SaunaLife Cube Luxury Series CL5G Outdoor Sauna

Model: CL5G

Dimensions: 63"D x 81"W x 83"H

Revision: 1.0_6/2024

Note: Please read this manual carefully before beginning construction.

Product Overview and Dimensions

The SaunaLife Cube Luxury Series CL5G is an outdoor sauna designed for relaxation and wellness. The unit measures 63 inches deep, 81 inches wide, and 83 inches high.

Key Dimensions:

Tools Needed for Assembly

The following tools are recommended for assembling the SaunaLife CL5G Outdoor Sauna:

Parts List

The following components are included in the kit. Please verify all parts against this list before assembly.

Detail ID Quantity Article Number Dimensions (L" x W" x H") Diagram
DET 1 x2 K-SM100/1400 55.12" x 4" x 2" [Wooden plank]
DET 2 x4 K-SM100/1300 51.18" x 4" x 2" [Wooden plank]
DET 3 x1 T-STL117/1600XLM01 63" x 4.33" x 1.65" [Wooden support]
DET W x2 kmpl MU-TRAPP N/A [Ventilation component with W1, W2, W3, W4 parts]
DET 3 x64 T-STL117/1600-01 63" x 4.6" x 1.65" [Wooden plank]
DET 3/H x2 T-STL117/1600-01X 63" x 4.6" x 1.65" [Wooden plank with slot]
DET Sb x1 IC-TE-20-PR-12/15V 76.2" x 27.36" x 1.07" [Curved wooden panel]
DET Sa x1 IC-TE-20-PR-12/15P 76.2" x 27.36" x 1.07" [Curved wooden panel]
DET Ta x1 T-SL117/610UK1 24" x 5.63" x 1.1" [Wooden component]
DET Tb x1 T-TL94/610J 24" x 3.7" x 1.1" [Wooden component]
DET V x4 KI-VIN-25/40/40-ZN 1.58" x 1.58" x 1" [Metal bracket]
DET U1 x1 K-TL94/1940 76.38" x 3.7" x 1.1" [Wooden plank]
DET Y1 x1 T-IC-PTS-20/28-V 76.62" x 41.54" x 1.1" [Slatted panel]
DET Y2 x1 T-IC-PTS-20/28-P 76.62" x 37.2" x 1.1" [Slatted panel]
DET U2 x1 K-TL94/1850 72.83" x 3.7" x 1.1" [Wooden plank]
DET 6 x2 T-STL117/1600XL-01 63" x 2.32" x 1.65" [Wooden component]
DET 6c/d/e/f x1 T-STL117/1600KO-01 63" x X" x 1.65" [Wooden component with various dimensions indicated by X, 3/8", 3/4", 1 3/16"]
DET A1 x2 MU-VIT1840-KLZN ~72.5" [Metal strap/bracket]
DET A2 x2 MU-VIT4860-KLZN ~191.5" [Metal strap/bracket]
DET G x1 MU-VENT-100-PU N/A [Ventilation component]
DET F x3 MU-VENT-100-ZN 20.08" x 1.73" x 1.73" [Ventilation component]
DET 10a x2 K-HP44/510XP 29.72" x 1.73" x 1.73" [Wooden plank]
DET 11a x2 K-HP44/755XP 6.7" x 1.73" x 1.73" [Wooden plank]
DET 10c x1 K-HP44/170 N/A [Wooden plank]
DET 10 x1 TL-LAMOD-1930-KA01 76" x 21.34" x 2.84" [Bench component]
DET 11 x1 TL-LAMOD-1860-01 73.23" x 31.14" x 2.84" [Bench component]
DET 12 x1 TL-LAMOD-600-01 23.62" x 17.32" x 2.84" [Bench component]
DET 10b x3 K-HP44/290 11.42" x 1.73" x 1.73" [Wooden plank]
DET 14 x1 TL-STMOD-1930-KA01 76" x 15" x 2.84" [Bench component]
DET 21 x1 U-KL-6/17-PR 66.54" x 23.23" [Door panel]
DET 21c x2 K-HP44/1690 66.54" x 1.73" x 1.73" [Door frame component]
DET 21d x2 K-HP44/680 26.77" x 1.73" x 1.73" [Door frame component]
DET 21a x2 K-HL44/1660 65.35" x 1.73" x 0.71" [Door frame component]
DET 21b x2 K-HL44/650 25.6" x 1.73" x 0.71" [Door frame component]
DET 16 x1 TL-PIMOD-632-01 24.88" x 24.72" x 1.1" [Heater guard component]
DET 15a x1 TL-LAV90/630X 24.8" x 3.55" x 1.1" [Heater guard component]
DET 15b x1 TL-LAV90/500XP-XL 19.68" x 2.76" x 1.1" [Heater guard component]
DET 15d x1 TL-LAV42/330XP-XP 13" x 1.65" x 1.1" [Heater guard component]
DET 15c x2 KI-LEK15 N/A [Heater guard component]
DET 22 x2 T-STL-1600-XX 63" x 2" x 2" [Wooden plank]
Underlay felt KAT-AL 26" (roll) [Roll of underlay felt]
DET N x7 KAT-HAR-MUST N/A [Shingle component]
DET O x52 KAT-SIN-MUST N/A [Shingle component]
DET 25a x8 MU-OL-IC-20-1 L=~56.7" [Curved wooden component]
DET 25b x8 MU-OL-IC-20-2 L=~15.36" [Curved wooden component]
Fasteners/Hardware KI-KERL-12-RV4 C (x4), D (x8), E (x8) [Various screws and nuts]
Fasteners/Hardware KI-USA-ICO-226 Bit PH2, Torx bits T10-T25 [Tool accessories]
Fasteners/Hardware Various screws (L, K, J, I, H, M) L (~320), K (x20), J (x45), I (x40), H (x240), M (x70) [Various screws]

Assembly Instructions

Follow these steps carefully to assemble your SaunaLife CL5G Outdoor Sauna. Ensure you have all parts and tools ready before starting.

Step 1: Exterior Base Assembly

Begin by assembling the base structure. This involves connecting base components using screws (M) and potentially other parts like DET 1 and DET 2. Ensure the structure is square by checking diagonal measurements.

Step 2: Attaching Support Structures

Attach support elements (DET W) to the base structure. Use a water level to ensure proper alignment. Secure with screws (M).

Step 3: Installing Floor Supports

Install the main floor support planks (DET 3/H and DET 3). Use a rubber mallet to gently tap components into place. Fix DET 3/H components with four screws each, ensuring they have slots at the end. The screw pattern should be applied diagonally across the boards.

Step 4: Front Glass-Wall Assembly

Assemble the front glass-wall components (Sa, Ta, Sb, Tb). Ensure the backside is placed upwards. The outside edge will have an extra notch. Attach these panels using screws (I) and DET V brackets, with 16x J screws for securing.

Attention: Be extra careful not to hit the glass during assembly.

Step 5: Wooden Back Wall Assembly

Assemble the wooden back wall. Pre-drill holes (5/32") before inserting screws (H). Use DET U2 and DET I components for attachment.

Step 6: Erecting the Sauna Structure

Position the erected back wall and front glass-wall assembly. Use a water level to ensure the structure is plumb. Ensure markings on the wall are centered in the notches. Secure with screws (H).

Step 7: Temporary Wall Support

Temporarily support the walls using DET 3 components. Use a water level for alignment. Secure with screws (H). Ensure markings on the wall are centered in the notches.

Step 8: Securing Wall Planks

Remove the temporary DET 3 supports. Gently tap wall planks into place with a rubber mallet. Tighten screws (H) while leaving approximately a 1/4" gap to allow for adjustment when outer bands (DET A2) are installed. This gap is important for fitting the outer bands.

Step 9: Joining Wall Boards

Join wall boards together (as shown in diagram III) to bridge the gap (A). It is recommended that the combined boards are approximately 1/4" wider than the gap. Raise slightly before installing. Use the appropriate length screws to fasten the halves together. Pre-drill holes (5/32"). Use a rubber mallet for gentle adjustments.

Step 10: Initial Outer Band Fitting

Begin fitting the outer bands (DET A1, DET A2). Do not fix nuts very tightly yet. Place ratchet straps near the ends of the boards to hold them in place while you work. Pay attention to measurements (min. 2.36"). Remove screws after straps are in place.

Step 11: Final Outer Band Tightening

Now, fix all nuts tightly and remove the ratchet straps. Ensure the outer bands are secured properly.

Step 12: Interior Components and Vents

Remove any remaining temporary braces. Install the interior components, including benches and shelving. Install the upper and lower vents (DET G, DET F) using screws (K).

Step 13: Wall Mounting Brackets

Install mounting brackets for the interior walls. Use a water level for precise installation. Pay attention to the specified gaps (min. 1.38") from the glass wall. Use screws (H) and components DET 10a, DET 11a, and DET 10c.

Step 14: Bench and Shelf Installation

Install the main benches and shelves. Use components DET 11, DET 12, DET 10, and DET 10b. Pre-drill holes (5/32") for all screw connections. Do not overtighten screws.

Step 15: Additional Bench/Shelf Support

Install any remaining bench or shelf supports using DET 10b and DET 14 components. Pre-drill holes (5/32") for secure fastening.

Step 16: Door Installation

Install the door (DET 21) and its frame components (DET 21c, 21d, 21a, 21b). The door must open outwards. If needed, rotate the door 180 degrees to change the handle side. Use a water level for accurate placement. Ensure the door frame is pressed tightly against the wall and fasten from the inside using screws (H and J).

Step 17: Heater Guard Installation

Install the heater guard components (DET 16, DET 15a, DET 15b, DET 15d, DET 15c). ATTENTION: The heater guard may not meet safety distances for all heaters and should not be used if the heater does not fit. Leave a small gap (~0.2") from the board end. Fasten screws at a slight angle. If your sauna heater is smaller, you can cut DET 15b to length.

Step 18: Final Wall Reinforcement

Secure the outer walls with additional components (DET 22) using screws (H). Check for squareness and stability.

Step 19: Underlay Felt Installation

Install the underlay felt. Refer to the separate underlay installation manual provided in the package. Remove the bottom film first. Cut and remove the top film. Turn the end to the edge and clamp it. Proceed similarly on all edges, ensuring approximately 2" overlap. Cut off excess parts.

Step 20: Shingle Roof Installation

Install the roof shingles (DET N, DET O). Refer to the shingle installation manual. Shingles should overlap on top. Ensure an end view angle of approximately 0.35". Refract DET N into 3 pieces as needed. Cut DET O components as indicated.

Step 21: Final Exterior Trim

Attach the final exterior trim components (DET 25a, DET 25b) using screws (H). Ensure they are aligned correctly with the sauna structure.

Models: CL5G Cube Luxury Outdoor Sauna, CL5G, Cube Luxury Outdoor Sauna, Luxury Outdoor Sauna, Outdoor Sauna

PDF preview unavailable. Download the PDF instead.

SaunaLife CL5G Cube Luxury Installation Manual V1.0 (1) Foxit PhantomPDF Printer Version 7.0.1.831

Related Documents

Preview Saunalife Cube Luxury Series CL4G Outdoor Sauna Installation Manual
This manual provides comprehensive instructions for the assembly and installation of the Saunalife Cube Luxury Series CL4G Outdoor Sauna. It includes a detailed list of required tools, all component parts with specifications, and step-by-step visual guides for construction.
Preview Saunalife Cube-Series CL7G Outdoor Sauna Installation Manual
Comprehensive installation manual for the Saunalife Cube-Series CL7G Outdoor Sauna (87D" x 91W" x 93H"). Includes parts list, tools required, and step-by-step assembly instructions.
Preview SaunaLife CL12GCP Cube Luxury Series Outdoor Sauna Installation Manual
Detailed installation manual for the SaunaLife CL12GCP Cube Luxury Series Outdoor Sauna, including dimensions, parts lists, and required tools.
Preview SaunaLife CL5G Cube Luxury Series Outdoor Sauna Installation Guide
Detailed installation guide for the SaunaLife CL5G Cube Luxury Series Outdoor Sauna. Includes a complete parts list, step-by-step assembly instructions with textual descriptions of diagrams, required tools, and essential maintenance and care information.
Preview SaunaLife CL5G Cube Luxury Series Outdoor Sauna Installation Manual
This document provides detailed installation instructions for the SaunaLife CL5G Cube Luxury Series Outdoor Sauna, including a comprehensive parts list and step-by-step assembly guide.
Preview SaunaLife Cube Luxury Series CL3G Outdoor Sauna Installation Guide
A comprehensive installation manual for the SaunaLife Cube Luxury Series CL3G Outdoor Sauna, detailing all necessary tools, parts, step-by-step assembly instructions, and essential maintenance guidelines for optimal use and longevity.
Preview Saunalife Ergo-Series E6 Barrel Sauna Installation Guide
Detailed installation instructions for the Saunalife Ergo-Series E6 Barrel Sauna (59" Diameter x 81" Height), covering parts, tools, and step-by-step assembly procedures.
Preview SaunaLife Garden Series Model G4 Outdoor Sauna Assembly Manual
Comprehensive assembly instructions and parts list for the SaunaLife Garden Series Model G4 Outdoor Sauna. Learn how to build your garden sauna step-by-step, from ground frame to roof cover, including bench assembly.