IKEA HÅLLBAR Pull-out Frame Assembly Instructions
Product Overview
This document provides assembly instructions for the IKEA HÅLLBAR pull-out frame, a component designed for efficient waste sorting and recycling within kitchen or storage systems.
The main visual shows the HÅLLBAR pull-out frame structure, a rectangular unit with an open top and a base designed to hold a drawer or basket, supported by side panels.
Parts and Hardware
The assembly requires the main frame panel (identified as AA-2160674) and various hardware components. The main panel has specific dimensions for assembly:
- Widths: 85 mm, 145 mm, 85 mm
- Heights: 256 mm, 80 mm
- Depth/Clearance: 21 mm
⚪
4x
#100831
?️
6x
#109598
?
4x
#100408
?
4x
#100646
Assembly for METOD SEKTION
Follow these steps to assemble the HÅLLBAR pull-out frame with the METOD SEKTION cabinet system.
Step 1: Attach Side Panels
Connect the side panels to the main frame structure. This step requires 4 screws (#109598).
[Diagram shows attaching a panel to the frame using screws.]
Step 2: Install Drawer Slides
Mount the drawer slides onto the assembled frame. Use 4 screws (#109598) for this step.
[Diagram shows drawer slides being attached to the frame with screws.]
Step 3: Attach Drawer/Basket
Secure the drawer or basket to the installed slides. This requires 2 screws (#109598).
[Diagram shows the drawer/basket being attached to the slides with screws.]
Step 4: Attach Door Mechanism
Install the door hinges or mounting hardware. The diagram shows the attachment points for the door mechanism.
[Diagram shows hinge attachment points on the frame.]
Step 5: Insert Drawer
Slide the assembled drawer or basket into the frame. Ensure it engages correctly with the slides, indicated by a "Click!" sound.
[Diagram shows the drawer being inserted and locking into place with a 'Click!'.]
Assembly for ENHET
Follow these steps to assemble the HÅLLBAR pull-out frame with the ENHET cabinet system.
Step 1: Attach Side Panels
Connect the side panels to the main frame structure. This step requires 4 bolts (#100408).
[Diagram shows attaching a panel to the frame using bolts.]
Step 2: Install Drawer Slides
Mount the drawer slides onto the assembled frame. Use 4 bolts (#100408), 4 washers (#100831), and 4 dowels/pins (#100646) for this step. Drilling may be required, indicated by a Ø 6 mm (1/4") size.
[Diagram shows drawer slides being attached with bolts, washers, and pins, with a note on drill size.]
Step 3: Attach Drawer/Basket
Secure the drawer or basket to the installed slides. This requires 2 screws (#109598).
[Diagram shows the drawer/basket being attached to the slides with screws.]
Step 4: Attach Door Mechanism
Install the door hinges or mounting hardware. The diagram shows the attachment points for the door mechanism.
[Diagram shows hinge attachment points on the frame.]
Step 5: Insert Drawer
Slide the assembled drawer or basket into the frame. Ensure it engages correctly with the slides, indicated by a "Click!" sound.
[Diagram shows the drawer being inserted and locking into place with a 'Click!'.]
Important Information
The information icon (ⓘ) indicates important details regarding correct assembly. Pay attention to the visual cues provided in the diagrams to ensure proper installation and avoid incorrect configurations.
[Diagram shows an information icon and examples of correct vs. incorrect attachment.]