REZNOR

Revision: OPT-CD1 (01-24) 1036173-C

Supersedes: UBX-UBZ-UDX-UDZ-UEZ-CD1 (04-22) 1036173-B

VERTICAL LOUVER KIT INSTALLATION FOR GAS-FIRED UNIT HEATERS

OPTION CD1 FOR MODELS UBX, UBXC, UBZ, UDX, UDXC, UDZ, AND UEZ

Overview

Table 1. Kit Components

ComponentModel
Unit Size (MBTUh)30, 4560, 75100, 125150, 175, 200225, 250300, 350, 4005585110130, 180260, 310
Kit PN10362981036299103630010363011036302103630310412661041267104126810363041036303
Frame, louverComponent PN (Quantity)1028413 (1)1028433 (1)1028441 (1)1033695 (1)1033715 (1)1033728 (1)1036666 (1)1036668 (1)1036670 (1)1033902 (1)1033728 (1)
Louver1028418 (5)1028434 (5)1028441 (5)1033904 (8)1033961 (8)1033730 (8)1036667 (6)1036669 (6)1036671 (7)1033904 (8)1033730 (8)
Spring, compression195046 (5)195046 (5)195046 (5)195046 (8)195046 (6)195046 (6)195046 (6)195046 (7)195046 (8)195046 (8)195046 (8)

INSTALLATION

  1. If heater is installed, turn OFF gas and electric power. Allow time for louvers to cool before proceeding.
  2. Remove each horizontal louver by pushing louver toward spring to release louver.
  3. Remove door on right side of unit to access screws that secure face plate assembly (see Figure 1) to front of unit. Remove screws and remove face plate assembly.
  4. In face plate opening for louver frame, remove screws from face plate.

Figure 1. Typical Face Plate Assembly and Louver Frame

This figure shows the components for installing the louver frame. It depicts a "FACE PLATE ASSEMBLY" which includes a "FACE PLATE". Adjacent to this is the "LOUVER FRAME" which will house the vertical louvers. The diagram illustrates how the face plate attaches to the main unit and how the louver frame fits into the face plate opening.

  1. Position louver frame in face plate so that holes align and secure frame through face plate to face plate assembly using screws removed in step 4.
  2. Install face plate assembly and secure to front of unit using screws removed in step 3. Replace door on right side of unit.

NOTE: Before installing the louvers, note the louver curve and determine how the louvers should be positioned to provide the optimal throw pattern. Depending on where the heater is installed and on the desired airflow direction, the louvers may be installed with their curves all in the same direction (either way) or the right half one way and the left the other.

  1. Install vertical louvers in louver frame:
    1. On notched end of louver, slide compression spring over tab. NOTE: Depending on the desired throw pattern, the end of the louver with the spring can go either into the frame top or bottom.
    2. With wider louver blade facing in toward heat exchanger, push tab with compression spring into hole in top or bottom louver frame (see Figure 2) — spring compresses. Insert tab on other end of louver into opposite louver frame. For left airflow, compress spring into top louver frame. For right airflow, compress spring into bottom louver frame.

Figure 2. Louver Installation

This figure illustrates the installation of a single louver blade into the louver frame. It shows a "COMPRESSION SPRING" being attached to a tab on the louver blade. The diagram indicates that the spring is compressed as the tab is inserted into a hole in the louver frame (either top or bottom). The text also mentions inserting the other end of the louver into the opposite frame.

    1. Install all remaining louvers in accordance with steps 7a and 7b.
  1. Install horizontal louvers removed in step 2.

⚠ WARNING ⚠ To avoid burns, adjust louvers while heater is not in operation. If louvers must be adjusted while heater is operating, wear protective gloves.

  1. Adjust horizontal and vertical louvers to provide desired throw pattern.
  2. Turn ON gas and electric power.
  3. Light heater in accordance with lighting instructions and check for proper operation.
Models: UBX Gas Fired Unit Heaters, UBX, Gas Fired Unit Heaters, Fired Unit Heaters, Unit Heaters

File Info : application/pdf, 2 Pages, 166.56KB

PDF preview unavailable. Download the PDF instead.

OPT-CD1 (01-24) 1036173-C

References

Adobe InDesign 19.0 (Windows) Adobe PDF Library 17.0

Related Documents

Preview Reznor Vertical Louver Kit Installation Guide for Unit Heaters
Comprehensive installation guide for the Reznor Vertical Louver Kit (Option CD1) for gas-fired and hydronic unit heaters. Includes part lists, step-by-step instructions, and safety information.
Preview Reznor Vertical Louver Kit Installation Guide for Unit Heaters (Option CD1)
Installation instructions for the Reznor Option CD1 Vertical Louver Kit, designed for UBX, UBZ, UDX, UDZ, and UEZ model unit heaters. Includes component lists and step-by-step assembly guidance.
Preview Reznor Downturn Nozzle Kit Installation Guide for Unit Heaters
Installation instructions and component lists for Reznor downturn nozzle kits (OPT-CD2,3,4,5) for UBX, UBXC, UBZ, UDX, UDXC, UDZ, UEZ, and UWS unit heaters.
Preview Reznor Relay Kit Installation Guide for Multiple Unit Control (CL31/CL32)
Comprehensive installation guide for Reznor CL31 and CL32 relay kits, enabling multiple unit control for various Reznor electric and gas-fired heaters. Includes component lists, detailed installation steps, and wiring specifications.
Preview Reznor Downturn Nozzle Kit Installation Guide
This guide provides detailed instructions for installing Reznor downturn nozzle kits (CD2, CD3, CD4, CD5) on various Reznor unit heater models including UBX, UBXC, UBZ, UDX, UDXC, UDZ, UEZ, and UWS. It covers kit components and step-by-step installation procedures for both gas-fired and hydronic units.
Preview Reznor Gas Conversion Kit Installation for Gas-Fired Unit Heaters
This document provides installation instructions for Reznor gas conversion kits for various gas-fired unit heater models, including UBX, UBXC, UBZ, UDX, UDXC, UDZ, UDAP, UDAS, UDBP, and UDBS. It details component selection, safety precautions, and installation steps for converting between natural gas and propane, as well as for high-elevation installations.
Preview Reznor Heat Exchanger Gasket Kit Installation Guide for Gas-Fired Unit Heaters
Detailed installation instructions for Reznor heat exchanger gasket kits for UBX, UBXC, UBZ, UDX, UDXC, and UDZ gas-fired unit heaters. Includes kit components, sizes, and step-by-step installation procedures.
Preview Reznor Relay Kit Installation for Multiple Heater Control (CL31/CL32)
Installation guide for Reznor CL31/CL32 relay kits, enabling multi-heater control for UBX, UBZ, UDX, UDZ, and UEZ models. Covers safety, components, and wiring.