About This Document
This document outlines the essential steps and procedures for the successful installation of Thermo Fisher Scientific's iCAP PRO Series ICP-OES systems. It is intended for use by trained and certified personnel, including Thermo Fisher Scientific field service engineers.
The procedures detailed herein cover the entire installation process, from initial hardware setup to software configuration and final performance verification. For customer-specific procedures and operational guidance, please refer to the iCAP PRO Series ICP-OES Operating Manual.
A mandatory iCAP PRO Master Control Checklist must be utilized throughout the installation process to track progress and ensure all steps are completed and documented.
Key Installation Stages
- General Installation Procedure: An overview of the installation process, including special instructions, flow diagrams, and required tools.
- Pre-Installation: Site readiness assessment and checklists.
- Hardware Installation: Detailed steps for receiving, moving, unpacking, and connecting the instrument and its components.
- Computer Setup and Configuration: Guidance on setting up the associated computer system and software.
- Software Installation: Procedures for installing and activating the Qtegra software and related capabilities.
- System Pre-Check and Performance Verification: Steps to ensure the instrument is functioning correctly and meeting performance standards.
- Customer Familiarization: Information to help users understand and operate the instrument.
Important Safety Information
Always adhere to the safety warnings and precautions outlined in the iCAP PRO Series ICP-OES Pre-Installation Requirements Guide and the iCAP PRO Series ICP-OES Operating Manual. This includes wearing appropriate personal protective equipment (PPE) such as safety boots, gloves, and goggles when handling liquids or potentially hazardous parts.
Further Information
For additional details and support, please visit the Thermo Fisher Scientific website.