JURA X10c Technical Documentation
Model: X10c (EA/SA/INTA)
Installation Site Requirements
- Horizontal, water-resistant surface.
- Environmental conditions:
- Air humidity not exceeding 80%.
- Ambient temperature between 10-35 °C.
For the JURA service technician to commission the coffee machine on-site, the customer must arrange for the necessary connections to be prepared by an authorized, qualified specialist in advance.
Ensure that the prepared connections are as close as possible to the coffee machine's installation location (see connecting hose length).
Always observe the instructions provided in your automatic coffee machine's operating manual (chapter "Installing the Coffee Machine").
Dimensions
Diagram showing front and side views with dimensions:
- Width: 373 mm
- Height: 470 mm
- Depth: 464 mm
- Side view details: 201 mm width, 58.4 mm, 119.6 mm, 63-150 mm
Overview: Installation Site Requirements and Installation Instructions
X10c: Version with stationary water supply connection (DVGW W540)
- Network connection: [Electrical plug symbol]
- Water connection:
- Shut-off valve
- Fine filter
- Local connection point
- Water drain:
- Metal hose (1.5 m)
- Residual water drain hose: Open connection of the hose for residual water to the drain pipe without pressure.
- Drain with siphon.
- Local connection point
The installation manual with a stationary water supply connection can be found on the JURA website: jura.com/support-X10c
Rear Panel of the Coffee Machine
Diagram showing the rear panel with connection points:
- G3/8" (plastic) connection for water supply.
- Connection 1: Residual water drain hose connection.
- Connection 3: Connection for stationary water supply.
Location of the Opening in the Tabletop for Coffee Ground Disposal
Diagram showing the placement of the opening for coffee ground disposal:
- Opening 2: Location of the connection for coffee ground disposal.
- Opening diameter: Minimum 70 mm.