Installation Instruction
Brand: Latitude Run
Model: MBOK1458
Product Overview
This document provides detailed instructions for the assembly and installation of the Latitude Run MBOK1458 nightstand. Please follow each step carefully to ensure proper construction and safe use of the product.
Parts List
- Part 1 (x1): Side panel standing foot
- Part 2 (x1): Side panel standing foot
- Part 3 (x1): Side panel standing foot
- Part 4 (x1): Side panel standing foot
- Part 5 (x1): Left Board
- Part 6 (x1): Right Board
- Part 7 (x1): Back brace
- Part 8 (x1): Vertical brace at the bottom
- Part 9 (x1): front pull strip
- Part 10 (x1): Sticker strip below the top
- Part 11 (x1): Upper Back Board
- Part 12 (x1): Desktop Board
- Part 13 (x2): Drawer front panel
- Part 14 (x2): Left Drawer Side Board
- Part 15 (x2): Right Drawer Side Board
- Part 16 (x2): Drawer Bottom Board
- Part 17 (x2): Drawer Back Board
Hardware and Tools Required
Assembly Tools Required (Not Included):
- Screwdriver [⚙️]
- Hammer [?]
Hardware List:
- Hardware A (6*35 mm): x36+2
- Hardware B (15*10 mm): x36+2
- Hardware C (6*30 mm): x16+1
- Hardware D (4*18 mm): x1
- Hardware E (3*12 mm): x16+1
- Hardware F: x2
- Hardware G: x1
- Hardware H (4*18 mm): x4
- Hardware I (4*30 mm): x10+1
- Hardware J: x4
- Hardware CL: x2
- Hardware CR: x2
- Hardware DL: x2
- Hardware DR: x2
Assembly Instructions
Step 1: Prepare Side Panels
Take parts 1, 2, 3, and 4. Insert 12 'A' screws (6*35 mm) into the designated holes on each of these parts. The diagram illustrates the placement of screws on the ends of these long panels.
Diagram Description: Four long panels (1, 2, 3, 4) are shown with pre-drilled holes. Arrows indicate screws (A) being inserted into these holes.
Step 2: Attach Base Boards
Connect parts 1, 2, 3, and 4 to part 5 (Left Board) and part 6 (Right Board) using 8 'C' screws (6*30 mm) and 12 'B' screws (15*10 mm).
Diagram Description: Parts 1, 2, 3, 4 form a base structure. Parts 5 and 6 are attached to the sides of this base using screws (C and B).
Step 3: Install Drawer Slides
Attach drawer slide components 'CL' and 'CR' to the inside faces of parts 1, 2, 5, and 6. Use 2 'CL' components and 2 'CR' components. Secure them with 'A' screws (x12 total) and 'E' screws (x8 total). Ensure the 'FRONT/DEVANT' labels align correctly.
Diagram Description: Drawer slide rails (CL and CR) are attached to the inner surfaces of the side panels (1, 2, 5, 6) using screws (A and E). Close-ups show alignment and screw placement.
Step 4: Assemble Main Frame
Attach part 7 (Back brace) and part 8 (Vertical brace at the bottom) to the main structure. Use 12 'B' screws (15*10 mm) and 4 'C' screws (6*30 mm). Parts 3 and 4 also connect to part 8.
Diagram Description: Part 7 connects horizontally, and part 8 connects vertically at the bottom. Parts 3 and 4 connect to part 8. Screws (B and C) are used.
Step 5: Install Upper Back Board
Slide part 11 (Upper Back Board) into the grooves at the top rear of the assembled frame.
Diagram Description: Part 11 is shown being slid downwards into the back of the main cabinet structure.
Step 6: Attach Desktop Board
Place part 12 (Desktop Board) on top of the assembled frame. Secure it using 4 'A' screws (6*35 mm) and 1 'D' bracket.
Diagram Description: Part 12 is positioned on top of the main cabinet. Screws (A) and a bracket (D) secure it from the underside.
Step 7: Install Drawer Runners
Attach the remaining drawer runner components to the inside of the cabinet frame (parts 5 and 6). Use 4 'C' screws (6*30 mm) and 4 'B' screws (15*10 mm). Also, attach part 10 (Sticker strip) using 2 'I' screws (4*30 mm).
Diagram Description: Drawer runners are attached to the inner sides of the cabinet. Part 10 is attached to the front lower section. Screws (C, B, and I) are used.
Step 8: Attach Drawer Support
Secure the drawer support structure to the cabinet using 4 'J' screws. The diagram shows the screws being inserted into the back of the cabinet to reinforce the drawer area.
Diagram Description: The rear of the cabinet is shown. Screws (J) attach a support piece, reinforcing drawer slide mounting points.
Step 9: Attach Drawer Fronts
Attach the drawer front panels (Part 13) to the drawer assembly using 'D' brackets and screws.
Diagram Description: Attaching the drawer front panel (13) to the drawer box using brackets (D) and screws. Multiple views show alignment and fastening.
Step 10: Assemble Drawer Boxes (Part 1)
Assemble the drawer boxes. Take part 13 (Drawer front panel) and attach it to the drawer side panels. Use 8 'A' screws (6*35 mm) for each drawer box assembly (x2).
Diagram Description: Two drawer front panels (13) are shown being prepared for assembly. Arrows indicate screws (A) being inserted to connect them to other drawer components.
Step 11: Assemble Drawer Boxes (Part 2)
Continue assembling the drawer boxes. Attach parts 14 (Left Drawer Side Board) and 15 (Right Drawer Side Board) to the drawer front panels (13). This step is for two drawer assemblies (x2).
Diagram Description: Two drawer front panels (13) with side panels (14 and 15) being attached, forming the sides of the drawer boxes.
Step 12: Insert Drawer Bottoms
Slide part 16 (Drawer Bottom Board) into the grooves of the assembled drawer sides and front. This step is for two drawer assemblies (x2).
Diagram Description: The drawer bottom panel (16) is shown being slid into the grooves of the partially assembled drawer box.
Step 13: Attach Drawer Backs
Attach part 17 (Drawer Back Board) to the drawer assembly. Use 8 'B' screws (15*10 mm) for each drawer assembly (x2).
Diagram Description: The drawer back panel (17) is attached to the drawer box, securing the bottom panel (16) in place. Screws (B) are used.
Step 14: Secure Drawer Backs
Further secure the drawer back panels (Part 17) to the drawer sides (Part 15) using 8 'I' screws (4*30 mm) for each drawer assembly (x2).
Diagram Description: Screws (I) are driven through the side panels (15) into the back panel (17) of the drawer, reinforcing the structure. This is done for both drawer assemblies.
Step 15: Attach Drawer Slides to Drawers
Attach the remaining drawer slide components ('DL' and 'DR') to the sides of the assembled drawers (Part 15). Use 2 'DL' and 2 'DR' components per drawer (x2 total). Secure with 'E' screws (x8 total).
Diagram Description: Drawer slide components (DL and DR) are attached to the outer sides of the drawer boxes (15). Screws (E) are used for attachment. 'FRONT/DEVANT' labels indicate orientation.
Step 16: Attach Drawer Handles
Attach the drawer handles (represented by 'F' components) to the drawer front panels (Part 13). Use 4 'H' screws (4*18 mm) per drawer (x2 total).
Diagram Description: Drawer handles (F) are attached to the drawer fronts (13). Screws (H) are inserted from the inside of the drawer front into the handle. A close-up shows the screw and handle detail.
Step 17: Insert Drawers
Insert the assembled drawers into the main cabinet frame, aligning them with the drawer slides.
Diagram Description: The main cabinet with two assembled drawers is shown being slid into place on the installed drawer runners.
Step 18: Final Check and Safety Warning
Installation is complete. For safety and stability, it is strongly recommended to secure the anti-tip accessories to the wall to prevent tipping, injury, and property damage. This is crucial for safe use.
Installation Completed
Safety Information
⚠️ Attention: For safety and stability, we suggest you have to secure the anti-tip accessories to the wall to prevent tipping, injury, and property damage.
Installation Completed