SaunaLife Garden Series Model G4 Outdoor Sauna

Assembly Manual - April 2023

Introduction

Read the entire manual before assembly. Get the tools you need.

Parts List

Pos / Part ID Description / Specification Quantity Profile (mm) Length (mm) Notes
001Wood Plank145x1301147
002Wood Plank145x130338
003Wood Plank1445x1301147
004Wood Plank1445x130338
005Wood Plank245x1302475
006Wood Plank245x1302475
007Wood Plank245x58459
008Wood Plank245x1301545
009Wood Plank245x1291011
010Wood Plank145x1302260
011Wood Plank3045x1302260
012Wood Plank245x65338
013Wood Plank2845x130338
014Wood Plank145x1302260
015Wood Plank245x1302490
016Wood Plank145x652260
017Wood Plank145x1302260
GR1Groundframe290x452380
FB1Floorbeams245x452070
FB2Floorbeams145x451890
FB3Floorbeams345x451990
FB4Floorbeams345x45345
PR1Purlins170x1702490
RB1Roof Boards7.3m²202913(1341mm + 1572 mm)
R1Frontboard220x1402530
R2Gableboard420x1401550
R3Frontboard Fixing245x452490
SKHammer Block245x65
DR1Door Frame Component1800x1900
WN1Window Frame Component1765x1900
WN2Window Frame Component1765x1900
P1Floor Strips9m20x40
P2Slats (Door/Window)6+620x901880INT, EXT SLATS DR1, WN1, WN2
P3Slats (Door/Window)1+120x901065INT, EXT SLATS WN2
F1Floor/Terrace Board4m²281995Lagerholz
F2Terrace Floor Board0.84m²282090

Wood Quantities Summary

Assembly Instructions

Step 1: Groundframe

Fasten the base frame with screws. If possible, fasten the base frame to the Foundation. Diagonals must be of the same lengths. Drill holes before screws.

Tools needed: Water level and measuring tape.

Diagram Description: A diagram showing the assembly of the ground frame. It depicts base beams (GR1, FB1, FB2, FB3, FB4) forming a rectangular base, with diagonal bracing. A spirit level and measuring tape are shown.

Step 2: First Wall Row

The wall plank must be 10 mm above the edge of the base frame. The first wall plank row must be fixed with screws to the base frame.

Diagram Description: A diagram showing the first row of wall planks being attached to the ground frame. A drill is shown fastening a plank.

Step 3: Installing Walls

Use hammer and hammer block.

Diagram Description: A diagram showing the initial wall construction with corner posts and wall planks. A hammer and hammer block are illustrated.

Step 4: Installing Walls (Continued)

Use hammer and hammer block. Install the positions below completely.

Diagram Description: Diagrams showing the progression of wall assembly, adding more rows of planks.

Step 5: Installing Walls / Purlins

Use hammer and hammer block.

Diagram Description: Diagrams showing the installation of wall planks and the first purlins.

Step 6: Purlins

Use hammer and hammer block.

Fasten the purlins with screws. Make sure the upper side of the purlins is oblate. If necessary, adjust the tapping of the purlins. Fasten the gable parts with screws.

Diagram Description: Diagrams illustrating the attachment of purlins to the top of the walls. A close-up shows screw fastening.

Step 7: Ventilation Grill / Roof Boards

Install the ventilation grill in the back wall.

Fasten the roof boards with screws. Start with the groove edge on the board.

Diagram Description: Diagrams showing the installation of a ventilation grill and the start of roof board installation. A close-up shows a drill fastening a roof board.

Step 8: Roof Boards

Complete the installation of parts RB1. Cut the last roof board to the correct width. The edge must be aligned with the wall plank and the purlins.

Diagram Description: Diagrams showing the completion of roof board installation, including cutting the final board. A close-up shows a circular saw.

Step 9: Roof Boards (Frontboards)

Cut correct lengths and fasten frontboards fixing with screws.

Diagram Description: Diagrams showing the attachment of frontboards using a saw and screws.

Step 10: Roof Cover / Covering Strips

Install roof shingles, use small nails. Fasten the frontboard with screws. Cut the correct angle and fasten gableboards with screws.

Diagram Description: Diagrams showing the installation of roof shingles and covering strips. Close-ups show screw fastening.

Step 11: Floor / Terrace Boards / Floor Stripes

Fasten the floor / terrace boards with screws. Cut the final floor/ terrace board to the correct width.

Cut the floor stripes on right angle and size, then install with screws.

Diagram Description: Diagrams showing the installation of floor/terrace boards and floor stripes. Close-ups show screw fastening and cutting floor stripes.

Step 12: Door / Window

Slats can only be screwed to the door and window frame and not to the wall.

Diagram Description: Diagrams illustrating the assembly of door and window frames with slats.

Step 13: Door / Window (Installation & Adjustment)

To fix the door and windows to the house use only slats. Slats can only be screwed to the door and window frame and not to the wall.

Adjust the door. (Indications for Left/Right, Up/Down, In/Out adjustments are shown).

Diagram Description: Diagrams showing the final placement of doors and windows, and an illustration for adjusting the door, indicating adjustment directions.

Bench Assembly (Optional/Accessory)

Bench Parts List

Part Quantity
Element 11
Element 21
Element 32
Det 13
Det 22
Det 32
Det 41
Det 52

Bench Assembly Instructions

Note: Drill the pilot holes for the screws.

Assemble the bench components using the specified screws:

  • Use 25mm screws for connecting Element 3 with Det 1.
  • Use 70mm screws for connecting other parts of the bench structure.
  • Use 40mm screws for specific connections (e.g., with Det 4).

Diagram Description: Diagrams show the assembly of bench components, indicating screw placement, dimensions, and the overall structure.

Models: G4, G4 Garden Series Outdoor Sauna, Garden Series, Outdoor Sauna, Garden Series Outdoor Sauna, Sauna

PDF preview unavailable. Download the PDF instead.

SaunaLife Model G4 IOM (1)

Related Documents

Preview SaunaLife Cube Luxury Series CL3G Outdoor Sauna Installation Guide
A comprehensive installation manual for the SaunaLife Cube Luxury Series CL3G Outdoor Sauna, detailing all necessary tools, parts, step-by-step assembly instructions, and essential maintenance guidelines for optimal use and longevity.
Preview Saunalife Ergo-Series E6 Barrel Sauna Installation Guide
Detailed installation instructions for the Saunalife Ergo-Series E6 Barrel Sauna (59" Diameter x 81" Height), covering parts, tools, and step-by-step assembly procedures.
Preview SaunaLife Garden-Series G7 & G7S Installation Guide
Comprehensive installation guide for the SaunaLife Garden-Series G7 and G7S outdoor saunas, covering installation requirements, transport, final assembly, maintenance, and safety precautions.
Preview SaunaLife Garden-Series Model G6 Installation Guide
Comprehensive installation guide for the SaunaLife Garden-Series Model G6 outdoor sauna, covering installation requirements, transport, final assembly, maintenance, and safety instructions.
Preview SaunaLife Ergo-Series E6 Barrel Sauna Installation Guide
Comprehensive installation guide for the SaunaLife Ergo-Series E6 Barrel Sauna, detailing parts, tools, and step-by-step assembly procedures for a successful build.
Preview Saunalife Sauna Care Guide: Essential Maintenance and Usage Instructions
A comprehensive guide from Saunalife detailing proper sauna care, including surface preparation, usage guidelines, post-use procedures, annual maintenance, and safety precautions to ensure longevity and optimal performance.
Preview SaunaLife E6W Barrel Sauna Installation Guide
Comprehensive installation guide for the SaunaLife Ergo-Series E6W Barrel Sauna (59" Deep x 81" High), covering parts, tools, and step-by-step assembly instructions.
Preview SaunaLife CL5G Cube Luxury Series Outdoor Sauna Installation Manual
This document provides detailed installation instructions for the SaunaLife CL5G Cube Luxury Series Outdoor Sauna, including a comprehensive parts list and step-by-step assembly guide.