Edge-corE AIS800 Gigabit AI and Data Center Ethernet Switch

Edge-corE AIS800 Gigabit AI and Data Center Ethernet Switch

Package Contents

  1. 64-Port 800 Gigabit AI & Data Center Ethernet Switch AIS800- 64O
    Package Contents
  2. Slide-rail mounting kit—2 rack slide-rails and install guide
    Package Contents
  3. AC power cord, type IEC C19/C20 (included with AC PSUs only)
    Package Contents
  4. DC power cord (included with DC PSUs only)
    Package Contents
  5. Documentation—Quick Start Guide (this document) and Safety and Regulatory Information
    Package Contents

Overview

  1. 64 x 800G OSFP800 ports
  2. Management Ports: 1 x 1000BASE-T RJ-45, 2 x 25G SFP28, RJ-45 console, USB
  3. Timing Ports: 1PPS, 10 MHz, TOD
  4. System LEDs
  5. 2 x grounding screws
  6. 2 x AC or DC PSUs
  7. 4 x fan trays
    Overview

System LEDs/Buttons

  1. OSFP800 LEDs: Purple (800G), Blue (400G), Cyan (200G), Green (100G), Red (50G)
  2. RJ-45 MGMT LEDs: Left: Green (link/act), Right: Green (speed)
  3. SFP28 LEDs: Green (link/activity)
  4. System LEDs:
    LOC: Flashing Green (switch locator)
    DIAG: Green (OK), Red (fault)
    ALRM: Red (fault)
    FAN: Green (OK), Red (fault)
    PSU1/PSU2: Green (OK), Red (fault)
  5. RST: Reset button
    System LEDs/Buttons

FRU Replacement

PSU Replacement

  1. Remove the power cord.
  2. Press the release latch and remove the PSU.
  3. Install replacement PSU with matching airflow direction.
    PSU Replacement

Fan Tray Replacement

  1. Pull the handle release latch.
  2. Remove the fan tray from the chassis.
  3. Install a replacement fan with matching airflow direction.
    Fan Tray Replacement

Symbol Caution: During switch operation, fan replacement should be completed within two minutes to prevent the switch shutting down due to its built-in over-temperature protection.

Installation

Symbol Warning: For a safe and reliable installation, use only the accessories and screws provided with the device. Use of other accessories and screws could result in damage to the unit. Any damages incurred by using unapproved accessories are not covered by the warranty.

Symbol Caution: The device must be installed in a restricted-access location.

Symbol Note: The device has the Open Network Install Environment (ONIE) software installer preloaded, but no device software image.

Note: The drawings in this document are for illustration only and may not match your particular model.

Mount the Device

Symbol Caution: This device must be installed in a telecommunications room or a server room where only qualified personnel have access.
Mount the Device

Using the Slide-Rail Kit

Follow instructions in the install guide provided in the slide-rail kit to mount the device in a rack.

Symbol Note: Stability hazard. The rack may tip over causing serious personal injury.
Before extending the rack to the installation position, read the installation instructions.
Do not put any load on the slide-rail mounted equipment in the installation position.
Do not leave the slide-rail mounted equipment in the installation position.

Ground the Device

Verify Rack Ground

Ensure the rack on which the device is to be mounted is properly grounded and in compliance with ETSI ETS 300 253. Verify that there is a good electrical connection to the grounding point on the rack (no paint or isolating surface treatment).
Ground the Device

Attach Grounding Wire

Attach a grounding wire to the grounding point on the device rear panel using two M6 screws and washers with a grounding lug (Panduit LCDXN2-14AF-E or equivalent, not included). The grounding lug should accommodate #2 AWG stranded copper wire (green with yellow stripe, not included).

Connect Power

Install one or two AC or DC PSUs and connect them to an AC or DC power source.
Connect Power

Symbol Note: When using only one AC PSU to power a fully loaded system, be sure to use a high-voltage source (200–240 VAC).

  1. -48 – -60 VDC
  2. DC return
  3. Signal +
  4. Signal –
    Connect Power

Symbol Caution: Use a UL/IEC/EN 60950-1 and/or 62368-1 Make Management Connections certified power supply to connect to a DC converter.

Caution: All DC power connections should be performed by a qualified professional.

Symbol Note: Use #4 AWG / 21.2 mm2 copper wire (for a -48 to -60 VDC PSU) to connect to a DC PSU.

Make Network Connections

800G OSFP800 Ports

Install transceivers and then connect fiber optic cabling to the transceiver ports.
Alternatively, connect DAC or AOC cables directly to the slots.
Make Network Connections

Connect Timing Ports

1PPS Port

Use a coax cable to connect the 1-pulse-per-second (1PPS) port to another synchronized device.

10 MHz Port

Use a coax cable to connect the 10 MHz port to another synchronized device.

TOD Port

Use a shielded cable to connect the Time-of-Day (TOD) RJ-45 port to other devices that use these synchronization signals.
Connect Timing Ports

Make Management Connections

25G SFP28 In-Band Management Ports

Install transceivers and then connect fiber optic cabling to the transceiver ports.

10/100/1000M RJ-45 Out-of-Band Management Port

Connect Cat. 5e or better twisted-pair cable.

RJ-45 Console Port

Use an RJ-45-to-DB-9 null-modem console cable (not included) to connect to a PC running terminal emulator software. Use a USB-tomale DB-9 adapter cable (not included) for connections to PCs that do not have a DB-9 serial port.

Configure the serial connection: 115200 bps, 8 characters, no parity, one stop bit, 8 data bits, and no flow control.

Console cable pinouts and wiring:
Make Management Connections

Device’s RJ-45 Console Null Modem PC’s 9-Pin DTE Port
6 RXD (receive data) <————— 3 TXD (transmit data)
3 TXD (transmit data) —————> 2 RXD (receive data)
4,5 SGND (signal ground) —————– 5 SGND (signal ground)

Hardware Specifications

Switch Chassis 

Size (WxDxH) 440 x 649.2 x 87 mm (17.32 x 25.56 x 3.43 in.)
Weight 20.5 kg (45.19 lb), with 2 PSUs and 4 fans installed
Temperature Operating (front- to- back): 0° C to 40° C (32° F to 104° F) at 1800 m Operating (back-to-front): 0° C to 35° C (32° F to 95° F) at 1800 m *subject to used optics Storage: -40° C to 70° C (-40° F to 158° F)
Humidity Operating: 5% to 95% (non-condensing)
AC PSU
AC Input 200-240 VAC, 50/60 Hz, 16 A max.
DC PSU
DC Input -48 to -60 VDC 80 A max.
System Input Rating
AC Input 200-240 VAC, 50/60Hz, 16 A max. per PS
DC Input -48 – -60 VDC, 80 A max. per PS

Regulatory Compliances 

Emissions EN 55032 Class A
EN 61000-3-2
EN 61000-3-3
VCCI-CISPR 32 Class A
AS/NZS CISPR 32 Class A
ICES-003 Issue 7 Class A
FCC Class A
EN 300 386 Class A
CNS 15936 Class A
Immunity EN 55035
IEC 61000-4-2/3/4/5/6/8/11
EN 300 386
Safety UL (CSA 22.2 No 62368-1 & UL62368-1)
CB (IEC/EN 62368-1)
BSMI CNS 15598-1

CUSTOMER SUPPORT

www.edge-core.com
Logo

Documents / Resources

Edge-corE AIS800 Gigabit AI and Data Center Ethernet Switch [pdf] User Guide
AIS800 Gigabit AI and Data Center Ethernet Switch, AIS800, Gigabit AI and Data Center Ethernet Switch, Data Center Ethernet Switch, Ethernet Switch

References

Leave a comment

Your email address will not be published. Required fields are marked *