د ریپډ لاین لوگوHalo Static Single Sided Fixed
د لوړ کاري سټیشن چوکاټ

د لارښوونې لارښودRapidline Static Single Sided Fixed Height Workstation Frame

د اجزاو برخې

Rapidline Static Single Sided Fixed Height Workstation Frame - Component parts

نه. د برخې نوم PCS
1 د میز پښو 2
2 کالم (ښي) 1
3 بولټ: M6x12 5
4 سکرو: ST4x20 22
5 د غاړې قوسونه 2
6 د ربړ پیډ 14
7 پورته چوکاټ-1 1
8 بولټ: M6x10 3
9 مرکز بریکٹ 1
10 د مرکز ریلونه 2
11 پورته چوکاټ-2 1
12 Column( left) 1
13 الن رنچ (4 ملي متر) 1
14 الن رنچ (5 ملي متر) 1
15 کیبل ټی 5

د مجلس لارښوونې

1 ګام
Loosen the pre-installed bolts and adjust the length of the top frame to match the size of the table top.

Rapidline Static Single Sided Fixed Height Workstation Frame - Assembly Instructions 1

2 ګام
Insert the Column to the top frame, fix the lifting column with 4pcs of screws M6x12 like.

Rapidline Static Single Sided Fixed Height Workstation Frame - Assembly Instructions 2

3 ګام
Place the table feet on the Column and rotate it to align, then tighten the pre-installed bolt.

Rapidline Static Single Sided Fixed Height Workstation Frame - Assembly Instructions 3

4 ګام
د غاړې بریکٹ په پورتنۍ چوکاټ کې ځای په ځای کړئ او بولټونه ټینګ کړئ.

Rapidline Static Single Sided Fixed Height Workstation Frame - Assembly Instructions 4

5 ګام
Mount the tabletop and fix it with 14 pcs screws ST4x20;
Fix the centre bracket with 2 pcs of screws M6x10
Tighten the pre-installed bolts on the top frame

Rapidline Static Single Sided Fixed Height Workstation Frame - Assembly Instructions 5

د کیبل ټری نصب

1 ګام
– Fix the cable tray (B2-SSCT ) to the cable tray arms (HP-SSARM) with 8 pcs M6x10 screws.

Rapidline Static Single Sided Fixed Height Workstation Frame - Cable tray installation 1

2 ګام
- د میز چوکاټ کې U بریکٹونه د 4 pcs M8x10 پیچونو سره نصب کړئ.
- د کیبل ټری د میز چوکاټ ته واچوئ او د 6 pcs M6x10 پیچونو سره یې تنظیم کړئ

Rapidline Static Single Sided Fixed Height Workstation Frame - Cable tray installation 2

د سکرین پینل نصب کول ( Shush30 د محرمیت سکرین )

1 ګام
– Insert the tapped plates to the screen panel ( plates can be found in the B2-SBRAC carton )

Rapidline Static Single Sided Fixed Height Workstation Frame - Screen panel installation 1

2 ګام
– Install the screen brackets (B2-SBRAC) to the Shush30 Extrusion with 8 pcs M5x6 screws.

Rapidline Static Single Sided Fixed Height Workstation Frame - Screen panel installation 2

3 ګام
– Fix the screen brackets (B2-SBRAC) to the desk frame with 10 pcs M6x10 screws.

Rapidline Static Single Sided Fixed Height Workstation Frame - Screen panel installation 3

EPS (900mm H Eco Panel) Screen panel installation

1 ګام
– Install the screen brackets (B2-SBRAC) on the cable tray arm (HP-SSARM)with 10 PCS M6x10 Screws. The direction as the photos display.

Rapidline Static Single Sided Fixed Height Workstation Frame - Screen panel installation 4

2 ګام
- د EPS پینل د سکرین په قوسونو کې ځای په ځای کړئ.
Using a 6mm drill bit ( not included ), drill out holes in the Eco Panel Screen in line with the back-to-back screen bracket holes ( Note: Carbide Drill Bits Work Best For PET panel )
– Place 8 x Double Ended Bolts M5* 32mm – 6mm through the screen bracket ( B2-SBRAC ) holes and the holes you have created in the Eco Panel Screen. Tighten the double-ended bolt with the Allen key.

Rapidline Static Single Sided Fixed Height Workstation Frame - Screen panel installation 5

د ریپډ لاین لوگو

اسناد / سرچینې

Rapidline Static Single Sided Fixed Height Workstation Frame [pdf] د لارښوونې لارښود
Static Single Sided Fixed Height Workstation Frame, Single Sided Fixed Height Workstation Frame, Sided Fixed Height Workstation Frame, Fixed Height Workstation Frame, Height Workstation Frame, Workstation Frame, Frame

حوالې

یو نظر پریږدئ

ستاسو بریښنالیک پته به خپره نشي. اړین ساحې په نښه شوي *