Instruction Manual for Anolis models including: CALUMMA M LED Light, CALUMMA M, LED Light, Light

INSTALLATION INSTRUCTIONS CALUMMA M / L / XL SC AND MC

PDF preview unavailable. Download the PDF instead.

Installation Instructions Calumma M,L,XL v3 February 2023
INSTALLATION INSTRUCTIONS CALUMMA M / L / XL SC AND MC

QR code for Installations Instructions

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 3.0 / 2_2023

1

INSTALLATION INSTRUCTIONS CALUMMA M / L / XL SC AND MC
Fixture must be installed by a qualified electrican in accordance with all national and local electrical and construction codes and regulations. This device falls under class one and must be grounded!

CALUMMA M

CALUMMA L

STEP 1 CALUMMA INSTALLATION USING YOKE
1

Use fasteners that are appropriate for use with your mounting surface

CALUMMA XL

Drill two holes into the surface according the given dimensions(Calumma M/L/XL)

2

3 Adjustability

Fasten the Yoke of the fixture to the surface by two washers, spring washers and screws.

Use an Allen key to release M8 tilting lock on each side of luminaire and adjust tilt of LED module in range of +180°/-180°.

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 3.0 / 2_2023

2

INSTALLATION INSTRUCTIONS CALUMMA M / L / XL SC AND MC
STEP 2 CABLE GLAND INSTALLATION
Slip the cable through the gland according to the picture below and do not assemble the gland yet. Use wrench size 22 for cable gland M20x1.5

STEP 3 CONNECTION - CE (JUNCTION BOX IS NOT PART OF THE PACKAGE)

A DALI
WIRE Black White Green/Yellow

Connection ­ colour coding

POWER CONNECTION

WIRE

L

Red

N

Orange

/

DATA CONNECTION
Data + (+)
Data - (-)
Data 0V (0)

Strip these lengths for cable connections.

Power Connection Data Connection

A
9mm 9mm

Connection colour coding

Core (EU) Core (US)

Power Connection ­ colour coding

L

N

GROUND

Brown Black

Blue White

Green/Yellow Green

DALI

Calumma

Power

next Junction Box

B DMX
WIRE Black Blue Green/Yellow

Connection ­ colour coding

POWER CONNECTION

WIRE

L

Red

N

White

Shielding

DATA CONNECTION
Data + (+)
Data - (-)
Data 0V (0)

Junction Box

DMX

Calumma

Power

next Junction Box

Junction Box

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 3.0 / 2_2023

3

INSTALLATION INSTRUCTIONS CALUMMA M / L / XL SC AND MC

C WIRELESS DMX - each fixture

WIRE
Black Blue Green/Yellow

Connection ­ colour coding

POWER CONNECTION

WIRE

L

Red

N

White

Shielding

DATA CONNECTION
Data + (+)
Data - (-)
Data 0V (0)

Power

Calumma
next Junction Box

D WIRELESS DMX - first fixture

WIRE
Black Blue Green/Yellow

Connection ­ colour coding

POWER CONNECTION

WIRE

L

Red

N

White

Shielding

DATA CONNECTION
Data + (+)
Data - (-)
Data 0V (0)

Junction Box

Power

Calumma
next Junction Box

Junction Box

E DMX or ETHERNET via E-Box

WIRE
Black Blue Green/Yellow

Connection ­ colour coding

POWER CONNECTION

WIRE

L

Red

N

White

Shielding

DATA CONNECTION
Data + (+)
Data - (-)
Data 0V (0)

DALI

Calumma

Power

next Junction Box

Junction Box

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 3.0 / 2_2023

4

INSTALLATION INSTRUCTIONS CALUMMA M / L / XL SC AND MC

F DMX or ETHERNET via E-Box with Leader and Jumper Cable

FA

FB

LOCK

1

2

Please align the arrow symbol and mate the connector. Do NOT rotate the connector. Correct connection should be signalized by silent ,,click" sound.
UNLOCK
1

Mating complete. 2

Rotate NUT 30 degrees anti-clockwise, same as the arrow direciton. (Please do not rotate clockwise during unmating process)

CONNECTION - US (JUNCTION BOX IS NOT PART OF THE PACKAGE)

A DALI
WIRE Black White Green/Yellow

Connection ­ colour coding

POWER CONNECTION

WIRE

L

Red

N

Orange

/

DATA CONNECTION
Data + (+)
Data - (-)
Data 0V (0)

Drop out.

DALI

Calumma

Power

next Junction Box

Junction Box

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 3.0 / 2_2023

5

INSTALLATION INSTRUCTIONS CALUMMA M / L / XL SC AND MC

B WIRELESS DMX - each fixture Connection ­ colour coding

WIRE

POWER CONNECTION

WIRE

Black

L

Red

White

N

Orange

Green/Yellow

Blue

DATA CONNECTION
Data + (+)
Data - (-)
Data 0V (0)

Power

Calumma
next Junction Box

C WIRELESS DMX - first fixture

Connection ­ colour coding

WIRE

POWER CONNECTION

WIRE

Black

L

Red

White

N

Orange

Green/Yellow

Blue

DATA CONNECTION
Data + (+)
Data - (-)
Data 0V (0)

D DMX or ETHERNET via E-Box Connection ­ colour coding

WIRE

POWER CONNECTION

WIRE

Black

L

Red

White

N

Orange

Green/Yellow

Blue

DATA CONNECTION
Data + (+)
Data - (-)
Data 0V (0)

Power

Junction Box Calumma
next Junction Box

Power

Junction Box
Calumma
next Junction Box

STEP 4 CABLE GLAND INSTALLATION
Assemble the cable gland according to the picture.
Use wrench size 22 for cable gland M20x1.5
Install Cable glands individually!
We recommend to apply an adequate layer of the paste LOCTITE 5331 on the plastic holder of the cable gland before inserting in into the body of the gland and an adequate layer of the paste LOCTITE 577 on the thread of the gland body.
Failure to properly install cable glands will result in failure of the water tight seal!

Junction Box

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 3.0 / 2_2023

6

INSTALLATION INSTRUCTIONS CALUMMA M / L / XL SC AND MC

STEP 5 INSTALLATION OF ACCESORIES
HALF TOPHAT

TOPHAT

OPTICAL DEMO SET

1

2

Screw-out 4 screws from the cover plate. 3

Remove the cover plate. 4

Place the accessories (TOPHAT, HALF TOPHAT, OPTICAL DEMO SET) onto luminaire and centre it.

Fasten the accessories (TOPHAT, HALF TOPHAT, OPTICAL DEMO SET) to the luminaire by the 4 packed-in washers and screws.

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 3.0 / 2_2023

7

INSTALLATION INSTRUCTIONS CALUMMA M / L / XL SC AND MC
5 Only for Optical Demo Set

FLOOR STAND

Slide the Optical foil into the space of Optical Demo Set.

1

2

Place the luminaire on tenon on the Floor Stand. POLE ADAPTOR

The Luminaire fasten by one washer one flexible washer and one nut closed.
A

Installations on POLE(diameter 76-116mm) with two screws.

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 3.0 / 2_2023

8

INSTALLATION INSTRUCTIONS CALUMMA M / L / XL SC AND MC

B

C

Installation on FLAT POLE with two screws. A1

Installation on POLE (diameter 76-116mm) with zip ties. Maximum width zip ties is 20mm (not included packing).
A2

Drill three holes into the surface according the given dimensions.
A3 Pole Adaptor must be installed with two holes up

Insert the cable gland into the middle hole. A4

Fasten the Pole Adaptor on the surface by two screws, spring washers and washers.

Fasten the Luminaire on the Pole Adaptor by three screws, spring washers and washers.

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 3.0 / 2_2023

9

INSTALLATION INSTRUCTIONS CALUMMA M / L / XL SC AND MC

B1

B2

Drill three holes into the surface according the given dimensions.
B3 Pole Adaptor must be installed with two holes up

Insert the cable gland into the middle hole. B4

Fasten the Pole Adaptor on the surface by two screws, spring washers, washers and spacers.
C1

Fasten the Luminaire on the Pole Adaptor by three screws, spring washers and washers.
C2

Drill one hole into the surface according the given dimension.

Insert the cable gland into the hole.

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 3.0 / 2_2023

10

INSTALLATION INSTRUCTIONS CALUMMA M / L / XL SC AND MC

C3

C4

Pole Adaptor must be installed with

two holes up

Installations Pole Adaptor with two zip ties. FOR ALL INSTALLATION VERSIONS

Fasten the Luminaire on the Pole Adaptor by three screws, spring washers and washers.

Pull the cable through the inside of the Pole Adaptor and the cable gland and return to STEP 3.

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 3.0 / 2_2023

11


Adobe PDF Library 17.0 Adobe InDesign 18.1 (Windows)