DIMLITE pro G2 TEC2 Mounting Instructions

Manufacturer: Zumtobel Lighting GmbH

Product: DIMLITE pro G2 TEC2 Luminaire

Reference: 00159920

General Information and Safety Notices

ℹ️ Important notices. Please, read first! Keep the instructions safe! Specifications are subject to change without notice! If you have questions, please contact the manufacturer.

The installation and commissioning of the luminaire, as well as any modification, may only be performed by authorized personnel (qualified electrician). National installation regulations must be observed. Before any work on the appliance is done, it must be disconnected from mains.

⚠️ Hot plug-in is not an option and may cause damage to the lamp or luminaire! The manufacturer is not liable for damages resulting from improper or faulty installation or operation or from unauthorized modifications.

⚠️ Caution, risk of electric shock!

Dimensions

The luminaire has the following approximate dimensions:

  • Length: 250 mm
  • Width: 60 mm
  • Height/Depth: 14 mm

Chemical Resistance: Use only cleaning agents suitable for plastics. Respect the chemical resistance of the material.

Mounting Instructions

Step 1: Prepare the Track and Connector

1a. Start Track Connection: Identify the start track. Insert the electrical connector into the designated slot on the track. The connector typically has terminals for L1, L2, L3, N, PE, EL1, EL2, EN1, EN2. Ensure correct wiring according to diagrams. A visual check confirms correct alignment.

1b. Mechanical Engagement: The connector module is designed for easy mechanical engagement. It can be inserted or removed by applying pressure or pulling, often with a click mechanism.

1c. CLIX Connection: The "CLIX" system facilitates secure electrical connection. Ensure the connector is properly seated and locked into place. A visual indicator or audible click may confirm engagement.

Step 2: Connect Luminaire to Track

2a. Track Connection: Similar to step 1, prepare the luminaire's connection point and the track. Ensure correct polarity and wiring are maintained. Diagrams show comparisons of correct and incorrect connection configurations.

2b. CLIX Mechanism: The luminaire features a "CLIX" connector. Push the luminaire towards the track connection point until it clicks into place, establishing the electrical and mechanical link.

2c. Secure Connection: Apply firm, even pressure to connect the luminaire. The mechanism is designed for a secure fit.

2d. Wiring Verification: Double-check all electrical connections (L1, L2, L3, N, PE, EN1, EN2, EL1, EL2) against the required configuration for the luminaire and the track system. Incorrect wiring can lead to damage or malfunction. The diagram shows correct wiring for AC 220-240 V.

Step 3: Install Luminaire onto Track System

3a. Mounting: Align the luminaire with the track system. Slide or attach the luminaire onto the track. Arrows indicate the direction of insertion.

3b & 3c. Securing: Ensure the luminaire is correctly seated and secured on the track. A locking mechanism may be present to prevent accidental detachment.

Dismounting

To remove the luminaire:

  1. Release the locking mechanism (indicated by a lock icon ? and number 1).
  2. Pull the luminaire away from the track (indicated by number 2).

Optional Features

DALI MSENS TEC2

This section describes the optional DALI MSENS TEC2 sensor system, which can be integrated with the luminaire. Diagrams illustrate sensor coverage within a room.

Maximum System Capacity:

LUMINAIRES 55 50 46 41 37 32 28
SENSORS 0 1 2 3 4 5 6

APP Integration

Commissioning and Remote Control

The DIMLITE pro G2 system can be commissioned and controlled using dedicated mobile applications for Android and iOS devices. These apps allow for setup and remote operation within a range of approximately 15 meters.

Diagrams show a room with a door and a smartphone indicating wireless control and signal range.

Technical Specifications and Operation

Electrical Connection: The luminaire operates on AC 220-240 V.

Operation: Follow all installation and operation instructions carefully. Ensure the luminaire is installed by qualified personnel.

Models: DIMLITE Pro G2 TEC2, DIMLITE Pro G2 TEC2 Luminaires, Luminaires

PDF preview unavailable. Download the PDF instead.

00160150 DIMLITE PRO G2 TEC2 GPL Ghostscript 9.52

Related Documents

Preview DALI MSENS HC TECTON II Mounting Instructions and Specifications
Official mounting instructions and technical specifications for the Zumtobel DALI MSENS HC TECTON II luminaire, including installation, operation, dimensions, and detection area adjustments.
Preview Zumtobel PST PIR CF TEC2 Mounting Instructions and Installation Guide
Official mounting and installation instructions for the Zumtobel PST PIR CF TEC2 luminaire, including technical specifications, wiring diagrams, dimensions, and operational guidance. This document is intended for qualified electricians.
Preview Resclite Pro Tecton II TEC2 Mounting Instructions
Comprehensive mounting, installation, and operation guide for the Zumtobel Resclite Pro Tecton II TEC2 emergency lighting luminaire. Includes details on lens options, switch modes, status indicators, battery replacement, and safety precautions.
Preview Zumtobel TEC2 Lighting Elements: Mounting Instructions and Specifications
Comprehensive mounting instructions, technical specifications, and product details for Zumtobel's TEC2 lighting elements, including AMPHIBIA, CRAFT II, ECOOS II, and CLARIS evolution series. Covers installation, options, and product variants.
Preview Resclite Pro Tecton II Battery Replacement Instructions
Detailed instructions for replacing the battery in the Zumtobel Resclite Pro Tecton II emergency lighting luminaire, including safety precautions, battery types, and status LED information.
Preview Zumtobel SCENO: Innovative Retail Lighting Solutions
Discover Zumtobel SCENO, a flexible and efficient lighting system designed to enhance retail environments. SCENO offers brilliant light, high color rendering, and adjustable optics to perfectly showcase merchandise and create engaging shopping experiences. Explore its various installation options, technical specifications, and suitability for both retail and office spaces.
Preview Zumtobel PANOS R R150/200 AE D1000/25 Mounting Instructions
Detailed mounting instructions for the Zumtobel PANOS R R150/200 AE D1000/25 luminaire, including safety information and step-by-step assembly guidance.
Preview Zumtobel CARDAN LED Luminaire Installation and Mounting Guide
Detailed instructions for installing and commissioning Zumtobel CARDAN LED luminaires, covering wiring, mounting, and safety precautions.