Outsunny 845-681 Outdoor Storage Shed Assembly Instructions
Introduction
This document provides assembly instructions for the Outsunny 845-681 Outdoor Storage Shed. Please read all instructions carefully before beginning assembly. Retain this manual for future reference.
Languages included: English, French, Spanish, German, Italian.
Important Note: Ensure all parts are present and undamaged before starting. Follow the steps sequentially for correct assembly.
Parts List
The shed is supplied in 2 boxes. Below is a comprehensive list of all parts:
Part ID | Description | Quantity | Length (mm) |
---|---|---|---|
EP1 | Panel | x14 | 1850 |
EP2 | Panel | x6 | 1240 |
EP4 | Panel | x2 | 1850 |
EU1 | Channel/Profile | x8 | 1134 |
EU2 | Channel/Profile | x4 | 1125 |
EU3 | Channel/Profile | x1 | 871 |
EA1 | Channel/Profile | x4 | 750 |
EGL1 | Roof Support | x2 | 1083 |
EGR1 | Roof Support | x2 | 1083 |
ETL1 | Eave/Trim | x4 | 1235 |
ETL2 | Eave/Trim | x2 | 593 |
ETL3 | Eave/Trim | x2 | 593 |
ER1 | Roof Panel | x1 | 783 |
ER2 | Roof Panel | x1 | 402 |
EV1 | Beam/Profile | x1 | 1164 |
ET1 | Profile | x1 | 871 |
ET2 | Profile | x2 | 1848 |
EM | Profile | x2 | 1848 |
EDR | Door Panel | x1 | 1791 |
EDL | Door Panel | x1 | 1791 |
Hardware List
The hardware kit contains various fasteners and components:
Part ID | Description | Quantity |
---|---|---|
ELG | Eave Component | x2 |
EG1 | Corner Connector | x8 (+2 Spare) |
EJ1 | Connector | x4 (+2 Spare) |
EH | Hinge Plate | x2 |
L3 | Bolt/Rod | x36 |
UV | Window Panel | x1 |
S3 | Screw | x146 (+2 Spare) |
S7 | Screw | x58 (+2 Spare) |
S16 | Screw | x6 (+2 Spare) |
EC1 | Anchor Component | x8 |
S11 | Bolt/Nut | x8 |
EV2 | Beam Component | x4 |
EV4 | Beam Component | x2 |
MSB | Bracket | x6 |
L1A | Profile | x4 |
H2 | Hinge | x1 |
H3 | Hinge | x1 |
H1B | Hinge Plate | x1 |
PH1 | Window Frame | x2 |
PH2 | Window Frame | x2 |
PH3 | Window Frame | x2 |
M4 | Nut | x12 |
Lock | Padlock | x1 |
Gloves | Protective Gloves | x1 pair |
Drill | Drill Bit | x1 |
Required Tools
The following tools are recommended for assembly:
Icon | Tool Name |
---|---|
[Gloves] | Gloves |
[Safety Glasses] | Safety Glasses |
[Shoes] | Shoes |
[Riveting Gun] | Riveting Gun |
[Sleeve] | Sleeve |
[Power Drill] | Power Drill |
[Screwdriver] | Screwdriver |
[Pencil] | Pencil |
[Tape Measure] | Tape Measure |
[Ladder] | Ladder |
Assembly Tips
- Clear a working area to allow access on all 4 sides. A raised work surface will make assembly easier.
- All parts are identified. When working through the instructions page by page, the diagrams show where each part is positioned.
- Some holes are pre-punched to allow fixing using self-tapping screws or rivets. Where additional holes are required, a drill bit is included.
- Before starting, to avoid accidental injury, wear gloves to protect your hands, safety glasses to protect your eyes, and shoes or boots to protect your feet.
- Keep children away from the construction site.
- Most assembly can be completed by one person; assistance may be needed during the erection stage.
- Note: Local government authorities may have rules and regulations on shed installation, and you may need approval to erect this shed.
- If accessories are slightly deformed, use tools to straighten them; this will not affect normal use.
Assembly Steps
Panel Assembly: Rear Walls
Parts: EP1 (x6), EU1 (x4), EJ1 (x2), S3 (x8)
Step 1: Lay out six EP1 panels. Attach one EU1 profile to the top edge of two EP1 panels and one EJ1 connector to the top edge of another EP1 panel. Repeat for the other side.
Diagram shows EP1 panels being prepared with EU1 and EJ1 components attached to their top edges.
Step 2: Connect the prepared EP1 panels using the EJ1 connectors. Ensure the panels are aligned correctly.
Diagram shows two sets of EP1 panels being joined by EJ1 connectors.
Step 3: Secure the structure by drilling S3 screws through the designated holes on both sides of the connectors (EJ1) and into the panels (EP1). A magnified view shows the screw placement.
Diagram shows S3 screws being inserted into the assembled rear wall structure, with close-ups indicating screw points and the note "Drill S3 on both sides to improve the stability of connector". Measurements of 18mm are indicated for screw placement.
Panel Assembly: Left & Right Walls
Parts: EP1 (x3), EU2 (x2), S3 (implied)
Step 1: Lay out three EP1 panels. Attach one EU2 profile to the top edge of two EP1 panels.
Diagram shows EP1 panels being prepared with EU2 components attached to their top edges.
Step 2: Connect the prepared EP1 panels using the EU2 profiles. Ensure alignment.
Diagram shows two sets of EP1 panels being joined by EU2 profiles.
Step 3: Secure the structure by drilling S3 screws through the designated holes. Measurements of 18mm are indicated for screw placement.
Diagram shows S3 screws being inserted into the assembled left/right wall structure, with close-ups indicating screw points and measurements of 18mm.
Panel Assembly: Front Walls (Steps 1-2)
Parts: EP1 (x2), EP4 (x2), EU1 (x4), ET2 (x2), EM (x2), EJ1 (x2), S3 (x8)
Step 1: Assemble the front wall sections. This involves joining EP1, EP4, EU1, EM, EJ1, and ET2 components. The diagram shows two main sections being built, each with multiple panels and profiles.
Diagrams show the assembly of two distinct front wall sections using various panels (EP1, EP4) and profiles (EU1, EM, EJ1, ET2). "Colorside" is indicated on some panels.
Step 2: Join the two assembled front wall sections together. Ensure they are aligned and square.
Diagram shows the two front wall sections being connected. Close-ups indicate screw placement (S3) with 18mm measurements.
Panel Assembly: Front Walls (Steps 3-4)
Parts: ET2, EM, EP4, EU1, S3
Step 3: Continue assembling the front wall structure. This step involves attaching ET2 and EM profiles to the existing panels, likely reinforcing the structure. The diagrams show specific connection points and the use of S3 screws.
Diagrams labeled STEP3-3, STEP3-4, STEP3-5, STEP3-6 show the attachment of ET2 and EM profiles to panels like EP4 and EU1 using S3 screws. Measurements of 100mm and 18mm are indicated.
Step 4: Further assemble the front wall panels. This involves inserting parts (labeled 'PART a', 'PART b', 'PART c') into the EU1 and EP4 panels. The diagrams show specific insertion methods.
Diagrams STEP4-1, STEP4-2, STEP4-3 show the insertion of components into EU1 and EP4 panels, indicating specific alignment and connection points.
Panel Assembly: Front Walls (Steps 4-6)
Parts: EU1, EP4, EJ1, S3, ET2
Step 4 (cont.): Continue inserting parts ('PART b', 'PART d') into EU1 and EP4 panels.
Diagrams STEP4-4, STEP4-5, STEP4-6 show the insertion of components into EU1 and EP4 panels, indicating specific alignment and connection points.
Step 5: Join the assembled front wall sections using EJ1 connectors. Ensure alignment.
Diagram shows two large assembled front wall sections being joined by EJ1 connectors.
Step 6: Secure the structure by drilling S3 screws into the designated holes. The diagram shows multiple connection points being secured with S3 screws and ET2 profiles.
Diagrams STEP6-1 and STEP6-2 show the attachment of S3 screws and ET2 profiles to the assembled front wall structure. Measurements of 871mm are indicated for the overall width.
Shed Assembly: Joining Walls
Parts: EG1 (x8), S3 (x32)
Step 1: Assemble the main frame by joining the rear wall, left wall, right wall, and front wall sections. Use EG1 corner connectors and S3 screws to join the panels at the corners.
Diagram shows the four walls being joined together to form the basic shed structure. EG1 connectors are shown at the corners, secured by S3 screws. A measurement of 895mm is indicated for the width.
Step 2: Reinforce the corners by drilling S3 screws into the designated points on the EG1 connectors and the wall panels. This improves stability and prevents sunlight ingress.
Diagrams show close-ups of the corner connections, illustrating the insertion of S3 screws into EG1 connectors and wall panels. The note "Drill S3 on both sides to improve the stability of connector" is present.
Anchoring Assembly
Parts: EC1 (x8), S11 (x8), S3 (x16), L3 (x16)
Step 1: Ensure the shed is level and the walls are square (90 degrees). Mark anchor points on the ground.
Diagram shows the shed from above, with diagonal measurements L1 and L2 indicated to ensure squareness. Anchor points are marked around the base. Measurements of 200mm are shown from corners.
Step 2: Use a 10mm drill bit to drill holes 60mm (2.4 inches) deep at the marked anchor points.
Diagram shows a drill bit entering a concrete surface.
Step 3: Tap concrete fixing bolts into the holes. Place the anchor components (EC1 & S11) and fasten them with nuts.
Diagram shows an anchor component (EC1) being placed over a bolt, with a washer (S11) and nut (L3) being fastened.
Step 4: Secure the shed using the anchor kit (EC1 & S11) when fixing to a concrete base.
Diagram shows the final anchoring step, securing the shed base to the ground.
Shed Assembly: Joining Walls (Corner Reinforcement)
Parts: S3 (x8)
Step: Use S3 screws to fix the corners and make the walls firm, preventing sunlight from getting in. Apply screws at specified points.
Diagram shows the shed structure with S3 screws being inserted into the corners at multiple points. Measurements of 500mm are indicated for screw placement.
Shed Assembly: Front Doors
Parts: EDL (x1), EDR (x1), EA1 (x2), EH (x1), M4 (x6), SH1 (x3), UV (x1), S7 (x17), S16 (x3), PH1 (x1), PH2 (x1), PH3 (x1), MSB (x3)
Step 1: Assemble the left and right doors. This involves attaching various profiles (EA1, EH), hinges (SH1), and hardware (S7, S16, M4, MSB) to the door panels (EDL, EDR). The UV panel is attached to PH3 frames.
Diagrams show the assembly of the left and right doors. Components like EDL, EDR, EA1, EH, SH1, S7, S16, M4, MSB are shown being attached. The UV panel is shown being attached to PH3 frames.
Step 2: Prepare the door frame components, including attaching the UV panel to PH3 frames.
Diagram shows the UV panel being attached to PH3 frames.
Step 3: Attach the assembled doors to the shed structure using hinges (H2, H3, H1B) and associated hardware (S7, SH1).
Diagrams show the doors being attached to the shed frame. Hinges (H2, H3, H1B) and screws (S7, SH1) are used. Note: The hinges of left and right doors are consistent.
Shed Assembly: Door Frame
Parts: EU3 (x1), ET1 (x1), ET2 (x2), S3 (x4)
Step 1: Install the door frame components (EU3, ET1, ET2) into the shed opening.
Diagram shows the shed with the door frame components being positioned.
Step 2: Secure the door frame using ET1 and ET2 profiles, attaching them to the shed panels with S3 screws. Measurements of 100mm are indicated.
Diagrams show close-ups of the door frame assembly, indicating the use of ET1, ET2, and S3 screws. Measurements of 100mm are shown.
Step 3: Further secure the door frame assembly with additional ET2 profiles and S3 screws.
Diagram shows the final attachment of ET2 profiles and S3 screws to the door frame structure.
Shed Assembly: Triangle
Parts: EV2 (x4), EGL1 (x2), S3 (x16), EGR1 (x2), L3 (x4)
Step 1: Attach EGL1 and EGR1 roof supports to the top of the shed walls. Use EV2 components for connection.
Diagram shows the EGL1 and EGR1 roof supports being attached to the shed's upper structure, using EV2 components.
Step 2: Install the main roof beams (L3) and secure them with S3 screws and EV2 components. Ensure correct alignment and angle.
Diagram shows the roof structure being assembled with L3 beams, EV2 components, and S3 screws. Measurements of 72mm and 40mm are indicated.
Step 3: Continue securing the roof structure with EGR1 and S3 screws.
Diagram shows EGR1 components being attached with S3 screws.
Step 4: Finalize the roof structure assembly, ensuring all components are securely fastened.
Diagram shows the completed roof structure, with measurements of 72mm indicated.
Shed Assembly: Main Beam
Parts: EV1 (x1), EV4 (x2), S3 (x8), L1A (x4)
Step 1: Attach EV1 and EV4 components to the main structure, securing them with S3 screws.
Diagram shows EV1 and EV4 components being attached to the shed's upper structure with S3 screws.
Step 2: Assemble the main beams using L1A profiles and EV4 components.
Diagrams STEP2-1 and STEP2-2 show the assembly of main beam sections using L1A and EV4 parts.
Step 3: Install the assembled main beams into the shed structure, securing them with S3 screws.
Diagram shows the main beams being installed and secured with S3 screws.
Shed Assembly: Roof Panels
Parts: EP2 (x6), ER1 (x1), ER2 (x1), S3 (x28)
Step 1: Attach the roof panels (EP2) to the roof structure. Secure them using S3 screws, along with ER1 and ER2 components.
Diagram shows EP2 roof panels being attached to the shed's roof frame, secured by S3 screws and ER1/ER2 components.
Step 2: Continue attaching the remaining roof panels, ensuring proper overlap and alignment. Secure with S3 screws.
Diagram shows the attachment of more EP2 roof panels. A tip "Do not fix S3 in this step" is shown for certain points, implying alternative fastening or a later step.
Shed Assembly: Eaves & Logos
Parts: ETL1 (x4), ETL2 (x2), ETL3 (x2), ELG (x2), S3 (x18)
Step 1: Attach the eaves (ETL1, ETL2, ETL3) and ELG components to the top edges of the shed walls and roof structure. Secure with S3 screws.
Diagram shows ETL1, ETL2, ETL3, and ELG components being attached to the shed's eaves and roofline, secured with S3 screws.
Step 2: Continue securing the eaves and ELG components with S3 screws, ensuring a tight fit.
Diagram shows further attachment of ETL1, ETL2, ETL3, and ELG components with S3 screws.
Protection
Parts: L3 (x16), EV1 (x1), L1A (x1), S3 (x1), EV4 (x1)
Step: Perform final checks and apply protection measures. This may involve securing specific components with L3, EV1, L1A, S3, and EV4 parts as indicated.
Diagram shows the completed shed with final components being attached for protection. Specific parts like L3, EV1, L1A, S3, and EV4 are shown in place.