RESCLITE PRO TECTON II

Reference: 00159920

Document: Mounting Instructions TEC2

Emergency Options

Important Notices

? Important notices. Please read first! Keep the instructions safe! Specifications are subject to change without notice! If you have questions, please contact the manufacturer.

This message is also provided in German, French, Italian, Spanish, Dutch, Swedish, Finnish, Russian, Polish, Chinese, and Arabic.

Overview

General view of the Resclite Pro Tecton II luminaire, showing its mounting on a track system. The diagram indicates mounting points and reference numbers (1-6) for specific components, along with an IP20 and IK04 rating.

Dimensions

The luminaire has the following dimensions:

Care and Maintenance

⚠️ Chemical Resistance: Note: Due to problems with chemical resistance, choose cleaning materials which are suitable for plastic. Respectez la résistance chimique du matériel: n'utilisez que des détergents compatibles avec les matières synthétiques. Rispettare la resistenza chimica del materiale: utilizzare solo detersivi compatibili con materiali plastici. Rekening houden met chemische weerstand. Gelieve enkel reinigingsmiddelen te gebruiken die Kunststofvriendelijk zijn.

Lenses Options

The luminaire is available with various lens options for different light distribution patterns:

Visual representations of these lenses and their associated beam patterns are provided on subsequent pages.

Light Distribution Patterns

Escape and Antipanic Lenses

Diagrams show the light distribution for 'escape' and 'antipanic' lenses. The 'escape' lens typically provides a wide, even spread. The 'antipanic' lens is shown with a wider spread, suitable for escape routes. A checkmark ✔️ indicates correct placement/usage, while a cross indicates incorrect.

Spot Lenses

Diagrams show the light distribution for 'spot' lenses, providing a more focused beam. The 'spot HP' lens is also depicted.

Spot Version Specific Note

? Spot Version Note: The luminaire should be positioned so that prolonged staring into the luminaire at a distance closer than 1.18 m is not expected.

This note is also provided in German, French, Italian, and Dutch.

Light Distribution Patterns (Continued)

Escape 90° and Escape 90° HP Lenses

Diagrams illustrate the beam pattern for the 'escape 90°' lens, showing light directed at a corner or edge, and the 'escape 90° HP' variant.

Escape HC and Antipanic HC Lenses

Diagrams show the light distribution for 'escape HC' and 'antipanic HC' lenses. The 'escape HC' is depicted with a central beam and side illumination, with a checkmark ✔️ for correct placement and a cross for incorrect. The 'antipanic HC' shows a wider spread suitable for larger areas.

Installation Steps

Variant Identification

The luminaire is available in ExD (self-contained battery) and ECx / ELP (central battery) variants. Tools required include a screwdriver and pliers.

Step 1: Lens Adjustment

(1a) Use a screwdriver to adjust the lens. The adjustment range is approximately ±90°.

(1b) Use pliers to adjust the lens angle. The mechanism makes a "CLIX...CLIX..." sound when adjusted.

(1c) Visually confirm the lens position.

(1d) Tighten screws to a torque of 1.2 Nm.

Step 2: OPTION ExD ONLY (Self-contained Battery)

This section details the installation of the battery for the ExD variant.

E1D and E3D Variants: Two battery types are shown, E1D and E3D, both from Zumtobel.

(2a) Note the "Commissioned Date" field on the battery.

(2b), (2c), (2d) Steps for inserting the battery into the luminaire. The battery and its cover are secured with a "CLIX" mechanism.

⚠️ Caution: Do not tamper with the rechargeable batteries and/or battery packs in any way. The diagram shows a warning symbol indicating incorrect battery insertion or handling.

Step 3: Switch Mode Selection via Jumper

The luminaire's operating mode can be selected using a jumper:

Mode Specifics:

Luminaire Marking (acc. IEC/EN 60598-2-22)

The luminaire marking provides information on its specifications:

Category Details
Supply version X: self-contained version
Z: central battery version
Mode of operation 0: non-maintained mode
1: maintained mode
Autonomy time 60: 1 hour
120: 2 hours
180: 3 hours
480: 8 hours
Facilities A: including test device
B: including remote rest mode
C: including inhibiting mode
D: high risk task area luminaire
E: with non-replaceable lamp(s) and/or batteries
F: Control gear with automatic test facility according to IEC 61347-2-7, marked with EL-T
G: internally-lit safety sign

Step 3a: Mounting on Track

ON THE TOP Start Track: Instructions for mounting the luminaire onto a start track.

? Refer to TEC2 pages 10-13 for further details.

Wiring Diagrams:

Two main wiring configurations are shown, indicated by '=' and '≠' symbols, relating to terminal block connections.

Configuration '=': Shows terminal blocks L1, L2, L3, EL1, EL2 connected.

Configuration '≠': Shows terminal blocks L1, L2, L3, EN1, EN2, EL1, EL2 connected.

(3b) Diagram illustrating manipulation of terminal blocks or jumpers.

(3c) Detail showing the "CLIX" connection mechanism.

Step 4a: Mounting on Track

ON THE TOP Start Track: Further instructions for mounting on a start track.

? Refer to TEC2 pages 10-13 for further details.

Wiring Diagrams:

Similar to step 3, two configurations are shown ('=' and '≠') with different terminal block connections.

Configuration '=': Terminal blocks L1, L2, L3, EL1, EL2.

Configuration '≠': Terminal blocks L1, L2, L3, N, EN1, EN2, EL1, EL2.

(4b) to (4g) Detailed diagrams showing the connection of wires to terminal blocks and the use of the "CLIX" mechanism for various configurations, including EN1, EN2 connections.

Voltage Range: The luminaire operates on AC 220-240 V and DC 0-250 V.

Diagrams show incorrect wiring configurations marked with a cross .

Step 5: Mounting and Dismounting

Mounting: Diagrams illustrate the process of attaching the luminaire to the track, including locking mechanisms (5a, 5b, 5c) and visual confirmation.

DISMOUNTING: Steps 1 and 2 show how to release the luminaire from the track.

Step 6: TEC2 Lever Lock

Description of the TEC2 lever lock mechanism for securing the luminaire.

(6a) Shows the lever lock mechanism.

(6b) Detail of the "CLIX" lever lock.

DISMOUNTING: Steps 1 and 2 show how to release the lever lock to dismount the luminaire.

OPTION: Emergency Lighting Self-contained (Battery)

⚠️ CAUTION: Lithium batteries included! OBSERVE Manufacturer's Safety Instructions!

Do not tamper with the rechargeable batteries and/or battery packs in any way. In principle, it can be assumed that lithium batteries are comparatively safe when handled properly.

Possible Hazards:

? Safety Data Sheet and Technical Info links are provided via QR codes for TRIDONIC (EN) and ZUMTOBEL (DE).

ExD Status LED

The ExD variant features a status LED with different indications:

LED GREEN / GRÜN:

Timing diagrams show different pulse patterns for these states (e.g., 1s pulses, 0.1s pulses).

LED RED / ROT:

Timing diagrams show different pulse patterns for these states (e.g., 1s pulses).

A diagram shows the location of the status LED on the luminaire.

Battery Change Instructions

Reference: 00160167

For: RESCLITE PRO TEC2

If the backup does not extend to the declared duration, the battery has to be replaced.

⚠️ The electric source for safety service is not a user-serviceable item and shall only be replaced by the manufacturer service agent or a similar qualified person.

This information is provided in multiple languages, including English, German, French, Italian, Spanish, Dutch, Swedish, Finnish, Russian, Polish, and Arabic.

General Instructions for Assembly, Installation, and Operation

Caution, risk of electric shock!

The installation and commissioning of the Lighting System, as well as any modification, may only be performed by authorized personnel (qualified electrician).

The luminaire is used exclusively for lighting and must be installed in accordance with national installation regulations.

⚠️ Warning: Always ensure that luminaires and power supply units are disconnected from the mains supply during wiring and installation work. Otherwise, the LED modules may be destroyed. Hot plugging is not permitted and may result in damage to the luminaire and loss of warranty.

The manufacturer is not liable for damages resulting from improper or faulty installation, operation, or unauthorized modifications.

The light source of this luminaire is not replaceable; when the light source reaches its end of life, the entire luminaire shall be replaced.

These instructions are provided in multiple languages, including English, German, French, Italian, Spanish, Dutch, Swedish, Finnish, Russian, Polish, Chinese, and Arabic.

Models: 00160166 Resclite Pro Tecton Ii, 00160166, Resclite Pro Tecton Ii, Pro Tecton Ii, Tecton Ii

PDF preview unavailable. Download the PDF instead.

00160166 RESCLITE PRO TEC2 GPL Ghostscript 9.52

Related Documents

Preview DALI MSENS HC TECTON II Mounting Instructions and Specifications
Official mounting instructions and technical specifications for the Zumtobel DALI MSENS HC TECTON II luminaire, including installation, operation, dimensions, and detection area adjustments.
Preview Resclite Pro Tecton II Battery Replacement Instructions
Detailed instructions for replacing the battery in the Zumtobel Resclite Pro Tecton II emergency lighting luminaire, including safety precautions, battery types, and status LED information.
Preview DIMLITE pro G2 TEC2 Mounting Instructions
Detailed mounting, installation, and operation instructions for the Zumtobel DIMLITE pro G2 TEC2 luminaire, including electrical connections, dimensions, and optional features. This guide is intended for qualified electricians.
Preview Zumtobel PST PIR CF TEC2 Mounting Instructions and Installation Guide
Official mounting and installation instructions for the Zumtobel PST PIR CF TEC2 luminaire, including technical specifications, wiring diagrams, dimensions, and operational guidance. This document is intended for qualified electricians.
Preview Zumtobel TEC2 Lighting Elements: Mounting Instructions and Specifications
Comprehensive mounting instructions, technical specifications, and product details for Zumtobel's TEC2 lighting elements, including AMPHIBIA, CRAFT II, ECOOS II, and CLARIS evolution series. Covers installation, options, and product variants.
Preview Zumtobel SCENO: Innovative Retail Lighting Solutions
Discover Zumtobel SCENO, a flexible and efficient lighting system designed to enhance retail environments. SCENO offers brilliant light, high color rendering, and adjustable optics to perfectly showcase merchandise and create engaging shopping experiences. Explore its various installation options, technical specifications, and suitability for both retail and office spaces.
Preview Zumtobel PANOS R R150/200 AE D1000/25 Mounting Instructions
Detailed mounting instructions for the Zumtobel PANOS R R150/200 AE D1000/25 luminaire, including safety information and step-by-step assembly guidance.
Preview Zumtobel: 零售与展陈空间的照明解决方案
探索 Zumtobel 如何通过创新的照明技术和 Limbic® 研究,为零售和展陈空间打造引人入胜的客户体验,提升品牌形象和销售。