UNICOL GK Series Projector Mounts Installation Guide
Models: GKC, GK1, GK2, GK3, GK4
Used with: GAP or GAPU Adapter Plates
Contact: UNICOL | Phone: 01865 767676 | Email: sales@unicol.com | Website: www.unicol.com
Product Overview & Components
This document provides installation instructions for the UNICOL GK Series projector mounts, including models GKC, GK1, GK2, GK3, and GK4. These mounts are designed to be used with either the Gyrolock Adapter Plate (GAP) or the Universal Adapter Plate (GAPU).
Key Specifications
Mounting Type | Max. Weight Capacity |
---|---|
Wall Mounted | 12kg |
Ceiling Mounted | 20kg |
*Please check model-specific details before installing.
For support, please call: +44 (0)1865 767676 or email: sales@unicol.com
Tools and Components
Tools Required
# | Tool |
---|---|
1 | 5mm Allen Key |
2 | |
3 | |
4 | |
5 |
Installers Required
1 |
Components List
# | Description | QTY |
---|---|---|
1 | GK1 Gyrolock | 1 |
2 | Gyrolock Adapter Plate (GAP) | 1 |
3 | Universal Adapter Plate (GAPU) (Optional) | 1 |
4 | ||
5 | ||
6 | ||
7 | ||
8 | ||
9 | ||
10 |
- GKC is a close-to-ceiling version of the GK1 and has no telescopic arm.
- GK2 is a GK1 and comes with a separate extension arm to increase arm length if required.
- GK3 comes complete with a long telescopic arm. Follow these instructions for each of the models above.
- Gyrolock Adapter Plates (GAP) are specific to your projector. Illustrations may differ from your GAP.
- Universal Adapter Plates (GAPU) fit many projectors. They all have identical connection systems.
Standard Installation Procedure
Step 1: Mount Ceiling Plate
Using the four mounting slots cut out on the ceiling plate, determine where you want to install, mark it, and fix into position. If fixing to a slanted ceiling, adjust the angle of the body by loosening the screws at the side, levelling, and tightening again.
Please consider cabling and fixings prior to installation. Please check surface can support 5x the combined solutions weight.
Step 2: Attach Adapter Plate to Projector
Fix the Gyrolock Adapter Plate (GAP) to the projector using the screws provided. The GAP is designed specifically for your projector – tighten all screws.
Step 3: Engage Projector with Gyrolock
Offer the projector up to the Gyrolock so that the GAP engages with the corresponding Trilok mechanism. There is a bowl shape on the bottom of the Trilok to aid location. Once located and with upward pressure maintained, turn the projector horizontally through 180 degrees.
Step 4: Lock Gyrolock to Adapter Plate
Release pressure to ensure the projector is correctly in place, then tighten the three knurled screws to lock the Gyrolock to the GAP.
Step 5: Adjust Projector Alignment
Using the pan, tilt, and yaw levelling functions, adjust the projector alignment. Finally, tighten all dome-headed screws using the Allen key provided.
Step 6: Adjust Drop Length
The length of drop can be adjusted by loosening the Allen screws, adjusting the telescopic section as required, and fully re-tightening the screws.
Alternative Mounting Configurations
Floor or Table Mounted
Step 1: Attach Fixing Plate
Invert the Gyrolock and remove the two Allen screws at the fixing plate. Swivel the Gyrolock arm mechanism through 180 degrees and locate the arm's top edge into the slots on the fixing plate. Refit the Allen screws and tighten. Screw the fixing plate into the horizontal surface (fixing screws not provided).
Wall Mounted
Step 1: Mount to Wall
Orientate the Gyrolock in the manner shown above and mount it to the wall through the fixing plate. Because of the additional cantilever forces in this orientation, the projector weight is restricted to 12kg.
Truss Mounted
Step 1: Attach Truss Clamp
Loosen the truss clamp to open it up. Place it around the truss, close the clamp, and tighten until secure.
Please consider cabling and fixings prior to installation. Please check surface can support 5x the combined solutions weight.
Please carry on with Step 2 on page 3.
Column Mounted
Step 1: Install Column Mount
Using the four ceiling mounting slots, as shown above, determine where you want to install your mount, mark it, and fix into position.
Please consider cabling and ceiling fixings prior to installation. Please check surface is capable of supporting 5x the combined solutions weight.
Step 2: Secure Column to Mount
Slide all cabling through the column and through the gap in the ceiling plate socket. Being mindful of the cables, slide the column into the socket, ensuring that the two holes either side align with those on the mount. Using the through bolt, secure the column into place and tighten the two grub screws at the rear. Follow Step 2 on page 3.
Step 3: Attach Mount Adapter
Slide the mount adapter into the bottom of the column and secure on either side of the column using the dome-headed screws provided. Carry on with Step 3 on page 3.
Fitting Universal GAP Plate
Step 1: Align Universal GAP Plate
Align the Universal Gyrolock Adapter Plate (GAPU) to the projector by loosening the large knurled screws and adjusting the arms so that the small knurled fixing screws align with the projector fixing holes.
Step 2: Secure Universal GAP Plate
Once aligned, tighten the small knurled fixing screws into the projector. If there are any contours on the projector fixing plane, there is height adjustment using the small knurled fixing screw. Tighten all large knurled fixing screws to secure the GAPU.
Step 3: Complete Installation
Follow Steps 3 to 6 on Pages 3 & 4 to complete the installation.