Halo Static Single Sided Fixed
Auivi Mea faigaluega Maualuluga
Tusi Taiala
Vaega vaega
LEAI. | Igoa Vaega | PCS |
1 | vae laulau | 2 |
2 | Koluma(taumatau) | 1 |
3 | Fa'amau: M6x12 | 5 |
4 | Siu: ST4x20 | 22 |
5 | Fa'amau i autafa | 2 |
6 | Paʻu paʻu | 14 |
7 | Fa'avaa pito i luga-1 | 1 |
8 | Fa'amau: M6x10 | 3 |
9 | puipui ogatotonu | 1 |
10 | Alalaupapa tutotonu | 2 |
11 | Fa'avaa pito i luga-2 | 1 |
12 | Column( left) | 1 |
13 | Allen Wrench(4mm) | 1 |
14 | Allen Wrench(5mm) | 1 |
15 | Nonoa Uaea | 5 |
Faatonuga Fonotaga
Laasaga 1
Loosen the pre-installed bolts and adjust the length of the top frame to match the size of the table top.
Laasaga 2
Insert the Column to the top frame, fix the lifting column with 4pcs of screws M6x12 like.
Laasaga 3
Tuu vae laulau i luga o le Koluma ma feliuliua'i e fa'aoga, ona fa'amau lea o le fa'amau na fa'apipi'i muamua.
Laasaga 4
Tuu le puipui o le itu i luga o le faavaa pito i luga ma faʻamau faʻamau.
Laasaga 5
Fa'amau i luga ole laulau ma fa'apipi'i ile 14 pcs sikulima ST4x20;
Fix the centre bracket with 2 pcs of screws M6x10
Tighten the pre-installed bolts on the top frame
Fa'apipi'i fata uaea
Laasaga 1
– Fix the cable tray (B2-SSCT ) to the cable tray arms (HP-SSARM) with 8 pcs M6x10 screws.
Laasaga 2
– Fa'apipi'i fa'amau U i luga o le fa'avaa o le kesi fa'atasi ai ma fa'ailoga e 4 pcs M8x10.
– Fa'apipi'i le fata uaea i le fa'avaa o le kesi ma fa'apipi'i i fa'amau 6 pcs M6x10
Fa'apipi'iina o le laulau ( Shush30 Privacy Screen )
Laasaga 1
– Insert the tapped plates to the screen panel ( plates can be found in the B2-SBRAC carton )
Laasaga 2
– Install the screen brackets (B2-SBRAC) to the Shush30 Extrusion with 8 pcs M5x6 screws.
Laasaga 3
– Fix the screen brackets (B2-SBRAC) to the desk frame with 10 pcs M6x10 screws.
EPS (900mm H Eco Panel) Screen panel installation
Laasaga 1
– Install the screen brackets (B2-SBRAC) on the cable tray arm (HP-SSARM)with 10 PCS M6x10 Screws. The direction as the photos display.
Laasaga 2
– Tuu le laulau EPS i luga o puipui puipui
Using a 6mm drill bit ( not included ), drill out holes in the Eco Panel Screen in line with the back-to-back screen bracket holes ( Note: Carbide Drill Bits Work Best For PET panel )
– Place 8 x Double Ended Bolts M5* 32mm – 6mm through the screen bracket ( B2-SBRAC ) holes and the holes you have created in the Eco Panel Screen. Tighten the double-ended bolt with the Allen key.
Pepa / Punaoa
![]() |
Rapidline Static Single Sided Fixed Height Workstation Frame [pdf] Tusi Taiala Static Single Sided Fixed Height Workstation Frame, Single Sided Fixed Height Workstation Frame, Sided Fixed Height Workstation Frame, Fixed Height Workstation Frame, Height Workstation Frame, Workstation Frame, Frame |