Cersanit Carina New Clean Wall-Hung Toilet Installation Guide
Step 1: Toilet Dimensions and Mounting Points
This section illustrates a wall-hung toilet. Two primary mounting distances are specified: 'n = 180 mm' (indicated by arrow I) and 'n = 230 mm' (indicated by arrow II). Below these, diagrams show how these distances are marked on a tiled wall for the placement of mounting rods.
Step 2: Preparing Wall Fixings and Connections
Shows threaded mounting rods being inserted into wall anchors. A pipe connector with a rubber seal is depicted, ready for attachment to the toilet's waste outlet.
Step 3: Measuring for Toilet Placement
Demonstrates the process of positioning the wall-hung toilet against the wall. A measuring tool is used to ensure correct alignment with the wall fixings. An eye icon ?️ indicates the recommended viewing perspective for accurate placement.
Step 4: Preparing Pipe Connectors
Presents two types of pipe connectors, labeled L1 and L2. One diagram shows a pipe connector being cut to the required length using a saw ?.
Step 5: Adjusting Pipe Angle
Illustrates a pipe connector being angled for optimal connection. A diagram indicates an approximate 15-degree angle and a dimension labeled 'A'.
Step 6: Installing the Mounting Plate
Depicts the wall mounting plate being secured to the wall using threaded bolts ?.
Step 7: Connecting Toilet to Waste Pipe
Shows the components required for connecting the toilet to the waste pipe. These include threaded rods, a sealing ring, and a pipe adapter. Arrows indicate the assembly sequence. Four blocks labeled "SOAP" (?) are shown with arrows pointing to connection points, suggesting lubrication for easier assembly.
Step 8: Securing the Toilet
Illustrates the toilet being attached to the wall mounting system. A magnified view shows nuts and washers being tightened with a wrench ? to secure the fixture.
Step 9: Final Sealing and Curing
Depicts the final step of applying sealant ? around the toilet base where it meets the wall. A clock icon ⏰ indicates a 24-hour curing period is required before use.