Outsunny 850-870V00 Garden Trellis Assembly Instructions
Product ID: IN221100849V02_GL
Estimated Assembly Time: 0.5 HR
Total Steps: 8️⃣ STEPS
Parts List
- Part A: Long rod/tube (x4)
- Part B: Short rod/tube with bracket (x2)
- Part C: Flat rectangular piece (x2)
- Part D: Long flat piece with holes (x4)
- Part E: Short flat piece with holes (x4)
- Part F: Long thin rod/tube (x2)
- Part G: Short thin rod/tube (x5)
- Part H: Very thin rod/tube (x6)
- Part I: Rolled sheet (x1)
Hardware List
- Hardware a: Screw, Φ4*40 (+1 spare) (x4)
- Hardware b: Screw, Φ4*25 (+1 spare) (x29)
- Hardware c: Screw, Φ3*10 (+1 spare) (x5)
- Hardware d: Small screw/pin (x12)
NOTE: Do not confuse similar screws.
Assembly Instructions
Step 01: Base Frame Assembly
Connect two 'A' pieces to two 'B' pieces, forming an 'X' shape. The 'B' pieces with brackets should be positioned at the top of the 'A' pieces.
Visual Description: Two vertical 'A' pieces are joined at the top by two 'B' pieces, creating an inverted 'V' or 'X' shape.
Step 02: Top Crossbars
Attach two 'C' pieces between the top ends of the 'A' pieces, forming a rectangular top frame.
Visual Description: Two horizontal 'C' pieces connect the upper parts of the 'A' pieces, completing the top section.
Step 03: Bottom Base
Assemble the base by connecting four 'D' pieces to form a rectangle. Ensure the holes on 'D' pieces are oriented correctly for subsequent steps.
Visual Description: Four 'D' pieces are joined at their ends to create a rectangular base structure.
Step 04: Connecting Sections
Attach the 'B' and 'C' assemblies (from steps 01 & 02) to the base frame (from step 03) using the 'D' pieces. The 'B' pieces should align with the sides of the base.
Visual Description: The 'X' shaped upper assembly is attached to the rectangular base using 'D' pieces.
Step 05: Adding Side Supports
Attach four 'E' pieces and two 'F' pieces to the main frame. The 'E' pieces are likely shorter supports, and 'F' pieces are longer vertical supports.
Visual Description: Shorter 'E' pieces and longer 'F' pieces are added to the sides of the structure, likely as part of the main uprights.
Step 06: Installing Shelves/Grid
Install five 'G' pieces and six 'H' pieces to create the grid or shelf structure. These are likely the horizontal and vertical elements of the trellis.
Visual Description: Multiple 'G' and 'H' pieces are attached horizontally and vertically to form the grid pattern of the trellis.
Step 07: Final Touches (Screws)
Secure the structure using the remaining hardware. Use 'a' screws (Φ4*40) and 'b' screws (Φ4*25) at various connection points as indicated.
Visual Description: The diagram shows where screws 'a' and 'b' are used to reinforce the assembled structure.
Step 08: Adding Base Supports
Attach twelve 'd' pins/screws to the bottom of the unit for stability or as feet.
Visual Description: Small 'd' fasteners are inserted into the base of the assembled product.
Customer Support
For any questions or assistance, please contact our customer care center.
United States:
- Phone: 001-877-644-9366
- Email: customerservice@aosom.com
- Importer: Aosom LLC, 27150 SW Kinsman Rd Wilsonville, OR 97070 USA
- Made in China
Canada:
- Phone: 416-792-6088
- Email: customerservice@aosom.ca
- Importer: Aosom Canada Inc., 7270 Woodbine Avenue, Unit 307, Markham, Ontario Canada L3R 4B9
- Made in China
United Kingdom:
- Phone: 0044-800-240-4004
- Email: enquiries@mhstar.co.uk
- Importer: MH STAR UK LTD, Unit 27, Perivale Park, Horsenden lane South Perivale, UB6 7RH
- Made in China
Please consider recycling packaging materials. ♻️