Assembly Instructions

Model No. Shoe Cabinet HOGA-NY224/NY267/NY268/HL0182

Contact Information

Phone: 1-424-206-5666

Email: support@yuzhouint.com

Support Hours:

  • EN: 1:00 PM to 1:00 AM GMT, Monday to Friday.
  • DE: 14:00 - 02:00 Uhr (MEZ), von Montag bis Freitag.
  • IT: Dalle 14:00 alle 2:00 CET, dal lunedì al venerdì.
  • FR: De 14 h à 2 h (UTC+1), du lundi au vendredi.
  • ES: De 14:00 a 02:00 horas (CET+1.), de lunes a viernes.

Warm Tips

  • Carefully read and keep these instructions for later.
  • Before assembling, ensure all parts and accessories are present.
  • Assemble on a soft, smooth surface like a carpet to avoid scratches.
  • Do not fully tighten the screws until everything is correctly in place.

Assembly Recommendations

We recommend using hand tools for assembly. If an electric screwdriver is used, reduce its power to protect the product.

Tip-over Restraint: Use of tip-over restraints may only reduce but not eliminate, the risk of tip-over.

Parts List

1: 1 pc

2: 1 pc

3: 1 pc

4: 1 pc

5: 1 pc

6: 2 pcs

7: 5 pcs

8: 4 pcs

9: 2 pcs

10: 1 pc

11: 1 pc

Hardware List

A: 12PCS

B: 12PCS

C: 8PCS (Φ8*30m)

D: 4PCS (Φ1/4"*2")

E: 1PC

F: 16PCS (Φ1/4"*1/2")

G: 20PCS

H: 4PCS

I: 24PCS (Φ3.5*14mm)

J: 2PCS

K: 4PCS (Φ3*12mm)

L: 12PCS

M: 12PCS (Φ3*16mm)

N: 4PCS

O: 4PCS (Φ3*16mm)

P: 4PCS

Q: 4PCS (Φ3.5*35mm)

R: 2PCS

S: 1PC

Assembly Steps

Step 1

Attach part 9 to part 8 using screws D (x2) and tool E. Repeat for the second part 9. Attach part 8 to part 3 using screws D (x2) and tool E. Repeat for the second part 8. Ensure all screws are tightened.

Step 2

Insert screws F (x4) into the designated holes on part 2. Attach part 2 to the assembled frame using screws F (x16) and tool E. Ensure all screws are tightened.

Step 3

Attach part 3 to part 2 using screws C (x4). Attach part 4 to part 3 and 2 using screws A (x4) and B (x4). Ensure all screws are tightened.

Step 4

Attach part 5 to part 4 using screws A (x2) and B (x2). Ensure all screws are tightened.

Step 5

Insert parts 6 into the slots on parts 3 and 4.

Step 6

Attach part 1 to the top of the assembled unit using screws A (x6) and tool S.

Step 7

Attach part 4 to the side of the unit using screws A (x6) and B (x6). Ensure all screws are tightened.

Step 8

Attach hinges (part H) to the doors (part J) using screws K (x2) and tool S. Attach the doors to the cabinet using screws L (x12), M (x12), N (x4), and O (x4) with tool S. Adjust screws on hinges for uniform door clearance.

Step 9

Insert shelf supports G (x20) into the pre-drilled holes inside the cabinet. Place shelves 7 onto the supports.

Step 10

Attach hinges H (x2) to the doors J (x2) using screws K (x2) and tool S. Attach the doors to the cabinet using screws I (x4) and tool S.

Step 11

Attach hinges H (x2) to the doors J (x2) using screws K (x2) and tool S. Attach the doors to the cabinet using screws I (x8) and tool S. Adjust screws on hinges for uniform door clearance.

Step 12

Attach part 1 to the top of the cabinet using screws I (x8) and tool S. Attach part 3 to the side of the cabinet using screws H (x2) and tool S.

Step 13

Secure the cabinet to the wall using screws N (x2), P (x4), and Q (x4) with tool S. Ensure the wall anchors are properly installed.

Step 14

Attach anti-tip straps R (x2) to the furniture and the wall using hardware N and P. Ensure the straps are securely fastened.

Final Check

Do not press hard on the table edge.

Models: HOGA-NY224, NY267, NY268, HL0182, HOGA-NY224 6 Tier Shoe Cabinet, HOGA-NY224, 6 Tier Shoe Cabinet, Shoe Cabinet, Cabinet

PDF preview unavailable. Download the PDF instead.

B0FB3L8XMZ installationmanual Adobe PDF library 16.07

Related Documents

Preview Assembly Instructions for HOGA-HL060/HOGA-HL061/HOGA-HL062 Shoe Cabinet
Step-by-step assembly guide for the HOGA-HL060, HOGA-HL061, and HOGA-HL062 shoe cabinet, including parts list, hardware list, and assembly diagrams. Provides instructions in English, German, Italian, French, and Spanish.
Preview Assembly Instructions for Tribesigns Shoe Cabinet HOGA-F1880/F2132
Step-by-step assembly instructions for the Tribesigns Wooden Shoe Cabinet Organizer with Doors and Drawer, model HOGA-F1880/F2132. Includes parts list, hardware list, and detailed assembly steps with multilingual support.
Preview Assembly Instructions for Tribesigns HOGA-HL0229 Shoe Cabinet
Detailed step-by-step assembly guide for the Tribesigns HOGA-HL0229 Shoe Cabinet, including a comprehensive parts list, hardware list, and clear instructions for building and installing the doors.
Preview Tribesigns HOGA-F1333 Shoes Cabinet Assembly Instructions
Assembly instructions and parts list for the Tribesigns HOGA-F1333 Shoes Cabinet. Includes detailed steps for assembly and information on returns.
Preview Tribesigns HOGA-NY260, NY315 Shoe Cabinet Assembly Instructions
Detailed assembly instructions for the Tribesigns HOGA-NY260, NY315 Shoe Cabinet. Includes parts list, hardware list, and step-by-step guidance for safe and correct assembly.
Preview Tribesigns Dining Table Assembly Instructions - HOGA Series
Comprehensive assembly instructions for the Tribesigns Dining Table, model series HOGA-JW0669, HOGA-JW0752, HOGA-JW0879, and HOGA-JW1043. Includes detailed parts list, hardware list, step-by-step assembly guidance, and contact information for customer support.
Preview Tribesigns HOGA-J0306/J0382 Cabinet Assembly Instructions
Comprehensive assembly guide for the Tribesigns HOGA-J0306/J0382 cabinet, detailing parts, hardware, and step-by-step instructions for building your storage unit.
Preview Tribesigns Boss Table Assembly Instructions
Detailed assembly instructions for the Tribesigns Boss Table, including parts list, hardware list, and step-by-step guidance for assembly. This guide ensures proper construction to avoid damage and achieve optimal results.