Reznor Heat Exchanger Gasket Kit Installation for Unit Heaters
Model: LDAP
Revision: LDAP-HX (01-22) 209212-A
Supersedes: CP-LDAP-RHXG (06-16) PN209212R1
About the Gasket Kit
- Gasket kits for replacement heat exchangers are shipped in a parts bag to prevent damage during shipping or storage.
- Gasket kits should be attached to the replacement heat exchanger at the time of installation.
- All gaskets are self-adhesive and pre-cut to size.
- Refer to the main installation manual provided with the heater for important safety information.
- Ensure all components listed in Table 1 are available before beginning installation.
Heat Exchanger Gasket Kit Components
Component | Size | Kit PN* | Component PN (Quantity) |
---|---|---|---|
Top/bottom header panel gasket | 1 x 33-27/32 | 209211 | 207727 (2) |
Side heater panel gasket | 1 x 37-17/32 | 207728 (2) |
*Note: Unit size 400 has one (1) heat exchanger, unit size 800 has two (2), and unit size 1200 has three (3). A gasket kit is provided with each replacement heat exchanger.
Installation Instructions
⚠️ DANGER ⚠️
- Improper installation could result in death, serious injury, and/or property damage. The qualified agency performing this work assumes responsibility for this installation.
- Proper installation and sealing of the heat exchanger to the heater is necessary for reliable and safe operation. Failure to properly install could result in property damage, personal injury, and/or death.
- The replacement heat exchanger should be installed by a qualified service agency in compliance with all codes and requirements of authorities having jurisdiction.
Installation Procedure:
Install Header Panel Gaskets
NOTE: The header panel gaskets are sealing gaskets and must cover the full length of the surface.
- Position top/bottom (1) and front/rear (2) gaskets as shown in Figure 1. Align holes—ignore large holes in bottom gasket.
- To apply gasket(s), start at end and gradually peel backing from gasket as it is adhered. Repeat with each strip.
Complete Replacement Heat Exchanger Installation
(Refer to installation manual provided with heater):
- Inspect and clean cabinet, burner, and vent system.
- Replace any components that are not structurally sound.
Start Up Heater
(When installation of replacement heat exchanger is complete, refer to installation manual provided with heater):
- Follow instructions on lighting instruction plate to restart heater.
- CHECK ALL SAFETY FEATURES FOR PROPER OPERATION.
Diagram Description
Figure 1. Heat Exchanger Gasket Locations
This diagram illustrates the placement of gaskets on a replacement heat exchanger assembly. The assembly shows a rectangular heat exchanger unit with fins. The gaskets are labeled as follows:
- "Header Panel Top Gasket" is shown positioned along the top edge of the heat exchanger assembly.
- "Header Panel Side Gasket" is shown along one of the vertical side edges.
- "Header Panel Bottom Gasket" is shown along the bottom edge.
- Another "Header Panel Side Gasket" is indicated along the opposite vertical side edge.
File Info : application/pdf, 2 Pages, 257.76KB
DocumentDocumentReferences
Related Documents
![]() |
Reznor LDAP Model Downflow Unit Heater Replacement Parts Manual This manual provides detailed information on replacement parts for Reznor LDAP model downflow unit heaters. It covers electrical, venter, fan, heat exchanger, burner, and cabinet components, along with accessories and options. Includes serial number decoding, warranty details, and technical specifications for various unit sizes. |
![]() |
Reznor Relay Kit Installation Guide for Multiple Unit Control (CL31/CL32) Comprehensive installation guide for Reznor CL31 and CL32 relay kits, enabling multiple unit control for various Reznor electric and gas-fired heaters. Includes component lists, detailed installation steps, and wiring specifications. |
![]() |
Reznor Heat Exchanger Gasket Kit Installation Guide for Gas-Fired Unit Heaters Detailed installation instructions for Reznor heat exchanger gasket kits for UBX, UBXC, UBZ, UDX, UDXC, and UDZ gas-fired unit heaters. Includes kit components, sizes, and step-by-step installation procedures. |
![]() |
Reznor Protective Grille/Shield Kit Installation Guide for Radiant Tube Heaters Installation guide for Reznor protective grille and shield kits for VZ, VZH, VZT gas-fired radiant tube heaters (DN7 & DO3 options). Covers components, safety, and step-by-step procedures. |
![]() |
Reznor Unit Heater Replacement Parts Catalog Comprehensive catalog of replacement parts for Reznor APD, UDAP, UDBP, UDAS, and UDBS unit heaters, detailing electrical, blower, cabinet, venter, and burner assembly components, as well as various accessories and options. |
![]() |
Reznor Vertical Louver Kit Installation Guide for Gas-Fired Unit Heaters (OPT-CD1) Installation instructions for the Reznor OPT-CD1 Vertical Louver Kit, designed for gas-fired unit heaters (models UBX, UBXC, UBZ, UDX, UDXC, UDZ, UEZ). Includes component list and step-by-step assembly guide. |
![]() |
Reznor Suspension Kit Installation for Gas-Fired Low-Intensity Radiant Tube Heaters Installation guide for Reznor suspension kits (CK53, CK54, CK55, CK56) for VZ and VZH gas-fired low-intensity radiant tube heaters. Includes kit components, safety warnings, and installation steps. |
![]() |
Reznor Relay Replacement Kit (PN 259521) Installation Guide Installation instructions for the Reznor Relay Replacement Kit (PN 259521), designed to replace time delay relays (PN 46233, PN 259518) in Reznor power-vented HVAC units. Includes detailed wiring diagrams and safety warnings for models F and B. |