BROGRUND
General Installation Compliance
Installation must be performed in compliance with current local construction and plumbing regulations. If in doubt, contact a professional.
Safety First: Water Shut-off
⚠️ IMPORTANT: Switch off the main shut-off valve before changing the mixer tap.
Tools and Preparation
Ensure you have the necessary tools for installation. These typically include:
- Screwdriver ?
- Wrench ?
- Pencil ✏️
- Spirit Level ?
- Tape Measure ?
- Tape ?
- Thermometer ?️
- Sealant Gun ?
- Sealant Tubes ?
- Drill ?
- Drill Bits ?️
If you have any questions or require assistance, contact IKEA customer service.
Installation Steps
Step 1: Flush the Water System
Before connecting the product to the water supply system, water should be flushed through the system to remove all debris.
Measurements for mounting:
- Distance between pipe connections: 130-170 mm (5" - 6 1/4")
- Pipe connection height from wall: 150 mm (5 3/8")
- Pipe connection depth: 22-27 mm (7/8-1 1/16")
Step 2 & 3: Silicone Note
ℹ️ NOTE: Silicone is not included with this product.
Step 4: Important Tightening Caution
⚠️ IMPORTANT: Do not tighten too hard. Overtightening can damage hoses, pipes, and washers.
Step 5: Connecting the Shower
Connect the shower hose and head to the mixer unit as shown in the diagram.
Step 6-9: Adjusting Water Temperature
?️ Adjusting Water Temperature:
Depending on your individual water supply system, it may be necessary to adjust the mixer to ensure the correct and safe water temperature is supplied.
Recommended temperature: 37-39°C
Maximum safe temperature: 48°C
Follow the diagrams to make the necessary adjustments for optimal temperature control.
Maintenance
ℹ️ MAINTENANCE: Check at regular intervals to ensure the installation is not leaking.