Edge-core AS9516-32D 32-Port 400G Ethernet 
Switch User Guide

Edge-core AS9516-32D 32-Port 400G Ethernet Switch User Guide

www.edge-core.com

Package Contents

Edge-core AS9516-32D 32-Port 400G Ethernet Switch - Package Contents

  1. AS9516-32D switch
  2. Rack mounting kit—2 front-post brackets, 2 rear-post brackets, 1 left and 1 right rear-post brackets ears, 20 screws, and 2 earlocking screws
  3. Power cord (x2)—either Japan, US, Continental Europe, UK or China
  4. Documentation—Quick Start Guide (this document) and Safety and Regulatory Information

Overview

Edge-core AS9516-32D 32-Port 400G Ethernet Switch - Overview

  1. Management ports: 1000BASE-T RJ-45, RJ-45 Console, USB
  2. System LEDs
  3. 32 x 400G QSFP-DD ports
  4. Port LED select button and status LEDs
  5. Grounding screw
  6. 2 x AC PSUs
  7. 6 x fan trays

System LEDs/Buttons

Edge-core AS9516-32D 32-Port 400G Ethernet Switch - System LEDs Buttons

System (Left): Green (system OK), Amber (system fault)
System (Right): Flashing Amber (switch locator)
Reset Button
Port Select Button: Selects LED display for upper or lower ports
Upper/Lower Ports: Green (selected)

Port LEDs

Edge-core AS9516-32D 32-Port 400G Ethernet Switch - Port LEDs

SFP-DD LEDs
400G: 1 LED Blue
200G Breakout: 1 LED White, 1-2
LEDs Green
100G Breakout: 1-4 LEDs Green
50G Breakout: 1 LED Cyan

RJ-45 Mgmt LEDs
Left: Green (link)
Right: Green (activity)

FRU Replacement

PSU Replacement

Edge-core AS9516-32D 32-Port 400G Ethernet Switch - PSU Replacement

  1. Remove the power cord.
  2. Press the release latch and remove the PSU.
  3. Install replacement PSU with matching airflow direction.

Fan Tray Replacement

Edge-core AS9516-32D 32-Port 400G Ethernet Switch - Fan Tray Replacement

  1. Press the handle release latch.
  2. Remove fan tray from the chassis.
  3. Install replacement fan with matching airflow direction.

bar code

Installation

warning iconWarning: For a safe and reliable installation, use only the accessories and screws provided with the device. Use
of other accessories and screws could result in damage to the unit. Any damages incurred by using unapproved accessories are not covered by the warranty.

caution iconCaution: Risk of explosion if battery is replaced by an incorrect type. Dispose of used batteries according to the manufacturer’s instructions.

caution iconCaution: The switch includes plug-in power supply (PSU) and fan tray modules that are installed into its chassis. Make sure all installed modules have a matching airflow direction (front-toback or back-to-front)

note iconNote: The switch has the Open Network Install Environment (ONIE) software installer preloaded on the switch, but no switch software image. Information about compatible switch software can be found at www.edge-core.com.

  1. Mount the Switch
    caution iconCaution
    : This device must be installed in a telecommunications room or a server room.
    Edge-core AS9516-32D 32-Port 400G Ethernet Switch - Mount the Switch
    1. Attach the Brackets
    Use the included screws to attach the front- and rear-post brackets.
    Edge-core AS9516-32D 32-Port 400G Ethernet Switch - Attach the Brackets2. Mount the Switch
    Mount the switch in the rack and secure it with rack screws.
    Edge-core AS9516-32D 32-Port 400G Ethernet Switch - Mount the Switch 23. Lock the Rear-Post Brackets
    Use the included screws to lock the position of the rear-post brackets.
  2. Ground the Switch
    Edge-core AS9516-32D 32-Port 400G Ethernet Switch - Ground the Switch
    Verify Rack Ground
    Ensure the rack on which the switch is to be mounted is properly grounded and in compliance with ETSI ETS 300 253. Verify that there is a good electrical connection to the grounding point on the rack (no paint or isolating surface treatment).
    Attach Grounding Wire
    Attach a lug (not provided) to a #14 AWG minimum grounding wire (not provided), and connect it to the grounding point on the switch rear panel. Then connect the other end of the wire to rack ground.

    caution iconCaution: The chassis ground connection must not be Make Management Connections removed unless all supply connections have been disconnected.

  3. Connect Power
    Edge-core AS9516-32D 32-Port 400G Ethernet Switch - Connect Power
    Install two PSUs and connect them to an AC power source.
    caution iconCaution: Use the AC power cord supplied with the switch. For International use, you may need to change the AC line cord. You must use line cord sets that have been approved for the socket type in your country.

  4. Make Network Connections
    Edge-core AS9516-32D 32-Port 400G Ethernet Switch - Make Network ConnectionsQSFP-DD Ports

    Install transceivers and then connect fiber optic cabling to the transceiver ports.
    Alternatively, connect DAC or AOC cables directly to the QSFP-DD slots.
  5. Make Management Connections
    Edge-core AS9516-32D 32-Port 400G Ethernet Switch - Make Management Connections
    RJ-45 Console Port

    Connect the included console cable and then configure the serial connection: 115200 bps, 8 characters, no parity, one stop bit, 8 data bits, and no flow control.
    10/100/1000M RJ-45 Management Port
    Connect Cat. 5e or better twisted-pair cable.

Hardware Specifications

Edge-core AS9516-32D 32-Port 400G Ethernet Switch - Hardware Specifications

Documents / Resources

Edge-core AS9516-32D 32-Port 400G Ethernet Switch [pdf] User Guide
AS9516-32D, 32-Port 400G Ethernet Switch, AS9516-32D 32-Port 400G Ethernet Switch, 400G Ethernet Switch, Ethernet Switch
Edge-Core AS9516-32D 32 Port 400G Ethernet Switch [pdf] User Guide
AS9516-32D 32 Port 400G Ethernet Switch, AS9516-32D, 32 Port 400G Ethernet Switch, Ethernet Switch, Switch

References

Leave a comment

Your email address will not be published. Required fields are marked *