PrismaSeT LVS08710

Installation and Mounting Guide

Safety Information

Please Note: Electrical equipment should be installed, operated, serviced, and maintained only by qualified personnel. Schneider Electric assumes no responsibility for any consequences arising out of the use of this material. This notice is also available in French, Spanish, German, Italian, Portuguese, Chinese, and Russian.

General Mounting Layout and Dimensions

The following diagrams illustrate potential mounting configurations and dimensions for PrismaSeT enclosures. Mounting points are indicated by green dots.

  • Grid Dimensions: Various configurations are shown with dimensions such as 650 mm, 600 mm, 150 mm, 300 mm, and 400 mm, indicating spacing for mounting hardware.

Installation Steps

Configuration A

Step 1: Attach mounting bracket (component '1') to the enclosure frame. Step 2: Secure the bracket using screws (component '2'). The diagram indicates x16 screws are used, requiring a torque of 13 N.m.

Configuration A'

Step 1: Attach mounting bracket (component '1') to the enclosure frame. Step 2: Secure the bracket using screws (component '2'). The diagram indicates x2 screws are used, requiring a torque of 13 N.m.

Enclosure Models and Seismic Reinforcement

Enclosure Dimensions

  • LVS03587: Height 850 mm, Depth 250 mm, Width 650 mm.
  • LVS08774: Width 400 mm.
  • LVS08773: Width 300 mm.

Component Installation

Step 1: Mount the LVS03587 component onto a mounting rail (component '2'). Step 2: Secure the component using x4 screws.

Seismic Reinforcement

The LVS03587 component is used for structural reinforcement, particularly for seismic applications. Diagrams show the component being used in pairs (x2 each) to enhance the stability of the enclosure structure, with dimensions like 650 mm and 650+150 mm indicated for placement.

Company Information

For further information or confirmation of specifications, please contact Schneider Electric.

  • Schneider Electric Industries SAS
    35, rue Joseph Monier
    92500 Rueil-Malmaison
    France
    www.se.com
  • Schneider Electric Limited
    Stafford Park 5
    Telford, TF3 3BL
    United Kingdom
    www.se.com/uk

This document was printed on ecological paper.

© 2022 Schneider Electric. All rights reserved.

Models: LVS08710 Seismic Reinforcement, LVS08710, Seismic Reinforcement, Reinforcement

PDF preview unavailable. Download the PDF instead.

QGH13690 ?ts=1698340667216 Adobe PDF library 16.07 Adobe Illustrator 26.5 (Windows)

Related Documents

Preview Schneider Electric PrismaSeT LVS08964 Installation Guide
Detailed installation guide for Schneider Electric's PrismaSeT LVS08964 mounting system, covering safety precautions and step-by-step assembly instructions for PrismaSeT P, G, and G IP55 variants.
Preview Schneider Electric PrismaSeT LVS04223 Installation Guide
Detailed installation instructions for the Schneider Electric PrismaSeT LVS04223 modular electrical enclosure system. Covers safety, assembly steps, component mounting, and final configuration for qualified personnel.
Preview Schneider Electric PrismaSeT LVS03142 Installation Guide
Comprehensive installation guide for the Schneider Electric PrismaSeT LVS03142, detailing assembly steps, compatible models, and essential safety information for electrical equipment installation.
Preview Schneider Electric PrismaSeT LVS03553 FuPact ISFT 100N 3P Installation Guide
Installation instructions for the Schneider Electric PrismaSeT LVS03553 FuPact ISFT 100N 3P electrical component, detailing mounting and assembly steps for electrical enclosures.
Preview Schneider Electric PrismaSeT LVS04854 Installation Guide
Detailed installation guide for the Schneider Electric PrismaSeT LVS04854 system, covering the assembly of ComPact NS and MasterPact NT electrical components. Includes safety precautions and step-by-step instructions for building the enclosure system.
Preview Schneider Electric PrismaSeT LVS03124 FuPact ISFT 250 Installation Guide
This document provides installation instructions for the Schneider Electric PrismaSeT LVS03124 with FuPact ISFT 250, detailing horizontal mounting and fixed configurations. It includes necessary hardware specifications and assembly steps.
Preview Schneider Electric PrismaSeT LVS03122 Installation Guide for FuPact ISFT Modules
Comprehensive installation guide for Schneider Electric PrismaSeT enclosures featuring FuPact ISFT 160 3P and FuPact ISFT 100N 3P modules. Includes assembly steps, dimensional data, safety precautions, and manufacturer information.
Preview PrismaSeT LVS03416 Installation Guide for ComPact NSXm TGL / DRH 3P/4P
This document provides installation instructions for the PrismaSeT LVS03416 system, specifically for ComPact NSXm TGL / DRH 3P/4P components. It details the assembly steps using diagrams and text, emphasizing safety and proper installation by qualified personnel.