HOMCOM 831-755V00 Fabric Drawer Storage Dresser
Model: 831-755V00 | IN240100176V01_GL
Important Information
Important: Retain for future reference. Read carefully.
Estimated Assembly Time: ⏱️ 60 minutes
Number of Steps: ? 10 steps
Assembly requires: ? 2+ persons
Please confirm all components are present before beginning assembly.
For the protection of your furniture, place all parts on a clean and smooth surface to prevent any damage.
Do not confuse similar screws.
Do not tighten bolts fully until all parts are connected.
Periodically check all fittings and re-tighten as necessary.
Parts List
- Part 1: Left side panel (x1)
- Part 2: Right side panel (x1)
- Part 3: Vertical support panels (x2)
- Part 4: Top panel (x1)
- Part 5: Middle shelf (x1)
- Part 6: Horizontal support bars (x2)
- Part 7: Long horizontal support bars (x2)
- Part 8: Drawer side panels (x3)
- Part 9: Drawer back panels (x3)
- Part 10: Drawer front panels (x2)
- Part 11: Drawer base panels (x2)
- Part 12: Bottom support panel (x1)
Hardware List
- A: Screws (M6x25mm) (x16)
- B: Screws (M7x50mm) (x8)
- C: Adjustable feet/levelers (x4)
- D: Small screws/bolts (M6x10mm) (x2)
- E: Drawer connectors/fasteners (x5)
- F: Allen key (x1)
- G: Screws (M4x30mm) (x2)
- H: Screws (M4x60mm) (x2)
Assembly Steps
Step 1
Connect the left side panel (1) and right side panel (2) to the two long horizontal support bars (7). Secure each connection using four screws (A) per side. Total 8 screws (A) used in this step.
Step 2
Attach the bottom support panel (12) to the lower part of the side panels (1 and 2). Secure using two screws (A).
Step 3
Attach the four adjustable feet (C) to the bottom of the vertical side panels (1 and 2). Screw them in securely.
Step 4
Attach the two horizontal support bars (6) to the inner sides of the vertical side panels (1 and 2). Secure each bar using three screws (A). Total 6 screws (A) used in this step.
Step 5
Attach the two vertical support panels (3) to the frame. Secure each panel using two screws (A). Total 4 screws (A) used in this step.
Step 6
Install the middle shelf (5) onto the frame. Secure it using four screws (B) and two small bolts (D).
Step 7
Attach the top panel (4) to the top of the frame. Secure it using four screws (B).
Step 8: Drawer Assembly
Assemble the drawers. For each drawer:
- Connect two drawer side panels (8) to a drawer back panel (9) using drawer connectors (E).
- Connect a drawer front panel (10) to a drawer base panel (11) using drawer connectors (E).
- (Implied) Complete the drawer box by joining these sub-assemblies.
Step 9
Insert the assembled drawers into the unit.
Step 10
Attach the feet/stabilizers to the bottom of the unit. Secure two feet using screws (G, M4x30mm). Additionally, secure the frame with two longer screws (H, M4x60mm) at the bottom for stability.
Contact Information
For questions or assistance, please contact the relevant regional customer care center:
US: 001-877-644-9366, customerservice@aosom.com. Imported by Aosom LLC, 27150 SW Kinsman Rd, Wilsonville, OR 97070 USA. Made in China.
CA: 416-792-6088, customerservice@aosom.ca. Imported by Aosom Canada Inc., 7270 Woodbine Avenue, Unit 307, Markham, Ontario Canada L3R 4B9. Made in China.
FR: 0033-1-84166106, aosom@mhfrance.fr. Imported by MH FRANCE, 2 Rue Maurice Hartmann, 92130 Issy Les Moulineaux, France. Made in China.
DE: +49 40 87408465, service@aosom.de. Manufacturer/REP: MH Handel GmbH, Wendenstraße 309, D-20537 Hamburg, Germany. Made in China.
ES: 0034-931294512, atencioncliente@aosom.es. Importer/Manufacturer/REP: SPANISH AOSOM, S.L., C/ROC GROS,N°15.08550, ELS HOSTALETS DE BALENYÀ, SPAIN. Made in China.
PT: 0034-931294512, info@aosom.pt. Importer/Manufacturer/REP: SPANISH AOSOM, S.L, C.ROC GROS N.15, 08550. ELS HOSTALETS DE BALENYÀ. Made in China.
IT: 0039-0249471447, clienti@aosom.it. Importer/Manufacturer/REP: AOSOM Italy srl, Centro Direzionale Milanofiori, Strada 1 Palazzo F1, 20057 Assago (MI). Made in China.
Recycling information: ♻️ DONNEZ OU RECYCLEZ (Association, Livraison, Déchéterie).