SAT Shower Enclosure Installation Guide
Multilingual Titles: Instalační návod, Inštalacný návod, Mounting Instruction, Montageanleitung, Инструкция по установке
Product Overview
This document provides installation instructions for SAT walk-in shower enclosures. It covers various models and includes a comprehensive parts list and step-by-step assembly guidance.
Supported Models: SIKOWI80, SIKOWI80KS, SIKOWI80MR, SIKOWI90, SIKOWI90KS, SIKOWI90MR, SIKOWI100, SIKOWI100KS, SIKOWI100MR, SIKOWI110, SIKOWI110KS, SIKOWI110MR, SIKOWI120, SIKOWI120KS, SIKOWI120MR, SIKOWI140, SIKOWI140KS, SIKOWIPROFIL, SIKOWIPROFILC, SIKOZAV2, SIKOZAV2C, SIKOWIROZKS, SIKOWIROZ, SIKOWIROZC, SIKOWIROZCKS.
Important Water Quality Note: Ensure water pH is between 6.8 and 7.2 [✔️ pH 6.8~7.2]. Avoid using if pH is less than 6.8 or greater than 7.2 [❌ pH < 6.8; pH > 7.2].
Parts List
The package includes the following components:
- 1x Shower Panel (Glass)
- Various profiles (e.g., wall profiles, bottom seals, top/side profiles)
- Mounting brackets and fixings
- Screws (e.g., ST4x40, 4mm)
- Wall plugs
- Bottom seal/guide
- Sealant
- Gloves
Refer to the diagrams for specific part numbers and quantities relevant to your model.
Step 1: Wall Preparation and Profile Mounting
1a. Wall Mounting: Mark the desired position for the wall profile. Drill holes using a Ø6 mm drill bit [?]. Insert wall plugs [?]. Secure the wall profile to the wall using screws.
Diagram shows drilling into a brick wall and fixing a profile.
1b. Profile Attachment: Attach the main wall profile to the prepared wall, ensuring it is level. The diagram shows a profile being attached to the wall with screws.
Diagram shows a profile being attached to the wall with screws.
1c. Bottom Seal Placement: Position the bottom seal or guide profile along the edge of the shower tray or floor. Ensure a gap of approximately 0-8mm between the seal and the tray/floor.
Diagram shows the bottom seal being placed with a 0-8mm gap.
1d. Bracket Installation: Install necessary brackets onto the wall profile and/or the bottom profile as indicated in the diagrams. These brackets will support the glass panel.
Diagram shows brackets being attached to profiles.
Step 2: Attaching the Glass Panel
Carefully lift and position the glass shower panel. Align the panel with the wall profile and the bottom seal/guide.
Diagram shows the glass panel being lifted and positioned.
2a. Securing the Panel: Attach the glass panel to the wall profile using the provided screws and brackets. Ensure the panel is vertical and securely fixed. Diagrams show various screw points and bracket attachments (e.g., using 4mm screws).
Diagrams show detailed views of attaching the panel to profiles using screws and brackets. Measurements like 4mm are indicated.
2b. Easy Clean Feature: Note the "easy clean" surface on the inner side of the enclosure, as indicated in the diagrams.
Diagram highlights the inner side of the enclosure labeled "easy clean".
Step 3: Profile and Seal Adjustments
Adjust the various profiles (e.g., top, side, bottom) to ensure a snug fit and proper sealing. Diagrams show specific profile attachments and adjustments, often involving screws and measurements like 'Lmm' or 'L-39mm'.
Diagrams illustrate detailed steps for attaching and adjusting profiles, including screw insertion and alignment. Measurements like 'Lmm', '150mm', '4mm', '1.5mm' are shown.
3a. Profile Attachment: Attach the remaining profiles, such as the top or side profiles, to the glass panel and wall. Ensure all connections are secure.
Diagram shows a profile being attached to the top edge of the glass panel.
3b. Sealing: Ensure all seals are correctly positioned to prevent water leakage.
Step 4: Final Sealing and Curing
Apply sealant along the edges where the enclosure meets the wall and the shower tray/floor. Ensure a continuous bead of sealant.
Diagram shows a sealant gun applying sealant to the base of the enclosure.
4a. Curing Time: Allow the sealant to cure for at least 24 hours [⏳ 24H] before using the shower. The diagram indicates a 100mm sealant application area.
Diagram shows a 24-hour curing period and a 100mm sealant application.
Important Notes
Water pH: As previously mentioned, maintain water pH between 6.8 and 7.2 for optimal performance and longevity of the enclosure materials.
Cleaning: Use mild cleaning agents suitable for glass and metal finishes. Avoid abrasive cleaners.
Model Specifics: Refer to the model-specific dimensions (e.g., 'A' dimension table for SIKOWI models) for correct installation sizing.
RH/LH Configurations: Some models are available in Right Hand (RH) and Left Hand (LH) configurations, as indicated in the diagrams.