SilverStone XE360-SP5 User Manual
High Performance Triple 120mm AIO Liquid Cooler for AMD SP5
Visit us at: www.silverstonetek.com
Contents
- A: Fan Screw x12
- B: Case Screw x12
- C: 4pin Peripheral adapter cable x1
- D: 3 in 1 Fan cable x1
Installation Guide
Step 1: Remove the protection cover of thermal interface material (TIM) or thermal grease. The required amount of TIM has been pre-applied on the bottom of the heat sink. Inspect pre-applied TIM for any damage.
Step 2: Place the heat sink directly on top of the CPU so that the six heat sink mounting screws are aligned with and seated on the six heat sink mounting studs or nut standoffs on the socket stiffener frame.
Step 3: Use a screwdriver with a Torx T20 bit. Adjust the screwdriver torque setting to 12.5~15.0 kgf-cm (10.8~13.0 lbf-in). Before turning on the screwdriver, ensure the screwdriver bit is fully engaged in the cavity of the heat sink mounting screw head. Keep the heat sink mounting screw vertical during installation.
Step 4: Tighten the two diagonal heat sink mounting screws, specifically the #1 and #2 screws. Then, do the same with the remaining four diagonal heat sink mounting screws.
Step 5: Follow the diagonal installation pattern on all six heat sink mounting screws to ensure the bottom of the heat sink is properly seated on the CPU and to prevent the heat sink from tilting.
Diagram shows the heat sink being placed onto the CPU with mounting studs.
Diagram illustrates the order for tightening the six heat sink mounting screws (NO.1, NO.2, NO.3, NO.4, NO.5, NO.6).
Component Connections
PSU Connection:
- Connect the AIO Pump using cable C.
- Connect the CPU Fan using cable D (3-in-1 fan cable).
Illustration depicts the power supply unit (PSU) connecting to the AIO Pump via cable C and the CPU Fan via cable D.