Naterial Orizaba Metal Shed Assembly Instructions
This document provides detailed instructions for the assembly of the Naterial Orizaba Metal Shed, a galvanized steel structure with a 0.3mm pent roof, covering an area of 1.9m².
Product Identification:
- EAN: 3276007881271
- MATRIX ID: 2025R09P11-0023
Safety and Preparation
Before starting assembly, ensure you have a clear, level workspace. The assembly requires two people and may take approximately 8 hours. Wear appropriate safety gear, including gloves (EN 388 2121X). The shed has a maximum load capacity of 38kg/m² on the roof and a maximum wind resistance of 90km/h. Avoid assembly in adverse weather conditions like snow or strong winds.
Required Tools and Materials:
- Screwdriver (Phillips head)
- Drill
- Hammer
- Measuring tape
- Spirit level
- Ladder
- Safety glasses
- Work gloves
Foundation:
The shed must be installed on a perfectly flat and level concrete slab (not included). The recommended base dimensions are 2040mm x 1400mm with a thickness of 150mm.
Parts List
The following parts are included in the kit:
NO. | PART | Qty. |
1 | [Part 1] | 2 |
2L | [Part 2L] | 1 |
2R | [Part 2R] | 1 |
3L | [Part 3L] | 1 |
3R | [Part 3R] | 1 |
4L | [Part 4L] | 1 |
4R | [Part 4R] | 1 |
5 | [Part 5] | 1 |
6 | [Part 6] | 1 |
6-1 | [Part 6-1] | 1 |
6-2 | [Part 6-2] | 1 |
7 | [Part 7] | 1 |
8 | [Part 8] | 1 |
10L | [Part 10L] | 1 |
10R | [Part 10R] | 1 |
11 | [Part 11] | 1 |
12L | [Part 12L] | 1 |
12R | [Part 12R] | 1 |
15L | [Part 15L] | 1 |
15R | [Part 15R] | 1 |
16L | [Part 16L] | 1 |
16R | [Part 16R] | 1 |
17 | [Part 17] | 2 |
18 | [Part 18] | 6 |
21L | [Part 21L] | 1 |
21R | [Part 21R] | 1 |
22 | [Part 22] | 2 |
23L | [Part 23L] | 1 |
23R | [Part 23R] | 1 |
B1 | [Part B1] | 4 |
D1 | [Part D1] | 1 |
D2 | [Part D2] | 1 |
F1 | [Screw F1] | 210 |
F2 | [Screw F2] | 40 |
F3 | [Screw F3] | 8 |
F7 | [Screw F7] | 16 |
F10 | [Screw F10] | 4 |
G2 | [Part G2] | 4 |
GD | [Part GD] | 4 |
GB | [Part GB] | 2 |
GC | [Part GC] | 4 |
GS | [Part GS] | 2 |
J1 | [Part J1] | 4 |
P2 | [Part P2] | 2 |
P3 | [Part P3] | 6 |
P4 | [Part P4] | 2 |
P5 | [Part P5] | 2 |
P6 | [Part P6] | 2 |
S2 | [Part S2] | 100 |
S3 | [Part S3] | 210 |
Assembly Steps
Follow these steps carefully to assemble your Naterial Orizaba Metal Shed:
- Step 1: Attach parts 2L and 2R to part 1 using screws F1 (x4).
- Step 2: Connect part 1 (x2) to parts 2L and 2R using screws F1 (x4).
- Step 3: Assemble the base frame using parts 3L, 3R, and screws F1 (x4).
- Step 4: Attach part 5 to the base frame using screws F1 (x4).
- Step 5: Assemble the main frame structure, ensuring it is at a 90° angle. Two people are recommended for this step.
- Step 6: Attach side panels (P3) and corner supports (P2) using screws F1 and S3.
- Step 7: Secure panel 22 to the structure using screws F1 and S3.
- Step 8: Attach panels P3 and P4 to the base and side panels using screws F1 and S3.
- Step 9: Install panel 23R using screws F1 and S3.
- Step 10: Continue attaching panels P3 and P4 using screws F1 and S3.
- Step 11: Install panels 23L and 22 using screws F1 and S3.
- Step 12: Attach panels P3 and P2 using screws F1 and S3.
- Step 13: Install roof support beams 10L and 10R using screws F1 and S3.
- Step 14: Attach roof panels P3 using screws F1 and S3.
- Step 15: Install roof beams 12L and 12R using screws F2 and S3.
- Step 16: Attach parts 7 and 8 to the roof structure using part G2.
- Step 17: Secure the roof assembly to the shed walls using screws F1 and S3.
- Step 18: Attach parts 6, 4L, and 4R to the shed structure using screws F1, F2, and S3.
- Step 19: Install roof purlins 6-1 and 6-2 using screws F1 and S3.
- Step 20: Attach roof panels 21L and 21R using screws F2, F1, and S3.
- Step 21: Secure roof panels P5 and P6 using screws F1 and S3.
- Step 22: Attach roof edge panels 16L and 16R using screws F1 and GS.
- Step 23: Install roof panels 15L, 15R, and 17 using screws GC, F1, and S3.
- Step 24: Assemble the doors using parts D1, D2, and GB with screws F2.
- Step 25: Attach door hinges (part 18) to the shed frame and doors using screws F1, F2, and S3.
- Step 26: Continue attaching door hinges (part 18) to the shed frame and doors using screws F1, F2, and S3.
- Step 27: Install door handles (part GD) using screws F2 and S3.
- Step 28: Attach parts 7&8 and G2 to the door frame using screws F3.
- Step 29: Secure the roof structure with J1 parts and screws F7.
- Step 30: Install the door lock mechanism using F10 screws.
Final Check: Ensure all screws are tightened and the shed is stable. The doors should open and close smoothly.
Maintenance and Warranty
The Naterial Orizaba Metal Shed comes with a 10-year warranty. Regular cleaning and maintenance will prolong the life of the shed. Refer to the manufacturer's website for detailed warranty information and care instructions.
Contact Information
For customer support or warranty claims, please contact ADEO Services:
- France: ADEO Services, 135, rue Sadi Carnot - CS 00001 59790-RONCHIN - France. Website: www.product-regulatory.adeoservices.com
- Ukraine: Importer: TOV "Leroy Merlin Ukraine", Polarna St, 17A, Kyiv, 04201, Ukraine.
- Brazil: Leroy Merlin Companhia Brasileira de Bricolagem. Contact: 4020-5376 (Capitals) or 0800-0205376 (Other Regions).
- South Africa: Imported by Adeo South Africa (PTY) LTD T/A Leroy Merlin. Contact: +27 10 493 8000 or contact@leroymerlin.co.za
Country of Origin: Made in China