Instruction Manual for Anlois models including: HP111 Ambiane Pendant Remote, HP111, Ambiane Pendant Remote, Pendant Remote

Resources | Anolis LED Lighting

PDF preview unavailable. Download the PDF instead.

Installation Instructions Ambiane HP111 Pendant remote v1 April 2022
INSTALLATION INSTRUCTIONS AMBIANE HP111 PENDANT REMOTE
The unit must be installed by a qualified electrician in accordance with all national and local electrical and construction codes and regulations.
STEP 1 MOUNTING TO LOWER CEILING
1

Fasten the Ceiling Plate M6i to the lower ceiling with suitable fastener.

2

3

Screw the Spherical Cap (with the Hanging Wire) to the Ceiling Plate. Use of thread glue LOXEAL 5503 is recommended.

Drill the hole Ø8mm in the lower ceiling for the LED unit supply cable. If you wish to have the LED unit supply cable parallel with the hanging wire, the distance between the hanging wire and the LED unit supply cable should be 60mm.

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 1.0 / 04_2022

1

INSTALLATION INSTRUCTIONS AMBIANE HP111 PENDANT REMOTE
STEP 2 CONTROL UNIT INSTALLATION

STEP 3 LED UNIT SUPPLY CABLE CONNECTION
1 Shorten power/data cable of LED unit to required length.
2

Fasten the control unit on the ceiling by means of two holes in the control units housing.
3

Strip these lengths of LED unit`s cable for wiring connection.

TERMINAL BLOCK
Colour of Wire

LED Unit Connection

+

A

B

Red

White

Blue

Black

Pull the LED unit`s cable through prepared hole in the ceiling and secure it above ceiling. Install a terminal block on the cable and connect it to the control unit.

STEP 4 PRIMARY POWER CONNECTION

1A

1B

Install terminal block to power cable (from Ambiane Power Rack or Ambiane Power HP) and connect it to Primary power socket of the control unit.

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 1.0 / 04_2022

2

INSTALLATION INSTRUCTIONS AMBIANE HP111 PENDANT REMOTE
STEP 5 SECONDARY POWER CONNECTION 48V (PSU SCOPE OF OTHERS)

STEP 6 DATA CABLES CONNECTION (DMX OR DALI)
1

Install terminal block on Secondary power cable and connect it to Secondary power socket of the control unit.
STEP 7 ADJUSTING THE HANGING WIRE LENGTH
1

Install terminal blocks on DMX or DALI cables and connect them to the control unit.

2

DMX CONNECTION

0V

D-

D-

Data Ground

Data -

Data +

Set the DIP switches to positions according to your operation mode. The fixture can be controlled by DMX or DALI (switch 11 in OFF position).

2

Press down the pin on the wires connector for length adjustment.

Press down pins on the hanging wires anchors for length and downward orientation adjustment.

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 1.0 / 04_2022

3


Adobe PDF Library 16.0.7 Adobe InDesign 17.3 (Windows)