6x3x2M Greenhouse Assembly Instructions

Please carefully follow assembly instructions. Suggested 3-5 people for construction.

Parts List

NO.12345678910111213141516
Quantity4PCS10PCS39PCS9PCS21PCS7PCS4PCS53PCS4PCS57PCS1PC1PC4PCS4PCS1PC14PCS

Base Layout

Assemble for 2 sets floor tubes No3+No4+No3 using the shorter bolts, and the horizontal frame No4+No3+No3+No3+No3+No3 together.

Step 1: Assemble the Frame Base

Loosely assemble the complete frame, before tightening all bolts in the final position.

Diagram Description: This step shows the initial assembly of the greenhouse frame, connecting various tubes (labeled 1, 2, 3, 4, 7) using bolts (labeled 8) and possibly nuts (labeled 10). Close-up views illustrate how the bolts and tubes are joined.

Step 2: Add Curved Supports

Loosely assemble the complete frame, before tightening all bolts in the final position.

Diagram Description: This step continues the frame assembly, introducing curved tubes (labeled 5) and straight tubes (labeled 6) to the structure. Bolts (labeled 10) are used for connections. Close-up views show the connection details.

Step 3: Continue Frame Assembly

Assemble for curve tubes No5+No5+No5+No.6. Loosely assemble the complete frame, before tightening all bolts in the final position.

Diagram Description: This step shows the assembly of the curved sections of the greenhouse using tubes labeled 5 and 6, connected with bolts (labeled 10) and possibly other components (labeled 1, 3, 4, 7). The overall structure begins to take its arched shape.

Step 4: Add Plastic Caps

Put all plastic caps No16 on each end of the tubes firstly to avoid any possible tear damage when covering the roof.

Diagram Description: This step illustrates the placement of plastic caps (labeled 16) on the ends of the greenhouse frame tubes. It also shows the continued assembly of the frame, with bolts (labeled 8, 10) and possibly other parts (labeled 9) being used.

Step 5: Secure the Greenhouse Base

For maximum stability of your polytunnel, we recommend digging a 20cm width trench around the base of the polytunnel and back. Put the frame inside the trench, filling with the soil.

Diagram Description: This step shows two scenarios. The first depicts digging a trench around the base of the greenhouse. The second shows the greenhouse frame being placed into the trench and secured with soil.

Step 6: Attach the Cover and Secure

Tied the string in the back of the cover to the frame. Use the ropes (labeled 13) and stakes (labeled 14) for the four corners of the greenhouse to reinforce its stability. The cover (labeled 15) is shown being attached.

WARNING: Covering the roof carefully, ensuring all places are in the right position, and avoiding making the frame structure of the greenhouse out of shape.

DO NOT USE IN BAD WEATHER CONDITIONS, such as rainstorm, hailstone, heavy snow, and heavy wind.

Diagram Description: This step shows the greenhouse cover being pulled over the frame and secured. Ropes and stakes are used to anchor the greenhouse, particularly at the corners, for stability.

Models: 20 x 10 x 7, 20 Feet Tunnel Greenhouse, 20 Feet, Tunnel Greenhouse, Greenhouse

PDF preview unavailable. Download the PDF instead.

Vevor-20x10x7ft-Users-Manual ?v=1710534656 PDFium PDFium

Related Documents

Preview3x2x2M Greenhouse Assembly Instructions | VEVOR
Comprehensive assembly guide for the VEVOR 3x2x2M Greenhouse. This document provides detailed steps, a parts inventory, and essential warnings for constructing your walk-in polytunnel.
Preview6x3x2M Greenhouse Assembly Instructions
Step-by-step assembly guide for the VEVOR 6x3x2M Greenhouse, detailing parts, base layout, frame construction, and securing the cover.
PreviewVEVOR Tunnel Greenhouse User Manual
Comprehensive user manual for the VEVOR Tunnel Greenhouse (3x6x2.25M(6)G), providing assembly instructions, safety precautions, and product details.
PreviewVEVOR Greenhouse Assembly and Features
Comprehensive guide to assembling and understanding the features of the VEVOR greenhouse, including its dimensions, materials, and benefits for plant protection.
PreviewAssembly Instructions for PVC Cover Dome Greenhouse
Step-by-step assembly guide for a PVC cover dome greenhouse, detailing the required pipes, connectors, and fixing accessories.
PreviewVEVOR Product Warranty & Service Policy: Coverage, Returns, and Support
Understand VEVOR's product warranty, including 12-month coverage, 30-day return policy, and how to contact VEVOR for technical support, returns, and replacements. Learn what is covered and excluded.
PreviewVEVOR FTC5220 Cordless Concrete Vibrator User Manual
Comprehensive user manual for the VEVOR FTC5220 Cordless Concrete Vibrator, covering essential safety guidelines, detailed specifications, operational procedures, assembly instructions, maintenance tips, and optional accessories for effective concrete vibration.
PreviewVEVOR Mountainboard Assembly Instructions & Parts List
Detailed guide for assembling your VEVOR mountainboard, including a complete parts list and step-by-step instructions for attaching wheels, trucks, and foot straps.