LENA LIGHTING SKVER LED Z2 Installation Guide
General Information & Safety
Assembly should be carried out by a qualified person.
For cleaning, use a damp cloth. Do not use abrasive cleaners.
WEEE Disposal: This product is marked according to European Directive 2002/96/CE and Polish law on used electric and electronic equipment. The symbol of a crossed-out waste container indicates that this equipment, after its useful life, must not be disposed of with other household waste. The user is obliged to return it to collection entities for used electric and electronic equipment. Proper handling contributes to avoiding harmful consequences for health and the environment.
Safety Warning: Products in protection class II cannot be used with non-metallic poles. If using a metal pole, it must be grounded.
If the external flexible cord is damaged, it must be replaced only by the manufacturer, its service agent, or a similarly qualified person to avoid risk.
Product Overview
Product Name: SKVER LED Z2
Models: Model WJ, Model MF
Technical Specifications:
- Light Source: LED
- Voltage: 220-240 V
- Frequency: 50/60Hz
- Ingress Protection: IP66
- Certifications: CE, UKCA
Date of Issue: 06.02.2025
Index: 100SK143
Dimensions and Pole Mounting
Dimensions:
Model MF: Height: 476mm, Width: 386mm, Weight: 7.0kg
Model WJ: Height: 476mm, Width: 386mm, Weight: 6.4kg
Pole Diameter Options:
- Ø76mm (Standard)
- Ø60mm (Index: 435478)
- Ø48mm (Index: 435461)
Mounting Details: The luminaire is mounted to poles using specific screws depending on the pole diameter:
- For Ø48mm poles: M6 x 25 screws
- For Ø60mm poles: M6 x 18 screws
- For Ø76mm poles: M6 x 10 screws
Maximum Installation Height: 8 meters.
Installation Steps
Step 1: Pole Preparation and Luminaire Attachment
Ensure the pole is prepared for mounting. The luminaire holder should be in the correct position on the pole. Attach the luminaire to the pole bracket using the provided screws (e.g., 7Nm torque for 3 screws).
Step 2: Cable Entry and Securing
Feed the power cable through the designated entry point on the luminaire. Secure the cable entry gland to maintain at least IP66 protection.
Step 3: Wiring Connection
Connect the power supply wires to the luminaire terminals:
- Connect the Neutral wire (Blue) to the N terminal.
- Connect the Live wire (Brown) to the L terminal.
- Connect the Dimming/Control wires (Black and Grey) to the DA terminals.
Use appropriate cable size (e.g., 2x1.5mm²) and ensure the cable diameter is within the specified range (Ø7÷12 mm).
Step 4: Final Assembly and Power On
Secure the luminaire head to the pole. Once all connections are made and secured, the luminaire can be powered on. ▶️ Power On
Company Information
LENA LIGHTING S.A.
ul. Kornicka 52, 63-000 Sroda Wlkp., POLAND
Tel: +48 61 28 60 300
Email: office@lenalighting.pl
Website: www.lenalighting.pl