in the Eco
    Panel Screen. Tighten double-ended bolt with an Allen key.

Ceistean Cumanta (FAQ):

Q: How many table feet are included in the package?
A: There are two table feet included.
Q: What size screws are used for fixing the lifting
column?
A: You need to use 4pcs screws M6x12 for fixing the lifting
colbh.
Q: How many pcs of Allen Wrench are provided?
A: There is one Allen Wrench of 4mm and one Allen Wrench of 5mm
air a thoirt seachad sa phacaid.

“`

Boost Static Single Frame Instruction Manual
1

Pàirtean co-phàirteach

CHAN EIL. Ainm na Co-phàirt

PCS

CHAN EIL. Ainm na Co-phàirt

PCS

1

Cois bùird

2

9

Braca meadhan

1

2

Colbh (deas)

1

10 Rèilean meadhanach

2

3

Bolt: M6x12

5

11 Frèam àrd-2

1

4

Sgriubha: ST4x20

22

12 Column( left)

1

5

Brataichean taobh

2

13 Iuchair Allen (4mm)

1

6

Ceap rubair

14

14 Iuchair Allen (5mm)

1

7

Am frèam as àirde - 1

1

15 Ceangal Càball

5

8

Bolt: M6x10

3

2

Stiùireadh Co-chruinneachadh
Ceum 1 Fuasgail na boltaichean a chaidh a stàladh ro-làimh agus atharraich fad a’ fhrèam as àirde gus a bhith a rèir meud mullach a’ bhùird.
Step 2 Inset the Column to the top frame,fix lifting column with 4pcs screws M6x12 like.
3

Step 3 Place the table feet on the Column and rotate it and make it align, then tighten the pre-installed bolt.
Ceum 4 Cuir am bracaid taobh air a’ fhrèam as àirde agus teannaich na boltaichean.
4

Step 5 Mount the tabletop and fix it with 14 pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10 Tighten the pre-installed bolts on the top fame
5

Cable tray installation Step 1 – Fix the cable tray(B2-SSCT ) to the cable tray arms(B2-SSARM) with 8 pcs M6x10 screws.
Ceum 2 – Stàlaich na camagan U ri frèam an deasg le 4 sgriothan M8x10. – Cuir an treidhe càball ri frèam an deasg agus daingnich e le 6 sgriothan M6x10.
6

Screen panel installation ( Shush30 Privacy Screen ) Step 1 – Insert the tapped plates to the screen panel ( plates can be found in B2-SBRAC carton )
Step 2 – Install the screen brackets ( B2-SBRAC )to the Shush30 Extrusion with 8 pcs M5x6 screws.
7

Ceum 3 – Ceangail na camagan sgrion (B2-SBRAC) ri frèam an deasg le 10 pìosan sgriothan M6x10.
8

Stàladh pannal sgrion EPS (Pannal Eco 900mm À) Ceum 1 – Stàlaich na camagan sgrion (B2-SBRAC) air gàirdean an treidhe càball (B2-SSARM) le 10 sgriothan M6x10
Stiùireadh nam bragan mar a chithear sna dealbhan.
Ceum 2 – Cuir am pannal EPS air bracaid an sgrion. A’ cleachdadh drile 6mm (nach eil air a ghabhail a-steach), drile tuill ann an Sgrion a’ Phannail Eco a rèir tuill bracaid an sgrion cùil ri cùl (Nota: Is e drilean carbide as fheàrr airson pannal PET) – Cuir 8 x Boltaichean dà-cheann M5* 32mm – 6mm tro thuill a’ bhracaid sgrion (B2-SBRAC) agus na tuill a chruthaich thu ann an Sgrion a’ Phannail Eco. Teannaich am bolt dà-cheann le iuchair Allen.
9

Sgrìobhainnean/Goireasan

Boost B2-SSCT Static Single Frame [pdfLeabhar-stiùiridh
B2-SSCT, B2-SSARM, B2-SBRAC, B2-SSCT Static Single Frame, B2-SSCT, Static Single Frame, Single Frame, Frame

Iomraidhean

Fàg beachd

Cha tèid do sheòladh puist-d fhoillseachadh. Tha raointean riatanach air an comharrachadh *