Contact Us
For any questions regarding the installation of YITAHOME® products, please contact us:
Phone: +1(888)-717-8084 (Monday-Friday 8:00 AM - 4:30 PM PST / Saturday 8:00 AM - 12:00 PM PST)
Email: after-sale.cs@hotmail.com
Alternative Contact Method (for amazon.com orders only):
- Log into your Amazon account.
- Navigate to "Your Orders" and locate the purchase.
- Click on "Contact Seller".
Notice
- Follow the installation instructions carefully. Please confirm all accessories are present before beginning assembly.
- Do not fully tighten screws during the initial assembly stages. Fully tighten all screws only once all pieces are correctly assembled.
- If you encounter any problems during installation, please refer to the installation video tutorial available on the Amazon product page or contact our customer service.
Parts List
Item No. | Reference Image Description | Quantity |
---|---|---|
1 | Base Panel | 1 pc |
2 | Top Panel | 1 pc |
3 | Side Panel | 2 pcs |
4 | Back Panel | 1 pc |
5 | Shelf | 1 pc |
6 | Shelf | 1 pc |
7 | Sliding Door Track | 1 pc |
8 | Drawer Front | 1 pc |
9 | Drawer Side | 2 pcs |
10 | Drawer Side | 2 pcs |
11 | Drawer Bottom | 2 pcs |
12 | Drawer Back | 1 pc |
13 | Drawer Front | 1 pc |
14 | Back Panel | 1 pc |
15 | Drawer Bottom | 1 pc |
16 | Base Support | 1 pc |
17 | Base Support | 1 pc |
A | Screw (M3.5 x 14) | 34 pcs |
B | Cam Lock | 34 pcs |
C | Dowel (Ø8 x 30) | 24 pcs |
D | Screw (M7 x 48) | 12 pcs |
E | Screw (M3.5 x 14) | 32 pcs |
F | Foot Pad | 8 pcs |
G | Cam Bolt | 6 pcs |
H | Screw (M6 x 25) | 8 pcs |
I | Screw (M6 x 18) | 4 pcs |
J | Handle | 2 pcs |
K | Shelf Pin | 4 pcs |
L | Sliding Door Roller | 4 pcs |
M | Screw (M4 x 25) | 4 pcs |
N | Bracket | 4 pcs |
O | Shelf | 2 pcs |
P | Drawer Slide | 4 pcs |
Q | Ring | 4 pcs |
R | Screw (M3 x 16) | 10 pcs |
Assembly Steps
Step 2: Assemble drawer box. Connect part 11 (Drawer Bottom) to part 12 (Drawer Back) and parts 9 & 10 (Drawer Sides) using cam locks (B), cam bolts (G), and dowels (C).
Step 3: Attach side panels (3) to base panel (1) using cam locks (B), cam bolts (G), and dowels (C).
Step 4: Attach back panel (14) to the assembled structure using D screws.
Step 5: Attach top panel (2) to side panels (3) using cam locks (B), cam bolts (G), and dowels (C).
Step 6: Assemble second drawer box. Connect part 11 (Drawer Bottom) to part 12 (Drawer Back) and parts 9 & 10 (Drawer Sides) using cam locks (B), cam bolts (G), and dowels (C).
Step 7: Attach back panel (14) to the assembled structure using D screws.
Step 8: Attach drawer front (13) to the assembled drawer box (11, 12, 9, 10) using cam locks (B), cam bolts (G), and dowels (C).
Step 9: Attach drawer front (13) to the assembled drawer box (11, 12, 9, 10) using cam locks (B), cam bolts (G), and dowels (C).
Step 10: Attach top panel (2) to side panels (3) using cam locks (B), cam bolts (G), and dowels (C).
Step 11: Attach base panel (1) to side panels (3) using cam locks (B), cam bolts (G), and dowels (C).
Step 12: Attach drawer bottom (15) to the assembled drawer box (11, 12, 9, 10) using cam locks (B), cam bolts (G), and dowels (C).
Step 13: Attach back panel (14) to the assembled structure using D screws.
Step 14: Attach drawer bottom (15) to the assembled drawer box (11, 12, 9, 10) using cam locks (B), cam bolts (G), and dowels (C).
Step 15: Attach base supports (16, 17) to the bottom of the unit using A screws.
Step 16: Attach sliding door rollers (L) to the sliding doors and handles (J) to the drawer fronts.
Step 17: Attach drawer slides (P) to the drawer sides and inside the cabinet.
Step 18: Insert shelves (O) into the unit using shelf pins (K).
Step 19: Attach the sliding doors to the tracks.
Step 20: Final tightening of all screws.