YITAHOME
QS-V1 5-Drawer Storage Chest
Contact Us
For questions about YITAHOME product installation, email after-sale.cs@hotmail.com.
For Amazon.co.uk orders: Log into your Amazon account, go to 'Your Orders', find the purchase, and click 'Contact Seller'.
Product Name
5-Drawer Storage Chest
Important Warnings
Attention: Do not tighten screws until assembly is complete.
Warning: Drawer storage towers are lightweight. Pulling them down can be dangerous, especially when children are playing. Professional installation is highly recommended.
Parts List
Item No. | Description | Quantity |
---|---|---|
A | Base frame (bottom panel) | 1pc |
B | Left side frame | 1pc |
C | Right side frame | 1pc |
D | Middle shelf panel | 1pc |
E | Horizontal support rails | 2pcs |
F | Rear horizontal support rail | 1pc |
G | Drawer side panel | 2pcs |
H | Drawer base panel (smaller drawers) | 2pcs |
I | Drawer front panel (larger drawers) | 3pcs |
J | Drawer back panel (larger drawers) | 3pcs |
K | Drawer base panel (larger drawers) | 5pcs |
L | Drawer handle | 4pcs |
M | Screw (M6x10mm) | 4pcs |
N | Screw (M6x25mm) | 8pcs |
O | Screw (M5x10mm) | 4pcs |
P | Screw (M4x60mm) | 2pcs |
Q | Screw (M4x12mm) | 10pcs |
R | Anti-tip accessory kit | 1pc |
Assembly Instructions
Step 1: Frame Orientation
Confirm that the iron frames (Parts B and C) are placed correctly and facing the correct direction. Ensure the holes marked by triangles ? on Part B and Part C face the same direction.
Diagram shows side frames B and C with triangular holes.
Step 2: Base Assembly
Attach the base frame (Part A) to the side frames (Parts B and C) using screws (Part N ?). Ensure the correct orientation as shown in the diagram.
Diagram shows side frames B and C connected to base A using screws N.
Step 3: Adding Shelves and Supports
Attach the middle shelf panel (Part D) and horizontal support rails (Part E) to the frame assembly using screws (Part N ?).
Diagram shows shelf D and rails E being attached to the frame assembly using screws N.
Step 4: Attaching Rear Support
Attach the rear horizontal support rail (Part F) to the frame assembly using screws (Parts L and O ?). Ensure the correct orientation of Part F.
Diagram shows rear support F being attached with screws L and O.
Step 5: Unit Rotation
Rotate the assembled frame 180 degrees ?.
Diagram shows the partially assembled unit being flipped.
Step 6: Drawer Assembly (Smaller Drawers)
Assemble the smaller drawer boxes. Connect drawer side panels (Part G) to the drawer base panel (Part H) and drawer back panel (Part K) using screws (Part Q ?).
Diagram shows assembly of drawer components G, H, K, and Q.
Step 7: Drawer Assembly (Larger Drawers)
Assemble the larger drawer boxes. Connect drawer side panels (Part G) to the drawer base panel (Part K) and drawer back panel (Part J) using screws (Part Q ?). Attach drawer handles (Part L) to the drawer front panels (Part I) using screws (Part M ?).
Diagram shows assembly of drawer components G, K, J, Q, L, M, and I.
Step 8: Final Assembly
Insert the assembled drawers into the main frame. The arrows ➡️ indicate the direction of insertion.
Diagram shows the main frame and the drawers being slid into place.
Step 9: Anti-Tip Installation
For safety and stability, secure the anti-tip accessories (Part R) to the wall to prevent tipping, injury, and property damage. Use the provided screws (Part P ?) and follow the diagram for placement.
Diagram shows anti-tip strap R being attached to the unit and the wall using screws P.
Step 10: Completion
Installation Completed ✔️.
Diagram shows the fully assembled product and text indicating completion.