Product Overview
This document provides detailed instructions for the installation and assembly of the Latitude Run Shoe Storage Cabinet, model aiiq2636. Please read all instructions carefully before beginning assembly.
Parts List
- Part 1: Top/Bottom Panel (1 PC)
- Part 2: Side Panel (1 PC)
- Part 3: Side Panel (1 PC)
- Part 4: Back Panel (1 PC)
- Part 5: Shelf (2 PCS)
- Part 6: Base Support (1 PC)
- Part 7: Drawer Front (3 PCS)
- Part 8: Drawer Side (6 PCS)
- Part 9: Drawer Base (3 PCS)
Fittings List
- A: Screw (M6 x 35 mm) - 18 + 2 PCS
- B: Cam Lock - 18 + 2 PCS
- C: Cam Dowel - 8 + 1 PCS
- D: Screw (φ4 x 40 mm) - 2 PCS
- E: Screw (φ6 x 30 mm) - 2 PCS
- F: Plastic Strip - 3 PCS
- G: Screw (φ4 x 16 mm) - 6 PCS
- H: Screw (φ6 x 30 mm) - 6 PCS
- I: Screw (φ10 x 15 mm) - 6 PCS
- J: Screw (φ20 x 10 mm) - 6 PCS
- K: Screw (M6 x 18 mm) - 24 + 2 PCS
- L: Hinge Part - 3 PCS
- M: Screw (φ3.5 x 14 mm) - 18 + 2 PCS
- R: Hinge Part - 3 PCS
Assembly Steps
Step 1
Attach side panels (2 and 3) to the base. The diagram shows screws (A, E, H, K) and cam locks (B) being used. Panel 2 and 3 are oriented vertically, and the base panel (implied) is horizontal.
Action: Connect side panels (2, 3) to the base. Use screws (A, E, H, K) and cam locks (B).
Step 2
Assemble the main cabinet frame. Connect side panels (2, 3) and back panel (4) to the base. Secure with cam locks (B) and cam dowels (C). The diagram shows panels 2, 3, and 4 being attached to a horizontal base panel (implied).
Action: Connect side panels (2, 3) and back panel (4) to the base. Secure with cam locks (B) and cam dowels (C).
Step 3
Insert shelves (5) and base support (6) into the cabinet frame. Secure with cam locks (B) and cam dowels (C). The diagram shows shelves (5) and a horizontal support (6) being placed between the vertical side panels (2, 3).
Action: Insert shelves (5) and base support (6) into the cabinet frame. Secure with cam locks (B) and cam dowels (C).
Step 4
Attach the top panel (1) to the assembled cabinet frame using screws (A). The diagram shows the top panel (1) being placed on top of the side panels (2, 3) and secured with screws (A).
Action: Attach the top panel (1) to the assembled cabinet frame using screws (A).
Step 5
Complete the main cabinet structure. The diagram shows the top panel (1), side panels (2, 3), and back panel (implied) forming the main box. Cam locks (B) and cam dowels (C) are used for assembly.
Action: Complete the main cabinet structure by connecting the top panel (1), side panels (2, 3), and back panel (implied). Use cam locks (B) and cam dowels (C).
Step 6
Secure the back panel. The diagram shows screws (D, E) being used to attach the back panel (implied) to the rear of the cabinet structure.
Action: Secure the back panel (implied) using screws (D, E).
Step 7
Assemble the drawer hinge mechanism. This step is repeated three times (x3). Attach hinge parts (L and R) to a base plate (7) using screws (K and E). The diagram shows two hinge-like components (L, R) being attached to a flat panel (7).
Action: Assemble the drawer hinge mechanism. Attach hinge parts (L and R) to the base plate (7) using screws (K and E). Repeat this process three times.
Step 8
Assemble the drawer boxes. This step is repeated three times (x3). Connect drawer sides (8) to the drawer bases (implied) using screws (M). The diagram shows two side panels (8) being attached to a base panel (implied).
Action: Assemble the drawer boxes. Connect drawer sides (8) to the drawer bases (implied) using screws (M). Repeat this process three times.
Step 9
Attach the drawer fronts (7) to the assembled drawer mechanisms. This step is repeated three times (x3). Use screws (F and G). The diagram shows the drawer front (7) being attached to the assembly from Step 7.
Action: Attach the drawer fronts (7) to the assembled drawer mechanisms using screws (F and G). Repeat this process three times.
Step 10
Insert the three assembled drawers into the cabinet. The diagram shows the completed cabinet with three drawers being slid into place. The drawer fronts are labeled 'I' and the drawer mechanisms are labeled 'J'.
Action: Insert the three assembled drawers into the cabinet.
Step 11
Secure the drawer fronts. The diagram shows screws (M) being used to fasten the drawer fronts to the cabinet structure, likely from the inside or through pre-drilled holes.
Action: Secure the drawer fronts using screws (M).
Step 12
Final product view. The diagram shows the fully assembled shoe storage cabinet with three flip drawers.
Action: The assembly is complete. You now have a fully assembled shoe storage cabinet.