Schneider Electric PrismaSeT LVS04223
Installation Guide
Product Overview
This document provides installation instructions for the Schneider Electric PrismaSeT LVS04223 system, a modular solution for electrical distribution. It details the assembly process, component integration, and essential safety precautions.
Important Safety Information
Qualified Personnel Required: Electrical equipment must be installed, operated, serviced, and maintained exclusively by qualified personnel. Schneider Electric disclaims responsibility for any consequences arising from the use of this material.
Assembly Steps
Step A: Mounting Vertical Rails and Components
Begin by mounting the vertical rail assemblies onto the main structure. The diagram shows two rail assemblies, identified by part numbers LVS03197 / LVS03198, being attached. Use M6 x 16 screws, tightening them to a torque of 4.4 N.m. Component LVS04202 is also shown being integrated into this assembly. A key dimension of 200 units (likely mm) is indicated for placement.
Visual representation: A frame with pre-drilled holes, two vertical green mounting rails, and screws being inserted.
Step B: Securing and Preparing for Module Installation
This step illustrates the process of securing the mounted rails and preparing the structure for electrical modules. Arrows indicate a sliding or locking motion to ensure the rails are firmly in place. A prominent warning symbol [warning] ⚠️ is displayed, emphasizing the need for careful execution. The diagram also includes icons representing cutting [cutting tool] ✂️ and screwing [screw] ?, suggesting that some components may require minor adjustments or preparation before final installation.
Visual representation: The rail assembly from Step A, with arrows showing movement, a warning symbol, and icons for tools.
Step C: Installing Electrical Modules
Diagrams C and C' depict the progressive installation of electrical modules onto the secured vertical rails. These modules, likely terminal blocks or similar distribution components, are shown being attached sequentially to the rails. The diagrams show multiple modules being fitted.
Visual representation: The structure from Step B with multiple green electrical modules being clipped or screwed onto the vertical rails.
Step C": Final Assembly and System Configuration
Diagram C" shows the completed assembly, confirming the system is configured as LVS04223 x2, meaning two main units are installed. A close-up view highlights a snap-fit or locking mechanism used to secure components to the rail system. A bag containing components labeled LVS04202 is shown, indicating these are part of the kit for this assembly.
Visual representation: The full assembly with modules installed, a close-up of a connection detail, and a package of components.
Product Details
Product Name: PrismaSeT
Model Number: LVS04223
Associated Components: LVS03197, LVS03198, LVS04202