3x2x2M Greenhouse Assembly Instructions

Please carefully follow assembly instructions. Suggested 2-4 persons for construction.

Parts List

No.DescriptionQuantity
1Tube4PCS
2Tube4PCS
3Tube12PCS
4Tube7PCS
5Curve Tube12PCS
6Curve Tube4PCS
7Diagonal Support Tube2PCS
7ADiagonal Support Tube2PCS
8Bolt (Shorter)24PCS
9Bolt (Longer)12PCS
10Nut36PCS
11Wrench1PC
12Allen Key (L-shaped wrench)1PC
13Stake4PCS
14Rope4PCS
15Cover1PC
16Plastic Cap10PCS

Assembly tools shown in the initial image include ropes, L-shaped wrenches (Allen keys), and a standard wrench.

Step 1: Main Structure Assembly

Assemble four sets of No. 5 curve tubes together to form one arch section. Use the shorter bolts (No. 8) for this connection. Place the assembled curve tubes on flat ground, ensure they are horizontal, and then tighten the nuts. Assemble four sets of No. 5 tubes with No. 6 tubes in the same manner to create additional arch sections.

Next, assemble two sets of floor tubes (No. 3 + No. 4) using the shorter bolts. Then, connect the horizontal frame tubes (No. 4 + No. 3 + No. 3) together.

Step 2: Frame Assembly

Assemble two sets of diagonal support tubes (No. 7 + No. 7A) using the shorter bolts (No. 8).

Loosely assemble the complete frame structure. Ensure all connections are made but do not fully tighten bolts yet. Tightening will occur in the final position.

Step 3: Frame Assembly Continued

Continue assembling the main frame structure by connecting the various tubes and arches. Pay attention to the diagrams for correct placement of each part.

Loosely assemble the complete frame. Ensure all connections are made but do not fully tighten bolts yet. Tightening will occur in the final position.

Step 4: Frame Assembly and Caps

Continue assembling the frame structure, adding more connecting tubes and reinforcing elements.

Important: Put all plastic caps (No. 16) on each end of the tubes first. This is to avoid any possible tear damage when covering the roof.

Loosely assemble the completed frame. Ensure all connections are made but do not fully tighten bolts yet. Tightening will occur in the final position.

Step 5: Ground Preparation and Frame Placement

For maximum stability of your polytunnel, it is recommended to dig a trench around the base of the structure. The trench should be approximately 20cm wide and dug around the entire perimeter where the greenhouse will sit.

Carefully place the assembled frame inside the prepared trench. Once positioned, fill the trench with soil to secure the frame firmly to the ground.

Step 6: Cover Attachment and Securing

Carefully attach the cover (No. 15) to the frame. Tie the string located at the back of the cover to the frame to help secure it.

Use the ropes (No. 14) and stakes (No. 13) provided. Secure these to the four corners of the greenhouse to reinforce its stability against wind and movement.

WARNING

Covering the roof requires care. Ensure all parts of the cover are in the correct position to avoid distorting the greenhouse frame structure.

DO NOT USE IN BAD WEATHER CONDITIONS, such as rainstorm, hailstone, heavy snow, and heavy wind.

Models: Walk In Tunnel Greenhouse Portable Plant, Walk, In Tunnel Greenhouse Portable Plant, Greenhouse Portable Plant, Portable Plant, Plant

PDF preview unavailable. Download the PDF instead.

111 1688020131901 Corel PDF Engine Version 14.0.0.701 CorelDRAW

Related Documents

Preview 6x3x2M Greenhouse Assembly Instructions
Step-by-step assembly guide for the VEVOR 6x3x2M Greenhouse, detailing parts, base layout, frame construction, and securing the cover.
Preview 6x3x2M Greenhouse Assembly Instructions
Detailed assembly instructions for the 6x3x2M Greenhouse, including parts list, base layout, and step-by-step guidance for construction.
Preview VEVOR Greenhouse Assembly and Features
Comprehensive guide to assembling and understanding the features of the VEVOR greenhouse, including its dimensions, materials, and benefits for plant protection.
Preview VEVOR GH48 Walk-in Greenhouse Canopy User Manual
Comprehensive user manual for the VEVOR GH48 Walk-in Greenhouse Canopy, including assembly instructions, technical specifications, package contents, precautions, and contact information.
Preview VEVOR Tunnel Greenhouse User Manual
Comprehensive user manual for the VEVOR Tunnel Greenhouse (3x6x2.25M(6)G), providing assembly instructions, safety precautions, and product details.
Preview Assembly Instructions for PVC Cover Dome Greenhouse
Step-by-step assembly guide for a PVC cover dome greenhouse, detailing the required pipes, connectors, and fixing accessories.
Preview VEVOR Raised Garden Bed Assembly Instructions
Step-by-step instructions for assembling the VEVOR galvanized raised garden bed. Learn how to connect panels and columns for a durable outdoor planter.
Preview VEVOR Steel Garden Carts User Manual V500/V680
Comprehensive user manual for VEVOR Steel Garden Carts (Models V500 and V680). Includes safety warnings, assembly instructions with detailed textual descriptions of diagrams, and product specifications. Learn how to assemble and safely operate your garden cart.