User Manual for SILVERSTONE models including: RM52, RM52 5U Rackmount Server Chassis, 5U Rackmount Server Chassis, Rackmount Server Chassis, Server Chassis, Chassis

Multi-RM52-Manual

RM52 Manual

RM52

22 août 2023 — Graphics card length front radiator fan thickness cannot ... a) Usage in accordance with instructions provided in this manual, with no misuse, overuse,.


File Info : application/pdf, 2 Pages, 5.16MB

PDF preview unavailable. Download the PDF instead.

Multi-RM52-Manual
RM52
5U rackmount server chassis with enhanced liquid cooling compatibility
User manual www.silverstonetek.com
3-1.Remove top panel then remove internal radiator bracket screws
X2

G11248350

Parts package component list
A
x4 D

x4 B

G

C

x4

E

Horizontal to vertical

F

position accessories

A:Case feet

Handle bar accessories

B:Case feet screws D.Handle bar C:Case feet washers bracket screws

E.Handle brackets

4. Motherboard, 2.5" SSD, Power extension cord extension

F.Handle bars Secondary PSU
G.L-shaped brackets extension adapter

H

PSU Mounting screws
80mm fan cage Fan extension cable

I

H.Cable ties
I.Cable management buckle

Mounting for 3.5" HDD, external 80mm fan cage

Motherboard standoff

Manual

1.Remove front panel

3-2.Remove the internal radiator bracket by tilting it at a 15° angle, then lifting it upwards out the chassis

4-1.Remove graphics card retainer screws

4-2.Remove graphics card retainer

1

X4

2

4-3-2.Loosen the thumbscrew to adjust the clamps to the desired angle

tighten

loosen

4-3-3.Utilize two clamps to stabilize the graphics card firmly

4-4-1.Mounting positions - 1 Clamps facing forward

4-4-2.Mounting positions - 2 Clamps facing forward

2-1.Remove front radiator bracket screws

2-2.Press down on the clips from both sides to remove front radiator bracket

X2
X2

4-2-A.Graphics card retainer and internal radiator bracket position adjustments

Position 2

Position 4

Position 1

Position 6

Position 3

Position 5

Internal radiator bracket can be installed in position 6 or 7, when removed, L-shaped bracket (GPU) can be installed on positions 1 to 7

Position 7

L-shaped bracket (GPU) L-shaped bracket (radiator)

4-3-1.Remove thumbscrews and clamps
1

4-4-3.Mounting positions - 3 Clamps facing forward

2
Graphics card width limitation: 1.Graphics card retainer clamps installed: 165mm 2.Graphics card retainer clamps removed: 186mm 3.Graphics card retainer removed: 198mm

Maximum 181mm Maximum 192mm
165 186 198

4-5.Hard drives installed on the graphics card retainer 3.5"HDD

2.5"SSD

or

Clamps facing backward 4-5-A.2.5" SSD installation

Clamps facing backward 5.CPU cooler height limitation

Clamps facing backward

80mm external fan cage installation
6.The thickness of the rear fan cage fans are limited to 38mm
Run the cable through the pass-through hole

Horizontal orientation installation
7.Assemble the handle bars with the L-shaped bracket, then secure the assembly on both sides of the chassis
X2

Maximum 15mm
CPU cooler height limitation Graphics card retainer installed: 181mm Graphics card retainer removed: 192mm

Vertical orientation installation
8-1.Install handle bar onto the flat handle bar bracket

8-2.Install case feet (including case feet washers)

SFX PSU or 3.5" HDD installation guide
9-1.Remove side mounting screws

9-2.Shift the cage off the buckle then remove the cage

9.3.A Insert 3.5" HDD into the cage, then secure with screws 9.3.B Insert SFX PSU into the cage, then secure with screws (Note: To install both primary and secondary PSUs, it's recommended to purchase PP10 cables to operate both PSUs on a single motherboard)

or

10-1.To install the SFX PSU, first remove the plate that sits on the PSU extension adapter pass-through hole with a Phillips screwdriver

Rubber Washer

10-2.Insert the extension adapter cable through the rear of the pass-through hole, then secure with screws

11-A-1.Front radiator installation
Radiator length limitation: 407mm

Front radiator must be installed between the baffles on both sides

11-A-2.Reattach the front radiator bracket module

11-B-1.Internal radiator installation Example

11-B-2.Install the radiator support on one side first

11-B-3.Align the radiator bracket to the clip then slightly tilt and insert the module into the chassis (Note: if the front radiator + fans exceeds total thickness of 60mm, its recommended to shift the radiator mount back one position to open up more clearance)

11-B-4.Install the L-shaped brackets for radiators on the other side of the chassis

1

2

Radiator fans must be installed between front radiator bracket and radiator to achieve the optimal cooling performance whilst avoiding interference with internal components. Must not exceed 78mm.
11-C.Radiator thickness and graphics card length correlations
Graphics card length + front radiator + fan thickness cannot exceed 512mm (without installing internal radiator bracket) Graphics card length + internal radiator + fan thickness cannot exceed 419mm (Front radiator + fan thickness cannot exceed 60mm) (Internal radiator mounted on the frontmost position A) Graphics card length + internal radiator + fan thickness cannot exceed 375mm (Front radiator + fan thickness cannot exceed 78mm (Internal radiator mounted on position B)
BA

12.If a 3.5"HDD is to be installed on the expansion card retainer,it's recommended to install a SFX PSU due to lack of clearance of cabling.

512mm 419mm 375mm

13.When SFX PSU bracket is installed,the depth limitation (including adequate cabel space for the primary PSU is 219mm)13-2.The depth limitation (including adequate cable space of SFX PSU is 180mm)
Max219mm (incl. cable spacel) 183mm

Max180mm (incl. cable spacel)

15.If the 8th slot is to be used for expansion cards,please remove the 2.5"drive tray as appropriate.

Warranty Information
This product has a limited 1 year warranty in North America and Australia.
For information on warranty periods in other regions, please contact your reseller or SilverStone authorized distributor.
 KWWSVVLOYHUVWRQHWHNFRPFQ
Warranty terms & conditions
 3URGXFWFRPSRQHQWGHIHFWVRUGDPDJHVUHVXOWHGIURPGHIHFWLYHSURGXFWLRQLVFRYHUHGXQGHU ZDUUDQW\'HIHFWVRUGDPDJHVZLWKWKHIROORZLQJFRQGLWLRQVZLOOEHIL[HGRUUHSODFHGXQGHU 6LOYHU6WRQH7HFKQRORJ\VMXULVGLFWLRQ D8VDJHLQDFFRUGDQFHZLWKLQVWUXFWLRQVSURYLGHGLQWKLVPDQXDOZLWKQRPLVXVHRYHUXVH RURWKHULQDSSURSULDWHDFWLRQV E'DPDJHQRWFDXVHGE\QDWXUDOGLVDVWHUWKXQGHUILUHHDUWKTXDNHIORRGVDOWZLQGLQVHFW DQLPDOVHWF F3URGXFWLVQRWGLVDVVHPEOHGPRGLILHGRUIL[HG&RPSRQHQWVQRWGLVDVVHPEOHGRU UHSODFHG G:DUUDQW\PDUNVWLFNHUVDUHQRWUHPRYHGRUEURNHQ/RVVRUGDPDJHVUHVXOWHGIURP FRQGLWLRQVRWKHUWKDQRQHVOLVWHGDERYHDUHQRWFRYHUHGXQGHUZDUUDQW\
 8QGHUZDUUDQW\6LOYHU6WRQH7HFKQRORJ\VPD[LPXPOLDELOLW\LVOLPLWHGWRWKHFXUUHQWPDUNHW YDOXHIRUWKHSURGXFWGHSUHFLDWHGYDOXHH[FOXGLQJVKLSSLQJKDQGOLQJDQGRWKHUIHHV 6LOYHU6WRQH7HFKQRORJ\LVQRWUHVSRQVLEOHIRURWKHUGDPDJHVRUORVVDVVRFLDWHGZLWKWKHXVH RISURGXFW
 8QGHUZDUUDQW\6LOYHU6WRQH7HFKQRORJ\LVREOLJDWHGWRUHSDLURUUHSODFHLWVGHIHFWLYH SURGXFWV8QGHUQRFLUFXPVWDQFHVZLOO6LOYHU6WRQH7HFKQRORJ\EHOLDEOHIRUGDPDJHVLQ FRQQHFWLRQZLWKWKHVDOHSXUFKDVHRUXVHLQFOXGLQJEXWQRWOLPLWHGWRORVVRIGDWDORVVRI EXVLQHVVORVVRISURILWVORVVRIXVHRIWKHSURGXFWRULQFLGHQWDORUFRQVHTXHQWLDOGDPDJH ZKHWKHURUQRWIRUHVHHDEOHDQGZKHWKHURUQRWEDVHGRQEUHDFKRIZDUUDQW\FRQWUDFWRU QHJOLJHQFHHYHQLI6LOYHU6WRQH7HFKQRORJ\KDVEHHQDGYLVHGRIWKHSRVVLELOLW\RIVXFK GDPDJHV
 :DUUDQW\FRYHUVRQO\WKHRULJLQDOSXUFKDVHUWKURXJKDXWKRUL]HG6LOYHU6WRQHGLVWULEXWRUVDQG UHVHOOHUVDQGLVQRWWUDQVIHUDEOHWRDVHFRQGKDQGSXUFKDVHU
 <RXPXVWSURYLGHVDOHVUHFHLSWRULQYRLFHZLWKFOHDULQGLFDWLRQRISXUFKDVHGDWHWRGHWHUPLQH ZDUUDQW\HOLJLELOLW\
 ,IDSUREOHPGHYHORSVGXULQJWKHZDUUDQW\SHULRGSOHDVHFRQWDFW\RXUUHWDLOHUUHVHOOHU6LOYHU6WRQHDXWKRUL]HGGLVWULEXWRUVRU6LOYHU6WRQHKWWSZZZVLOYHUVWRQHWHNFRP 3OHDVHQRWHWKDWL<RXPXVWSURYLGHSURRIRIRULJLQDOSXUFKDVHRIWKHSURGXFWE\DGDWHG LWHPL]HGUHFHLSWLL<RXVKDOOEHDUWKHFRVWRIVKLSSLQJRURWKHUZLVHWUDQVSRUWLQJWKH SURGXFWWR6LOYHU6WRQHDXWKRUL]HGGLVWULEXWRUV6LOYHU6WRQHDXWKRUL]HGGLVWULEXWRUVZLOOEHDU WKHFRVWRIVKLSSLQJRURWKHUZLVHWUDQVSRUWLQJWKHSURGXFWEDFNWR\RXDIWHUFRPSOHWLQJWKH ZDUUDQW\VHUYLFHLLL%HIRUH\RXVHQGWKHSURGXFW\RXPXVWEHLVVXHGD5HWXUQ 0HUFKDQGLVH$XWKRUL]DWLRQ50$QXPEHUIURP6LOYHU6WRQH8SGDWHGZDUUDQW\

Additional info & contacts
For North America (usasupport@silverstonetek.com) SilverStone Technology in North America may repair or replace defective product with refurbished product that is not new but has been functionally tested. Replacement product will be warranted for remainder of the warranty period or thirty days, whichever is longer. All power supplies should be sent back to the place of purchase if it is within 30 days of purchase, after 30 days, customers need to initiate RMA procedure with SilverStone Technology in USA by first downloading the " USA RMA form for end-users" form from the below link and follow its instructions. http://silverstonetek.com/contactus.php
For Australia only (support@silverstonetek.com) Our goods come with guarantees that cannot be excluded under the Australian Consumer Law. You are entitled to a replacement or refund for a major failure and for compensation for any other reasonably foreseeable loss or damage. You are also entitled to have the goods repaired or replaced if the goods fail to be of acceptable quality and the failure does not amount to a major failure. Please refer to above "Warranty terms & conditions" for further warranty details. SilverStone Technology Co., Ltd. 12F No. 168 Jiankang Rd., Zhonghe Dist., New Taipei City 235 Taiwan R.O.C. +886-2-8228-1238 (standard international call charges apply)
For Europe (support.eu@silverstonetek.de) For China (support@silverstonetek.com.cn) For all other regions (support@silverstonetek.com)


 



(Pb)















/





 

(Hg)

(Cd)

(Cr(VI))

(PBB)









































6-7 *%7  h*%7 

 (PBDE)
 
  

14.If 3.5"HDD are installed on the expansion card retainer,then the 3.5'HDD installed in below cage are left with 27mm cable clearance



References

Adobe PDF library 17.00 Adobe Illustrator 27.8 (Windows)