Safety First
IMPORTANT! Always shut off power to the circuit before starting installation work. In some countries, electrical installation work may only be carried out by an authorized electrical contractor. Contact your local electricity authority for advice.
The maximum load for this cord set is 2 kg / 4 lb.
Installation Steps
The following steps illustrate the general process for installing the HEMMA cord set. Always refer to specific diagrams for detailed guidance.
- Prepare the Canopy: Ensure the power to the circuit is off. The diagram shows a cord being fed through a canopy, with an arrow indicating upward movement.
- Connect Wires: The diagram shows a close-up of a connector block. Wires are inserted into the block, with arrows indicating insertion and a turning motion for securing. The text '2x' suggests repeating this for two connections.
- Secure the Cord Set: The diagram shows the canopy being moved upwards along the cord, with a circular arrow indicating a tightening or screwing motion at the base of the canopy to secure it.
Note: The diagrams provided are illustrative. Always follow the specific visual instructions included with your product.