USER MANUAL
PAVO SLIDING DOOR WITH EXTENDED HANDLE
Thank you for choosing Better Bathrooms.
Please read this manual before installing your product and keep for future reference.
Product Codes: PAVSLMB1000HD, PAVSLMB1200HD, PAVSLBB1000HD, PAVSLBB1200HD
Key Features: Multi-person assembly, Tools required, We always recommend using professional tradespeople to install your product.
Version: V1_22.04.2025
Congratulations on your purchase
Welcome to our growing gang of savvy shoppers. We're on a mission to bring you extraordinary bathroom products, for less. From modern to traditional style ceramics, plus the gorgeous fixtures, fittings and furniture to match. So, you can fall in love with your space every single day.
As one of the UK's largest independent bathroom stores, Better Bathrooms has received countless awards; including the National Business Awards UK, the Digital Entrepreneur Awards and being placed on The Sunday Times Fast Track 100.
We hope your new product goes above and beyond your expectations. However, should any problems occur, please:
- Log in to your account and contact our customer services team via your self-serve portal: betterbathrooms.com/CustomerAccount/Login
- Contact us via: betterbathrooms.com/content/contact-us
Important Information & Caution
- Please read these instructions thoroughly and retain for future reference.
- Always check for pipes and cables before drilling.
- No extra corner post is needed for installation with the side panel; the corner attachment is preassembled to the side panel glass.
CAUTION
- To prevent leaks, silicone must be applied on the outside of the shower and not on the inside.
- Read all instructions carefully before starting the installation.
- Save this manual for future reference.
Parts List
The following components are included with your shower enclosure. Please check all parts against the list before installation.
Diagram Description: The parts list diagrams visually display all components of the shower enclosure, including glass panels, metal profiles, rollers, handles, and fixings, illustrating their arrangement and connection points.
Main Components (Pages 4-5)
NO | Qty | Description | NO | Qty | Description |
---|---|---|---|---|---|
1 | 2 | Top roller | 12 | 1 | Allan key kit |
2 | 2 | Wall profile | 13 | 1 | Installation tool |
3 | 1 | Moving door | 14 | 8 | Screw cap |
4 | 10 | Wall anchor | 15 | 1 | Top rail |
5 | 10 | Screw ST4x40 | 16 | 2 | Squeeze gasket |
6 | 1 | Wall profile gasket | 17 | 2 | Profile cap |
7 | 10 | Screw base | 18 | 4 | Screw M4x10 |
8 | 1 | Handle | 19 | 1 | Wall profile gasket |
9 | 1 | Water-retaining gasket | 20 | 1 | Fixed glass |
10 | 2 | Bottom roller | 21 | 1 | Water-retaining gasket |
11 | 1 | Bottom rail |
Side Panel Components (Pages 5)
NO | Qty | Description | NO | Qty | Description |
---|---|---|---|---|---|
SP1 | 1 | Corner profile cap L | SP6 | 1 | Return panel assembling |
SP2 | 1 | Corner profile cap R | SP7 | 1 | Squeeze gasket |
SP3 | 5 | Screw ST4 x 10 | SP8 | 1 | Installation tool |
SP4 | 1 | Channel cap extrusion | SP9 | 2 | Glass Wedge spacer |
SP5 | 1 | Chrome Wall Channel |
Note: No extra corner post is needed for installation with the side panel, the corner attachment is preassembled to the side panel glass.
Preparation
Ensure the wall is smooth and ready for installation. Always check for hidden pipes and cables before drilling.
Diagram Description: A visual showing a corner of a bathroom wall, highlighting the need for a smooth surface. One side of the wall is depicted as smooth, while the other is rough, indicating preparation is needed.
Tools Required
The following tools are necessary for installation:
- Drill
- Measuring Tape ?
- Silicone Sealant Gun ?
- Precision Knife ?
- Spirit Level ?
- Screwdriver ?
- Mallet ?
- Set Square
- Pencil ✏️
- Drill Bits
- Screws
Installation
Follow these steps carefully for a successful installation. Refer to the parts list for component identification.
Step A01: Dimensions
Diagram Description: A diagram showing the top view of the shower enclosure space with dimensions labeled 'X'. A table provides the required 'X' dimension for different product sizes.
Size | X,mm |
---|---|
1000 | 950~980 |
1100 | 1050~1080 |
1200 | 1150~1180 |
1400 | 1350~1380 |
Step A02: Wall Profile Attachment
Diagram Description: Shows attaching the wall profile (2) to the wall. It involves using wall anchors (4) and screws (5) or screws (18) and caps (14). An inset shows an adjustment range of 0-15mm.
Attach the wall profiles (2) to the wall using wall anchors (4) and screws (5), or screws (18) and screw caps (14). Ensure a secure fit and allow for up to 15mm adjustment.
Step A03: Bottom Rail and Glass Installation
Diagram Description: Illustrates attaching the bottom rail (11) to the wall profile (2) using screws (14). Then, the fixed glass (20) is placed into the bottom rail, followed by the moving door (3) being fitted into the top and bottom rails.
Attach the bottom rail (11) to the wall profile (2) using screws (14). Position the fixed glass (20) into the bottom rail. Then, fit the moving door (3) into the top and bottom rails.
Step A04: Side and Top Profile Attachment
Diagram Description: Shows attaching the side profiles (2) and the top rail (15) to the glass panels and wall. Screws (18) and caps (14) are used. An inset shows attaching the top rail (15) to the side profile (2) with screws (18).
Attach the side profiles (2) and the top rail (15) to the enclosure. Use screws (18) and screw caps (14) for secure fastening.
Step A05: Gasket and Cap Installation
Diagram Description: Shows inserting squeeze gaskets (16) and (19) into the profiles. Profile caps (17) are then fitted onto the top of the profiles.
Insert the squeeze gaskets (16) and (19) into the appropriate profiles. Fit the profile caps (17) onto the top of the profiles.
Step A06: Roller Attachment
Diagram Description: Shows attaching the bottom rollers (10) to the moving door (3) using screws (6) and (7). The diagram also shows attaching the top rollers (1) to the moving door (3) using screws (6) and (7).
Attach the bottom rollers (10) and top rollers (1) to the moving door (3) using screws (6) and (7). Ensure the spring-loaded rollers are installed on the bottom of the door.
Step A07: Handle and Final Adjustments
Diagram Description: Shows attaching the handle (8) to the moving door (3) using screws (3) and (10). Insets show adjusting the rollers using a screwdriver and checking the door alignment.
Attach the handle (8) to the moving door (3) using screws (3) and (10). Make final adjustments to the rollers for smooth door operation.
Step A08: Final Checks
Diagram Description: Shows a final check of the enclosure, including ensuring the door slides smoothly and all seals are in place. An inset shows a water seal (21) being fitted.
Perform final checks to ensure the door operates smoothly and all seals are correctly fitted. Ensure the water-retaining gasket (21) is properly installed.
Step A09: Silicone Sealing
Diagram Description: Shows applying silicone sealant around the edges of the enclosure where it meets the wall and base. Icons indicate a 24-hour curing time for the silicone.
Apply silicone sealant ? around the edges of the enclosure where it meets the wall and base to prevent leaks. Allow the silicone to cure for 24 hours ⏰.
Step B01: Dimensions (Alternative Configuration)
Diagram Description: A diagram showing the top view of the shower enclosure space with dimensions labeled 'X' and 'Y'. A table provides the required 'X' and 'Y' dimensions for different product sizes.
Size | X,mm | Size | Y,mm |
---|---|---|---|
1000 | 964~994 | 700 | 678~690 |
1100 | 1064~1094 | 760 | 738~750 |
1200 | 1164~1194 | 800 | 778~790 |
1400 | 1364~1394 | 900 | 878~890 |
Step B02: Wall Profile and Channel Attachment
Diagram Description: Shows attaching the wall profile (2) and chrome wall channel (SP5) to the wall using screws (5) and caps (14). An inset shows attaching the side panel to the wall channel.
Attach the wall profile (2) and chrome wall channel (SP5) to the wall using screws (5) and screw caps (14). Secure the side panel to the wall channel.
Step B03: Side Panel and Glass Assembly
Diagram Description: Shows attaching the side panel (SP5) and then the fixed glass (20) into the bottom rail (11) and wall channel (SP5). Corner profile caps (SP1, SP2) are fitted.
Attach the side panel (SP5) and then the fixed glass (20) into the bottom rail (11) and wall channel (SP5). Fit the corner profile caps (SP1, SP2).
Step B04: Roller and Gasket Installation
Diagram Description: Shows attaching the bottom rollers (10) to the moving door (3) using screws (SP3). Squeeze gaskets (SP7) are inserted into the profiles. The moving door is then fitted into the top and bottom rails.
Attach the bottom rollers (10) to the moving door (3) using screws (SP3). Insert squeeze gaskets (SP7) into the profiles. Fit the moving door into the top and bottom rails.
Step B05: Profile Cap and Sealant Application
Diagram Description: Shows fitting channel cap extrusion (SP4) onto the top rail. It also shows applying silicone sealant to the edges.
Fit the channel cap extrusion (SP4) onto the top rail. Apply silicone sealant ? to the edges where the enclosure meets the wall and base.
Step B06: Final Sealing and Curing
Diagram Description: Shows applying silicone sealant around the enclosure edges and indicates a 24-hour curing time ⏰ for the sealant.
Apply silicone sealant ? to all necessary edges for a watertight seal. Allow the sealant to cure for 24 hours ⏰.
Maintenance & Cleaning
Use a PH-neutral cleaning agent to maintain and clean the surface of your product. Do not use alkaline, solvent, acid, or chloric cleaning agents or scrubbing agents.
To maintain the surface of your product, wipe with a clean damp cloth and wipe dry. Do not use any abrasive cleaning agents or materials. If any harsh chemicals come into contact with the surface of the product, rinse and wipe clean immediately.
For More Information
- Visit: betterbathrooms.com
- Email: customerservices@buyitdirect.co.uk
- Call: 03303903062
- Write to: Trident Business Park, Neptune Way, Huddersfield, HD2 1UA
better bathrooms
Part of the BuyltDirect Group