B2-SSCT Static Single Frame
“
Sònrachaidhean:
- Table feet: 2 pcs
- Centre bracket: 1 pc
- Column (right): 1 pc
- Center rails: 2 pcs
- Allen Wrench (4mm): 1 pc
- Allen Wrench (5mm): 1 pc
Stiùireadh airson cleachdadh bathar:
Stiùireadh co-chruinneachaidh:
- Ceum 1: Loosen the pre-installed bolts and
adjust the length of the top frame to match the size of the table
mhullaich. - Ceum 2: Insert the Column into the top frame,
fix the lifting column with 4pcs screws M6x12. - Ceum 3: Place the table feet on the Column,
rotate it to align, then tighten the pre-installed bolt. - Ceum 4: Place the side bracket on the top
frame and tighten the bolts. - Ceum 5: Mount the tabletop and fix it with 14
pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10.
Tighten the pre-installed bolts on the top frame.
Stàladh treidhe càbaill:
- Ceum 1: Fix the cable tray (B2-SSCT) to the
cable tray arms (B2-SSARM) with 8 pcs M6x10 screws. - Ceum 2: Install the U brackets to the desk
frame with 4 pcs M8x10 screws. Mount the cable tray to the desk
frame and fix it with 6 pcs M6x10 screws.
Stàladh Pannal Sgrion (Sgrion Prìobhaideachd Shush30):
- Ceum 1: Cuir na pleitean tapte a-steach don sgrion
panel (plates can be found in B2-SBRAC carton). - Ceum 2: Install the screen brackets (B2-SBRAC)
to the Shush30 Extrusion with 8 pcs M5x6 screws. - Ceum 3: Fix the screen brackets (B2-SBRAC) to
the desk frame with 10 pcs M6x10 screws.
Stàladh Pannal Sgrion Eco Panel:
- Ceum 1: Install the screen brackets (B2-SBRAC)
on the cable tray arm (B2-SSARM) with 10 PCS M6x10 Screws. The
brackets direction as photos display. - Ceum 2: Cuir am pannal EPS air an sgrion
brackets using a 6mm drill bit (not included), drill out holes in
Eco Panel Screen in line with back-to-back screen bracket holes.
Place 8 x Double Ended Bolts M5*32mm -6mm through The screen
bracket (B2-SBRAC) holes and the holes you have created in the Eco
Panel Screen. Tighten double-ended bolt with an Allen key.
Ceistean Cumanta (FAQ):
- Q: How many table feet are included in the package?
- A: There are two table feet included.
- Q: What size screws are used for fixing the lifting
column? - A: You need to use 4pcs screws M6x12 for fixing the lifting
colbh. - Q: How many pcs of Allen Wrench are provided?
- A: There is one Allen Wrench of 4mm and one Allen Wrench of 5mm
air a thoirt seachad sa phacaid.
“`
Boost Static Single Frame Instruction Manual
1
Pàirtean co-phàirteach
CHAN EIL. Ainm na Co-phàirt
PCS
CHAN EIL. Ainm na Co-phàirt
PCS
1
Cois bùird
2
9
Braca meadhan
1
2
Colbh (deas)
1
10 Rèilean meadhanach
2
3
Bolt: M6x12
5
11 Frèam àrd-2
1
4
Sgriubha: ST4x20
22
12 Column( left)
1
5
Brataichean taobh
2
13 Iuchair Allen (4mm)
1
6
Ceap rubair
14
14 Iuchair Allen (5mm)
1
7
Am frèam as àirde - 1
1
15 Ceangal Càball
5
8
Bolt: M6x10
3
2
Stiùireadh Co-chruinneachadh
Ceum 1 Fuasgail na boltaichean a chaidh a stàladh ro-làimh agus atharraich fad a’ fhrèam as àirde gus a bhith a rèir meud mullach a’ bhùird.
Step 2 Inset the Column to the top frame,fix lifting column with 4pcs screws M6x12 like.
3
Step 3 Place the table feet on the Column and rotate it and make it align, then tighten the pre-installed bolt.
Ceum 4 Cuir am bracaid taobh air a’ fhrèam as àirde agus teannaich na boltaichean.
4
Step 5 Mount the tabletop and fix it with 14 pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10 Tighten the pre-installed bolts on the top fame
5
Cable tray installation Step 1 – Fix the cable tray(B2-SSCT ) to the cable tray arms(B2-SSARM) with 8 pcs M6x10 screws.
Ceum 2 – Stàlaich na camagan U ri frèam an deasg le 4 sgriothan M8x10. – Cuir an treidhe càball ri frèam an deasg agus daingnich e le 6 sgriothan M6x10.
6
Screen panel installation ( Shush30 Privacy Screen ) Step 1 – Insert the tapped plates to the screen panel ( plates can be found in B2-SBRAC carton )
Step 2 – Install the screen brackets ( B2-SBRAC )to the Shush30 Extrusion with 8 pcs M5x6 screws.
7
Ceum 3 – Ceangail na camagan sgrion (B2-SBRAC) ri frèam an deasg le 10 pìosan sgriothan M6x10.
8
Stàladh pannal sgrion EPS (Pannal Eco 900mm À) Ceum 1 – Stàlaich na camagan sgrion (B2-SBRAC) air gàirdean an treidhe càball (B2-SSARM) le 10 sgriothan M6x10
Stiùireadh nam bragan mar a chithear sna dealbhan.
Ceum 2 – Cuir am pannal EPS air bracaid an sgrion. A’ cleachdadh drile 6mm (nach eil air a ghabhail a-steach), drile tuill ann an Sgrion a’ Phannail Eco a rèir tuill bracaid an sgrion cùil ri cùl (Nota: Is e drilean carbide as fheàrr airson pannal PET) – Cuir 8 x Boltaichean dà-cheann M5* 32mm – 6mm tro thuill a’ bhracaid sgrion (B2-SBRAC) agus na tuill a chruthaich thu ann an Sgrion a’ Phannail Eco. Teannaich am bolt dà-cheann le iuchair Allen.
9
Sgrìobhainnean/Goireasan
![]() |
Boost B2-SSCT Static Single Frame [pdfLeabhar-stiùiridh B2-SSCT, B2-SSARM, B2-SBRAC, B2-SSCT Static Single Frame, B2-SSCT, Static Single Frame, Single Frame, Frame |