SAT SIKOSTREAMS Shower Enclosures

Models: SIKOSTREAMS90CRT, SIKOSTREAMS100CRT

This document provides installation instructions for the SAT SIKOSTREAMS shower enclosures.

Important Note on Water Quality: Ensure water pH is between 6.8 and 7.2. Avoid water with pH below 6.8 or above 7.2.

Parts List

Part No.DescriptionQuantity
1Profilex2
2Profilex2
3Screw ST4x40x2
4Screw ST4x40x8
5Screw ST4x40x2
6Screw ST4x40x2
7Screw ST4x40x2
8Screw ST4x40x2
9Screw ST4x40x2
10Profilex2
11Sealx16
12Sealx2
13Sealx2
14Seal Set1set
15Sealx2
16Sealx1
17Bracketx2
18Bracketx1
19-RRoller Assembly (Right)x1
19-LRoller Assembly (Left)x1
20Handlex1
21Handle Fittingx1
22Handle Fittingx2
23Handle Fittingx1
24Handle Fittingx1

Note: Specific dimensions for model fit are indicated in Step 1.

Step 1: Prepare Glass Panels

This step involves attaching various fittings and brackets to the glass panels. The note "Poznámka: Vnitřní strana koutu - Easy Clean" indicates that these actions are performed on the inner side of the enclosure, which features an Easy Clean coating.

  • Attach brackets (17, 18) and other fittings to the side and curved glass panels as shown in the diagrams.
  • Ensure correct orientation of parts.
  • Dimensions for model fit are provided: SIKOSTREAMS90CRT requires an opening width of 864-884mm, and SIKOSTREAMS100CRT requires 964-984mm.

Step 2: Attach Base and Top Profiles

This step details the attachment of profiles to the glass panels and the base of the shower enclosure.

  • Diagram 2a shows attaching profiles to the glass panels using [movement-indicator] arrows.
  • Diagram 2b illustrates securing a profile to the glass, potentially a vertical seal or frame.
  • Diagram 2c shows attaching a handle fitting.
  • Diagram 2d shows attaching a roller assembly (part 5) to the top of a glass panel using [movement-indicator] arrows.
  • Diagram 2e shows attaching a bottom guide or bracket.

Step 3: Mount Side Panels

This step focuses on attaching the main side glass panels to the wall or base structure.

  • Diagrams a1 and a2 show the side panels being positioned and secured to wall profiles. Arrows indicate the direction of movement for installation. "Vnitřní strana koutu" (Inner side of the enclosure) is marked.
  • Ensure panels are plumb and securely fastened.

Step 4: Install Curved Panels and Roller Assemblies

This step involves fitting the curved glass panels and assembling the roller mechanisms for the doors.

  • Diagrams show the curved glass panels being placed into their respective tracks or positions.
  • Detailed sub-diagrams (a-h) illustrate the assembly of roller mechanisms (19-L, 19-R) and associated brackets and screws.
  • Specific measurements, such as 150mm, may indicate placement or clearance.

Step 5: Secure Curved Panels to Base

This step continues the assembly of the curved glass panels, securing them to the base of the enclosure.

  • Diagrams show the curved glass panels being inserted into the base profiles or tracks.

Step 6: Attach Top Profiles and Fittings

This step involves fitting the top profiles and securing the glass panels using brackets and rollers. The "Easy Clean" feature on the inner side is again noted.

  • Diagrams show attaching top brackets and roller assemblies.
  • A close-up view shows the use of plastic and metal washers when attaching a bracket.

Step 7: Hang Door Panels

This step details how to hang the shower door panels onto the installed tracks.

  • Diagrams show the door panels being lifted and guided onto the top roller tracks.
  • Instructions include "Peel off double-sided tape" and "Remove protective film" for certain components.

Step 8: Install Door Handles

This step covers the attachment of the door handles.

  • Diagrams show the process of screwing the handles (20) onto the door panels using the provided fittings (21, 22, 23, 24).

Step 9: Fit Bottom Seals

This step involves installing sealing strips at the bottom of the shower doors and enclosure.

  • Diagrams show the insertion of seals into channels on the glass panels and profiles.
  • Part 14 is identified as a seal set.

Step 10: Install Vertical Seals and Adjust Doors

This step focuses on fitting vertical seals, likely magnetic or brush seals, and making adjustments to the door alignment and gap.

  • Diagrams show the attachment of vertical seals, often along the edges where doors meet or meet the wall.
  • Roller adjustments are indicated to ensure proper door operation and alignment.
  • A diagram shows a gap measurement of 5-25mm, likely referring to the gap between the door and the wall or adjacent panel. "Vnitřní strana koutu" (Inner side of the enclosure) is marked.

Step 11: Final Adjustments

This step may involve final checks and minor adjustments to ensure the enclosure is correctly installed and functions smoothly.

  • Diagrams show final positioning and securing of components.

Step 12: Final Checks and Curing Time

This step indicates completing the installation and allowing time for any sealants or adhesives to cure.

  • A 24H indicator is shown, suggesting a waiting period before full use.
Models: SIKOSTREAMS90CRT SAT Stream, SIKOSTREAMS90CRT, SAT Stream, Stream

PDF preview unavailable. Download the PDF instead.

SIKOSTREAMS90CRT-montazni-navod Adobe PDF library 10.01

Related Documents

Preview SAT SIKO Shower Door Installation Guide - SIKOTEXP Series
Comprehensive mounting instructions for SAT SIKO shower doors, SIKOTEXP80CRT, SIKOTEXP90CRT, SIKOTEXP100CRT, SIKOTEXP80CT, SIKOTEXP90CT, and SIKOTEXP100CT. Includes parts list, assembly steps, and important notes for installation.
Preview SAT Shower Cabin Mounting Instructions - Installation Guide
Comprehensive mounting instructions for SAT shower cabins, including model compatibility, installation steps, and maintenance tips. Covers various models like SIKOSTENATEXD and SATSTENATEXD series.
Preview SAT Shower Enclosure Installation Guide
Detailed installation instructions for SAT walk-in shower enclosures, covering various models and assembly steps. Includes part lists and important notes for proper installation.
Preview SAT Shower Enclosure Installation Guide
Comprehensive mounting instructions for SAT shower enclosures, covering various SIKOWI and SIKOWIROZ series models. Provides step-by-step assembly guidance, parts identification, and care recommendations.
Preview SAT Shower Shelf Installation Guide - SATDPOL2MC & SATDPOL2CH
Step-by-step installation instructions for SAT shower shelves models SATDPOL2MC and SATDPOL2CH. Learn how to mount your new bathroom accessory securely and safely.
Preview SAT Shower Enclosure Mounting Instructions
Comprehensive guide for installing SAT walk-in shower enclosures, including model compatibility, safety precautions, and step-by-step assembly instructions.
Preview SAT Shower Enclosure Installation Guide - SIKOWI & SIKOWIROZ Series
Comprehensive installation instructions for SAT SIKOWI and SIKOWIROZ series walk-in shower enclosures. Includes parts list, tools required, and step-by-step assembly guidance.
Preview SAT Shower Enclosure Installation Guide: TEXD Series
Comprehensive mounting instructions for SAT TEXD series shower enclosures, covering installation steps, parts identification, and compatibility for various models and sizes. Includes guidance on water pH and assembly techniques.