Anolis ArcSource Outdoor 24MC Integral
Installation Instructions
Safety Warning
Fixture must be installed by a qualified electrician in accordance with all national and local electrical and construction codes and regulations. This device falls under class one and must be grounded!
Mounting Options
STEP 1A: MOUNTING - USING YOKE
Use an Allen key 6 to release M8 tilting lock on each side of luminaire and adjust tilt of LED module in range of +35°/-90°.
Mount the fixture via suitable mounting holes. Ensure that you are mounting the fixture to a secure and non-flammable surface.
Fasten the Yoke of the fixture to the surface by three [screw]s.
STEP 1B: MOUNTING - USING FLOOR STAND
Mount the floor stand to the surface via 4 mounting holes of ⌀9mm or ⌀7mm in diameter.
Mount the luminaire to the Floor stand as illustrated and fasten it by [nut] with [washer] to bolt on floor stand.
Description: ArcSource Outdoor 24MC Integral mounted on the Floor stand.
STEP 1C: MOUNTING - USING LAND SPIKE (100 MM / 130 MM)
Insert the Land Spike into ground. The underground part of Land Spike should be placed perpendicularly into the ground. If tools are needed to insert the spike, use of some protective layer and applying pressure in the middle is recommended to prevent damaging of the land spike.
Mount the luminaire to the Land spike as illustrated and fasten it by two M8x20 [screw]s with [washer]s and spring [washer]s.
Description: ArcSource Outdoor 24MC Integral mounted on the Land Spike.
STEP 1D: MOUNTING USING TENON ADAPTOR (DIAMETER 63 - 80 MM / 80 - 106 MM)
Slide the Tenon Adaptor (mortise) of suitable size on a tenon (e.g., top of a metal post) and fasten in with three [screw]s included in the adapter.
Mount the luminaire to the Tenon Adaptor as illustrated and fasten it by two M8x25 [screw]s with [washer]s and spring [washer]s.
Description: ArcSource Outdoor 24MC Integral mounted on the Tenon Adaptor.
STEP 1E: MOUNTING USING POLE CLAMP (DIAMETER 63 - 80 MM / 80 - 105 MM)
Disassemble the Pole Clamp by unscrewing both [nut]s from bolts.
Mount the Pole Clamp to a pole and fasten it by screwing both [nut]s with [washer]s back to its bolts. Adjust the Pole Clamp to ensure its correct position before tightening it completely.
When in correct position, tighten both [nut]s completely.
Place the luminaire to the Pole Clamp as illustrated and fasten it by two M8x25 [screw]s with [washer]s.
Description: ArcSource Outdoor 24MC Integral mounted on each side of Pole Clamp.
Connection
STEP 2: CONNECTION
Single Luminaire Connection
Connect [DMX] IN and [Power IN] cable to a [Junction Box] and [Power]/data [cable] from the [Junction Box] to the luminaire.
Multiple Luminaire Connection
Use [Power]/data [cable] for connection between [Junction Boxes] as illustrated. Notice the change of connection between the first two and all following junction boxes of the daisy chain line.
Junction Box Installation
Open the [Junction Box] by unscrewing 4 M4x20 [screw]s and lifting up the cover.
Mount the [Junction Box] to a surface via two mounting holes and suitable fasteners.
Wire Stripping and Colour Coding
Wire Stripping Lengths
Power Connection: 9 mm
Data Connection: 7 mm
Power Connection - Power IN Colour Coding
Core (EU) | Core (US) | L | N | GROUND | |
---|---|---|---|---|---|
Brown | Black | Blue | White | Green/Yellow | Green |
DMX CONNECTION
0 V | Data Ground | D- | D+ | |
---|---|---|---|---|
Data - | Data + |
Cable CE/US Leader - LED Output
WIRE | DATA AND POWER CONNECTION |
---|---|
Brown | Live |
Blue | Neutral |
Yellow/Green | Ground |
Red | + |
White | - |
Shielding | 0 |
Wiring Diagrams
5A: Connection scheme for the installations of single luminaire.
5B: Wiring connection - Daisy chain - First Junction Box. Connection scheme for the first Junction Box in daisy chain line.
5C: Wiring connection - Daisy chain - Following Junction Box. Connection scheme for each following Junction Box in daisy chain line. Only power/data cables are used.
Installation Accessories
STEP 3: INSTALLATION ACCESSORIES
Cable Gland Installation
Use wrench size 24 for cable gland M20x1.5. Install Cable glands individually!
Apply Loctite 5331 thread sealant on the plastic holder and Loctite 577 thread locking compound on the gland body in the indicated locations prior to assembly.
Failure to properly install cable glands will result in failure of the water tight seal!
Closing Junction Box
Install safety cover and top cover back. Before applying the torque, make sure the thread is clean and functional.
Torque: 4x 2 Nm
Top Hat and Half Top Hat
Description: Top Hat and Half Top Hat. (Identical installation instructions)
Installing Half Top Hat
Unscrew 4 M6x12 [screw]s from rear side of the luminaire as highlighted.
Slide the accessory on the luminaire from a side.
Fasten the accessory to the rear side of luminaire with four M6x12 [screw]s and spring [washer]s.
Description: ArcSource Outdoor 24MC Integral with Half Top Hat.
Installing Optical Demo Set
Unscrew two M6x12 [screw]s from the rear side of luminaire as highlighted.
Slide the Optical demo set on the luminaire.
Fasten the accessory to the rear side of luminaire with two original [screw]s and [washer]s.
Slide an optical foil into Optical demo set.
Description: ArcSource Outdoor 24MC Integral with Optical demo set.