WORKPRO 5-Tier Metal Wire Shelving Unit
Operator's Manual
Dimensions: 43.9cm x 28.9cm x 130cm
Safety Information
⚠️ WARNING!
- DO NOT let children climb on or play with the unit.
- Ensure you do not drill into water or electricity lines when securing the shelving unit to the wall. Use a wire tracer and/or a water pipe finder (not included) if necessary.
- Handle with care.
- For ease and efficiency, the product should be assembled by two adults.
- Regularly check if all screw connections are tight and if all shelves are attached in a stable way.
- To avoid scratching the floor, assemble the shelving unit on a soft surface such as a carpet.
- Load the unit evenly and place the heaviest items on the lower shelves.
Specifications
Specification | Value |
---|---|
Maximum load of Shelving unit | 250 kgs |
Maximum load of One single shelf | 50 kgs |
Package Contents
Ensure all components are present. If any components are missing, do not proceed with assembly. Please send an email to service@greatstartools.com or call 877-876-7562.
The package includes the following components:
- A: Shelf x 5
- B: Top Post (with Post Cap Preassembled) x 4
- C: Middle Post x 4
- D: Bottom Post x 4
- E: Foot Leveler x 4
- F: Plastic Sleeve x 20 (1 Spare)
- G: S Hook x 4
- H: Plastic Mat x 5
Tools Required (Not Included): ? Protective Gloves
Diagram shows an exploded view of the shelving unit with components labeled A through H, and a separate box indicating required tools.
Assembly Instructions
Discard the black plastic spacers. These are used to separate the shelves for shipping purposes. Assemble on a flat surface. A piece of cardboard is recommended to keep the product from being scratched during assembly. Two people are recommended for assembly.
Step 1: Foot Leveler Assembly
Screw four foot levelers (E) clockwise into the bottom of four bottom posts (D).
Diagram shows four bottom posts (D) standing upright. A close-up view illustrates screwing a foot leveler (E) into the threaded base of a post.
Step 2: First and Second Shelf Assembly
Attach four plastic sleeves (F) to the appropriate bottom posts (D), one in each post. Ensure the arrows on the plastic sleeves point upwards. The plastic sleeves must be at the same height for each post to ensure the shelf sits levelly.
Slide the first shelf (A) down from the top of the posts and onto the plastic sleeves (F). Push down on each corner of the shelf, ensuring that the shelf is in the fully locked position.
Repeat for the second shelf (A).
Diagram Fig. 2 shows plastic sleeves (F) being attached to the top of bottom posts (D), with an inset showing a close-up of a sleeve being fitted onto a post, with an arrow indicating the correct upward orientation.
Diagram Fig. 3 shows the first shelf (A) being lowered onto the plastic sleeves (F) already attached to the bottom posts (D). A second shelf is then shown placed on top of the first.
Step 3: Middle and Top Post Assembly
Insert four middle posts (C) completely into four bottom posts (D).
Insert four top posts (B) completely into four middle posts (C).
Diagram Fig. 4 shows the process of connecting posts. A middle post (C) is shown being inserted into a bottom post (D). The assembled structure then shows middle posts (C) connected to bottom posts (D), and top posts (B) connected to middle posts (C).
Step 4: Third, Fourth, and Fifth Shelves Assembly
Repeat Step 2 to install the third, fourth, and fifth shelves.
Diagram Fig. 5 depicts the fully assembled shelving unit with all five shelves (A) in place, secured by plastic sleeves (F).
Step 5: S Hook Assembly
Place four S hooks (G) and plastic mats (H) on the shelves at your desired position as needed.
Diagram Fig. 6 shows the top of the shelving unit with S hooks (G) attached to the wire shelves. A plastic mat (H) is shown placed on a shelf.
Cleaning and Maintenance
- Wipe with a dry cloth as needed to remove dust and dirt.
- Avoid contact with corrosive substances like acids, alkaline, or similar substances.
Customer Service
If you are having difficulty using this product and require support, please send an email to service@greatstartools.com or call 877-876-7562.
Distributed by: Hangzhou GreatStar Industrial Co., Ltd. No.35 Jiuhuan Road, Jiubao Town, Hangzhou 310019, China. Visit www.greatstartools.com. Made in China.