Bernstein NT3311 Freestanding Bath Tap Assembly Instructions
Model: NT3311
Brand: BERNSTEIN
Product Overview and Dimensions
This document provides assembly instructions for the BERNSTEIN NT3311 Freestanding Bath Tap. It is designed for installation in bathrooms, offering a stylish and functional addition to bathing spaces.
Key Dimensions:
- Height: 700 mm
- Height to spout: 315 mm
- Spout reach: 245 mm
- Handle height: 96 mm
- Required installation depth: > 25 mm
The tap features clear indicators for hot and cold water supply.
Parts Included (Lieferumfang)
The following components are included in the delivery:
- 1: Base assembly with integrated water connections
- 2: Mounting screws and washers for base
- 3: Main tap body with flexible hoses
- 4: Vertical support column
- 5: Fastening hardware (nuts, bolts) for column
- 6: Base plate/cover
- 7: Handle assembly
- 8: Spout
- 9: Shower hose
- 10: Hand shower
Assembly Steps
Step 1: Prepare Installation Site and Water Lines
Drill the necessary holes in the floor according to the dimensions of the base assembly. Connect the hot and cold water supply lines to the designated ports on the base assembly (1).
Step 2: Secure Base Assembly
Position the base assembly (1) over the water connections. Ensure the water lines are correctly routed. Place the base plate/cover (6) and secure the assembly to the floor using the provided mounting screws and washers (2). Use a spirit level to ensure the base is perfectly horizontal. The installation depth must be greater than 25 mm.
Step 3: Connect Water Hoses
Connect the flexible hoses from the main tap body (3) to the corresponding hot and cold water outlets on the base assembly (1). Ensure a secure and watertight connection.
Step 4: Attach Vertical Column
Insert the vertical support column (4) into the base assembly (1). Align the column with the base and ensure it is seated correctly.
Step 5: Secure Vertical Column
From underneath the floor or base structure, secure the vertical column (4) to the base assembly (1) using the provided fastening hardware (5), such as nuts and bolts. Tighten all hardware securely.
Step 6: Mount Main Tap Body
Place the main tap body (3) onto the secured vertical column (4). Ensure it is properly aligned and seated.
Step 7: Attach Hand Shower and Hose
Connect the shower hose (9) to the designated outlet on the tap body. Attach the hand shower (10) to the other end of the shower hose (9). Mount the hand shower holder onto the tap body in the desired position.
Step 8: Final Assembly and Checks
Attach the spout (8) and the handle assembly (7) to the tap body. Ensure all connections are tight and leak-free. Turn on the water supply and check for proper operation, including water flow and temperature control, and inspect for any leaks.