Halo Static Single Sided Fixed
Dhuwur Workstation Frame
Instruksi Manual
Bagean komponen
NO. | Jeneng Komponen | PCS |
1 | Kaki meja | 2 |
2 | Kolom (kanan) | 1 |
3 | Baut: M6x12 | 5 |
4 | Sekrup: ST4x20 | 22 |
5 | Kurung sisih | 2 |
6 | Pad karet | 14 |
7 | Top pigura-1 | 1 |
8 | Baut: M6x10 | 3 |
9 | krenjang tengah | 1 |
10 | Rel tengah | 2 |
11 | Top pigura-2 | 1 |
12 | Column( left) | 1 |
13 | Allen Wrench (4mm) | 1 |
14 | Allen Wrench (5mm) | 1 |
15 | Pengikat Kabel | 5 |
Pandhuan Majelis
Langkah 1
Loosen bolts wis diinstal lan nyetel dawa pigura ndhuwur kanggo cocog ukuran ndhuwur meja.
Langkah 2
Insert the Column to the top frame, fix the lifting column with 4pcs of screws M6x12 like.
Langkah 3
Place the table feet on the Column and rotate it to align, then tighten the pre-installed bolt.
Langkah 4
Selehake krenjang sisih ing pigura ndhuwur lan ngencengi bolts.
Langkah 5
Gunung tabletop lan ndandani karo 14 pcs ngawut-awut ST4x20;
Fix the centre bracket with 2 pcs of screws M6x10
Tighten the pre-installed bolts on the top frame
Pemasangan kabel tray
Langkah 1
– Fix the cable tray (B2-SSCT ) to the cable tray arms (HP-SSARM) with 8 pcs M6x10 screws.
Langkah 2
– Pasang kurung U kanggo pigura mejo karo 4 pcs M8x10 ngawut-awut.
– Pasang tray kabel kanggo pigura mejo lan ndandani karo 6 pcs M6x10 ngawut-awut
Instalasi panel layar (Layar Privasi Shush30)
Langkah 1
– Insert the tapped plates to the screen panel ( plates can be found in the B2-SBRAC carton )
Langkah 2
– Install the screen brackets (B2-SBRAC) to the Shush30 Extrusion with 8 pcs M5x6 screws.
Langkah 3
– Fix the screen brackets (B2-SBRAC) to the desk frame with 10 pcs M6x10 screws.
EPS (900mm H Eco Panel) Screen panel installation
Langkah 1
– Install the screen brackets (B2-SBRAC) on the cable tray arm (HP-SSARM)with 10 PCS M6x10 Screws. The direction as the photos display.
Langkah 2
– Selehake panel EPS ing kurung layar
Using a 6mm drill bit ( not included ), drill out holes in the Eco Panel Screen in line with the back-to-back screen bracket holes ( Note: Carbide Drill Bits Work Best For PET panel )
– Place 8 x Double Ended Bolts M5* 32mm – 6mm through the screen bracket ( B2-SBRAC ) holes and the holes you have created in the Eco Panel Screen. Tighten the double-ended bolt with the Allen key.
Dokumen / Sumber Daya
![]() |
Rapidline Static Single Sided Fixed Height Workstation Frame [pdf] Instruksi Manual Static Single Sided Fixed Height Workstation Frame, Single Sided Fixed Height Workstation Frame, Sided Fixed Height Workstation Frame, Fixed Height Workstation Frame, Height Workstation Frame, Workstation Frame, Frame |