Halo Static Single Sided Fixed
اوچائي ڪم اسٽيشن فريم
ھدايت وارو دستور
اجزاء جا حصا
نه. | اجزاء جو نالو | پي سي ايس |
1 | ٽيبل پير | 2 |
2 | ڪالم (ساڄي) | 1 |
3 | بولٽ: M6x12 | 5 |
4 | اسڪرو: ST4x20 | 22 |
5 | پاسي واري بریکٹ | 2 |
6 | رٻڙ جو تپ | 14 |
7 | مٿين فريم-1 | 1 |
8 | بولٽ: M6x10 | 3 |
9 | مرڪزي بریکٹ | 1 |
10 | سينٽر ريل | 2 |
11 | مٿين فريم-2 | 1 |
12 | Column( left) | 1 |
13 | آلن رنچ (4 ايم ايم) | 1 |
14 | آلن رنچ (5 ايم ايم) | 1 |
15 | ڪيبل ٽائي | 5 |
اسيمبليءَ جون هدايتون
قدم 1
Loosen the pre-installed bolts and adjust the length of the top frame to match the size of the table top.
قدم 2
Insert the Column to the top frame, fix the lifting column with 4pcs of screws M6x12 like.
قدم 3
ٽيبل فوٽن کي ڪالمن تي رکو ۽ ان کي ترتيب ڏيڻ لاءِ گھمايو، پوءِ اڳ ۾ نصب ٿيل بولٽ کي سخت ڪريو.
قدم 4
پاسي واري بریکٹ کي مٿين فريم تي رکو ۽ بولٽن کي مضبوط ڪريو.
قدم 5
Mount the tabletop and fix it with 14 pcs screws ST4x20;
Fix the centre bracket with 2 pcs of screws M6x10
Tighten the pre-installed bolts on the top frame
ڪيبل ٽري جي انسٽاليشن
قدم 1
– Fix the cable tray (B2-SSCT ) to the cable tray arms (HP-SSARM) with 8 pcs M6x10 screws.
قدم 2
- 4 پي سي M8x10 اسڪرو سان ڊيسڪ فريم تي يو بريڪٽس انسٽال ڪريو.
- ڪيبل ٽري کي ڊيسڪ فريم تي لڳايو ۽ ان کي 6 pcs M6x10 اسڪرو سان درست ڪريو
اسڪرين پينل جي انسٽاليشن ( Shush30 پرائيويسي اسڪرين )
قدم 1
– Insert the tapped plates to the screen panel ( plates can be found in the B2-SBRAC carton )
قدم 2
– Install the screen brackets (B2-SBRAC) to the Shush30 Extrusion with 8 pcs M5x6 screws.
قدم 3
– Fix the screen brackets (B2-SBRAC) to the desk frame with 10 pcs M6x10 screws.
EPS (900mm H Eco Panel) Screen panel installation
قدم 1
– Install the screen brackets (B2-SBRAC) on the cable tray arm (HP-SSARM)with 10 PCS M6x10 Screws. The direction as the photos display.
قدم 2
- اي پي ايس پينل کي اسڪرين بريڪٽس تي رکو.
Using a 6mm drill bit ( not included ), drill out holes in the Eco Panel Screen in line with the back-to-back screen bracket holes ( Note: Carbide Drill Bits Work Best For PET panel )
– Place 8 x Double Ended Bolts M5* 32mm – 6mm through the screen bracket ( B2-SBRAC ) holes and the holes you have created in the Eco Panel Screen. Tighten the double-ended bolt with the Allen key.
دستاويز / وسيلا
![]() |
Rapidline Static Single Sided Fixed Height Workstation Frame [pdf] هدايت نامو Static Single Sided Fixed Height Workstation Frame, Single Sided Fixed Height Workstation Frame, Sided Fixed Height Workstation Frame, Fixed Height Workstation Frame, Height Workstation Frame, Workstation Frame, Frame |