Outsunny 84H-116V01 Wooden Plant Stand with Trellis
Model: 84H-116V01
Product Code: IN231100612V01_GL
Assembly Time: Approximately 1 Hour
Steps: 8
Parts List
- Part A: Base Support (x3)
- Part B: Shelf (x2)
- Part C: Side Frame (x1)
- Part D: Support Bar (x2)
- Part E: Lower Trellis Panel (x1)
- Part F: Upper Trellis Panel (x1)
- Part G: Top Shelf (x1)
- Part H: Vertical Support (x1)
Hardware List
- Hardware I: Screw M7*40 (x6)
- Hardware J: Nut M10 (x8)
- Hardware K: Wrench (x1)
- Hardware L: Screw M4 (x1)
- Hardware M: Bracket (x2)
- Hardware N: Screw M4*35 (x17)
- Hardware P: Screw M4*30 (x4)
- Hardware Q: Screw M6*40 (x8)
Assembly Instructions
Step 1: Attach Base Supports
Connect the base supports (Part A) to the side frames (Part C) and vertical supports (Part H) using six screws (Hardware I). Ensure the parts are aligned correctly. A close-up view shows screw I inserted through part A into part H.
Step 2: Install Shelves
Attach the shelves (Part B) to the side frames (Part C) and vertical supports (Part H) using twelve screws (Hardware N). Three screws (Nx3) are used per shelf connection point. A close-up view shows screws N inserted through the shelves (B) into the side frames (C) and vertical supports (H).
Step 3: Attach Brackets to Trellis
Secure the brackets (Part M) to the lower trellis panel (Part E) using two screws (Hardware M). The brackets will be used to attach the trellis to the main structure.
Step 4: Mount Lower Trellis
Attach the lower trellis panel (Part E) to the assembled base structure. Use four bolts (Hardware J) and four screws (Hardware Q) along with the brackets (Part M) to secure it. A close-up view shows the assembly of parts E, J, Q, and K (wrench) connecting to part C.
Step 5: Attach Upper Trellis and Top Shelf
Attach the upper trellis panel (Part F) to the structure using five screws (Hardware N). Then, attach the top shelf (Part G) to the upper trellis panel (Part F) using four screws (Hardware P). A close-up view shows screws N securing part F to the structure, and screws P securing part G to part F.
Step 6: Secure Upper Trellis and Top Shelf
Further secure the upper trellis panel (Part F) and top shelf (Part G) using four screws (Hardware P). A close-up view shows screws P inserted through part F into part D (Support Bar) and part G.
Step 7: Final Assembly Check
Complete the assembly by attaching the remaining hardware. The diagram shows the final product and highlights the use of parts J, M, and Q for final connections. A close-up view shows the final assembly points.
Important Note
Do not confuse similar screws. Do not tighten bolts fully until all parts are connected.
Customer Support
For any questions, please contact the customer care center. Details vary by region:
- US: 001-877-644-9366, customerservice@aosom.com (Imported by Aosom LLC)
- CA: 416-792-6088, customerservice@aosom.ca (Imported by Aosom Canada Inc.)
- UK: 0044-800-240-4004, enquiries@mhstar.co.uk (Importer: MH STAR UK LTD)
- FR: 0033-1-84166106, aosom@mhfrance.fr (Imported by MH FRANCE)
- DE: 0049-0(40)-87408465, service@aosom.de (Importer: MH Handel GmbH)
- ES: 0034-931294512, atencioncliente@aosom.es (Importer: SPANISH AOSOM, S.L.)
- IT: 0039-0249471447, clienti@aosom.it (Importer: AOSOM Italy srl)
- PT: 0034-931294512, info@aosom.pt (Importer: SPANISH AOSOM, S.L)
Product made in China.
Recycling information: Association, Delivery, Waste Disposal. Addresses at quefairedemesdechets.fr