Yaheetech 411288 Multi-Tier Plant Stand
General Information & Safety
EN: Please read this instruction manual carefully before attempting to install.
DE: Bitte lesen Sie diese Bedienungsanleitung vor der Montage gründlich durch.
ES: Por favor lea con atención el manual de instrucciones antes de llevar a cabo el ensamble.
FR: Lisez attentivement cette notice avant de commencer le montage.
IT: Si prega di consultare il libretto delle istruzioni prima del montaggio.
[1 or more people recommended for assembly]
[Estimated assembly time: 1 hour]
[Not intended for use by children]
[Keep away from fire or heat sources]
[Wearing protective gloves is recommended]
Please follow the instruction manuals and use a pad to avoid damage during assembly. Ensure the product and floor are protected.
For assistance, please contact Yaheetech via email: help@yaheetech.shop.
Parts and Hardware List
Parts
- Part 1: Vertical Support (x8)
- Part 2: Long Horizontal Support (x1)
- Part 3: Lower Shelf (x1)
- Part 4: Middle/Upper Shelf (x4)
- Part 5: Top Shelf (x1)
Hardware
- Hardware A: Screw, 45mm (x22)
- Hardware B: Screw, 40mm (x2)
- Hardware C: Screw, 40mm (x8)
- Hardware D: Screw (x1)
- Hardware E: Nut (x32)
Assembly Steps
Step 1
Begin by attaching four vertical supports (Part 1) to the lower shelf (Part 3). Use three screws (A) and four nuts (E) for this connection on each side of the shelf. Then, attach the long horizontal support (Part 2) between two of the vertical supports using one screw (A) and one nut (E) at each end.
Step 2
Attach two middle shelves (Part 4) to the vertical supports. Each shelf is secured using four screws (A) and four nuts (E).
Step 3
Attach another middle shelf (Part 4) to the vertical supports using three screws (A) and four nuts (E). Additionally, install the diagonal brace by securing it to the vertical supports using one screw (B) and one screw (D).
Step 4
Attach the remaining two vertical supports (Part 1) to the structure. Then, attach two middle shelves (Part 4) to these new vertical supports. Use eight screws (C) and eight nuts (E) for these connections, with four screws and nuts per shelf.
Step 5
Attach one middle shelf (Part 4) to the vertical supports. Secure it using four screws (A) and four nuts (E).
Step 6
Attach the final middle shelf (Part 4) to the vertical supports. Secure it using four screws (A) and four nuts (E).
Step 7
Attach the top shelf (Part 5) to the uppermost vertical supports. Secure it using four screws (A) and four nuts (E).
Step 8
The assembly is now complete. The diagram shows the fully constructed multi-tier plant stand.